-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueIPC APEX EXPO 2024 Pre-show
This month’s issue devotes its pages to a comprehensive preview of the IPC APEX EXPO 2024 event. Whether your role is technical or business, if you're new-to-the-industry or seasoned veteran, you'll find value throughout this program.
Boost Your Sales
Every part of your business can be evaluated as a process, including your sales funnel. Optimizing your selling process requires a coordinated effort between marketing and sales. In this issue, industry experts in marketing and sales offer their best advice on how to boost your sales efforts.
The Cost of Rework
In this issue, we investigate rework's current state of the art. What are the root causes and how are they resolved? What is the financial impact of rework, and is it possible to eliminate it entirely without sacrificing your yields?
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - smt007 Magazine
This Month in SMT007 Magazine: Robustness Is Not the Same as Reliability
September 2, 2020 | I-Connect007 Editorial TeamEstimated reading time: 2 minutes
Bob Neves discusses a disconnect he sees in reliability testing between what’s being tested and what happens out in the field, as well as why most reliability tests these days should instead be considered robustness tests.
Nolan Johnson: What are the current dynamics in assembly reliability?
Bob Neves: My history and focus are primarily within the electronics industry surrounding PCBs. My customer base at Microtek, and for testing and evaluation, are the suppliers to the PCB manufacturers, the PCB manufacturers themselves, and the users of PCBs. When we talk about testing, most people who buy PCBs look at the PCB like they would look at a resistor or capacitor—it’s just another component on their build list. The truth is that you really can’t treat the PCB as a component. You need to look at it as a very complex subsystem like you were buying a power supply or some other multi-component assembly that did something for you rather than just a single attribute component like a capacitor or resistor.
The PCB is relied on for passing signals between components and isolating signals from places they’re not supposed to be. When things go bad in an electronics assembly, those are typically the areas where you start looking. Is the signal getting to the correct spot, or are we losing signal some place where we’re supposed to have a signal? A lot of problems that I’ve experienced have to do with the fact that something’s gone wrong in the interconnection or isolation process on the PCB. Engineers come to me, saying, “If I press down on this component, it works,” or, “If I heat it up with a hot air gun, my system works. But if I take it off, it doesn’t work anymore.” That’s where a lot of failures end up being PCB related.
Reliability starts for a product after the component attachment process. After you’ve put all the components on, changed anything that was bad, tested it, and it’s ready to put it in the field, that’s when reliability starts. Any reliability you’re testing—whether it’s on the bare PCB, a component, or the entire assembly— needs to have some sort of simulation that shows that it’s gone through this component attachment process, getting you all the way up to the point of where it would be going out the door. That’s one feature that not everyone does before testing. A lot of people will take a component and then do testing on that component as it comes in the door, or they’ll electrically test a PCB before component attachment and say, “Everything’s great.” But any type of testing that you do to see how long your product might last needs to have some sort of simulation of the soldering process before testing. That simulation also needs to include the rework and repair part of the component attachment process.
To read this entire conversation, which appeared in the September 2020 issue of SMT007 Magazine, click here.
Suggested Items
Reducing Nitrogen Consumption in Convection Soldering with Rehm Thermal Systems' Patented Mechatronic Curtain
03/28/2024 | Rehm Thermal SystemsCurrent developments indicate a need for larger throughput heights due to the trend towards e-mobility, which in turn increases nitrogen consumption for process inertization. Rehm Thermal Systems responds to this issue with an innovative solution: the mechatronic curtain.
Europlacer Announces Introductory Promotions for 2024 IPC APEX EXPO
03/27/2024 | EuroplacerEuroplacer, a leading provider of SMT assembly solutions, is excited to announce special introductory promotions for its latest products at the upcoming 2024 IPC APEX EXPO, scheduled to take place April 9-11, 2024 at the Anaheim Convention Center in California.
ITW EAE Wins New Product Introduction Award for Electrovert® Wave Soldering Machine Deep Wave
03/26/2024 | ITW EAEITW EAE is proud to announce that it has earned a 2024 New Product Introduction (NPI) Award for Electrovert’s Deep Wave option for wave soldering machines. This new, innovative system provides the ability to pump up to a 20 mm wave height.
Green Circuits Unveils Innovative Stacked Capacitors Assembly Process
03/21/2024 | Green CircuitsGreen Circuits, a full-service Electronics Manufacturing Services (EMS) partner to leading OEMs, today announced a groundbreaking advancement in process engineering with the successful implementation of an innovative assembly technique for stacked capacitors.
Mek's Next-Gen AOI Technology Takes Center Stage at IPC APEX EXPO 2024
03/19/2024 | MEKMek is excited to announce its presence at IPC APEX EXPO, North America's largest electronics manufacturing event, in Anaheim, California, from April 6-11, 2024. Attendees are invited to visit Mek at booth #1433 to explore the latest AOI technology offerings.