-
- News
- Books
Featured Books
- design007 Magazine
Latest Issues
Current IssueLevel Up Your Design Skills
This month, our contributors discuss the PCB design classes available at IPC APEX EXPO 2024. As they explain, these courses cover everything from the basics of design through avoiding over-constraining high-speed boards, and so much more!
Opportunities and Challenges
In this issue, our expert contributors discuss the many opportunities and challenges in the PCB design community, and what can be done to grow the numbers of PCB designers—and design instructors.
Embedded Design Techniques
Our expert contributors provide the knowledge this month that designers need to be aware of to make intelligent, educated decisions about embedded design. Many design and manufacturing hurdles can trip up designers who are new to this technology.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - design007 Magazine
The Electronic Component Shortage Crisis: A Veteran Engineer’s Perspective
February 18, 2019 | John Watson, CID, Legrand Inc.Estimated reading time: 1 minute
Most of us are familiar with the defense readiness condition (DEFCON) levels. If we could apply such a DEFCON level to the electronics industry and how it relates to the issue of component shortages, we would be sitting at a DEFCON 1, meaning nuclear war is imminent.
This issue has a huge effect on everyone who works in the electronics field, impacting schedules and how things are done. The problem began to hit in earnest about a year ago in 2017. It first appeared as longer lead times on multilayer ceramic capacitors (MLCCs) and tantalum capacitors. With longer lead times, the available stock began to disappear, and before we knew it, we had a perfect storm and an international crisis.
From where we stand now, at the beginning of 2019, we see lead times for some components in the short range of up to 16 weeks; medium-to-high is 32 weeks, and long lead times are as far out as 80 weeks. In other words, if we ordered a component today, it would arrive in over a year a half from now (maybe).
This all started with the capacitors (we will see why later), but we now see other component series being sucked into this problem.
With such volatility in the market, it has brought those who were not prepared for it to a standstill.
What Is Driving This Crisis?
It has come down to a simple principle of economics supply and demand. While the supply has gone way down, the demand for many components has exploded. The component manufacturers have not kept pace with the demand for several reasons.
There are three main sectors of the electronic industry driving these component shortages.
To read this article, which appeared in the January 2019 issue of Design007 Magazine, click here.
Suggested Items
LPKF Extends Contract of CEO Klaus Fiedler until 2028
04/24/2024 | LPKFThe Supervisory Board of LPKF Laser & Electronics SE has decided to extend the contract of Dr. Klaus Fiedler as CEO until 31 December 2028. "Under the leadership of Klaus Fiedler, LPKF has undergone some extensive transformation since he joined just over 2 years ago.
Women MAKE Awards Recognizes GlobalFoundries’ Jennifer Robbins and Katelyn Harrison for Manufacturing Excellence
04/24/2024 | GlobalFoundriesThe Manufacturing Institute (MI)—the workforce development and education affiliate of the National Association of Manufacturers—honored two outstanding women from GlobalFoundries (GF) at their annual Women MAKE Awards. Jennifer (Jenny) Robbins, Senior Director, Central Facilities, was recognized as a 2024 Women MAKE Awards Honoree, while Katelyn Harrison, Senior Integration Engineer, was honored as an Emerging Leader.
US Department of Defense Selects Intel Foundry for Phase Three of RAMP-C
04/23/2024 | IntelThe U.S. Department of Defense (DoD) has awarded Intel Foundry Phase Three of its Rapid Assured Microelectronics Prototypes - Commercial (RAMP-C) program.
Robin Hayes Selected to Lead Airbus in North America
04/23/2024 | AirbusAirbus SE has announced that C. Jeffrey Knittel is retiring as Chairman and Chief Executive Officer of Airbus Americas, Inc. effective June 3, 2024, after serving as the region’s top executive since 2018. He will remain with Airbus through a transition period. Robin Hayes, former CEO of JetBlue Airways, has been selected to succeed him.
GPV's Function and Site Engagement Meeting in Switzerland
04/23/2024 | GPVThe GPV Executive Leadership Team met with the MDs and local management teams from our German, Swiss and four Nordic Operating Business Units. The meeting was hosted by GPV Electronics CH in Mendrisio, Switzerland.