Most Comprehensive Analysis of Electricity Reliability Trends
August 25, 2015 | Lawrence Berkeley National LaboratoryEstimated reading time: 2 minutes
In the most comprehensive analysis of electricity reliability trends in the United States, researchers at Lawrence Berkeley National Laboratory (Berkeley Lab) and Stanford University have found that, while, on average, the frequency of power outages has not changed in recent years, the total number of minutes customers are without power each year has been increasing over time.
Reliability-Cover-Final
The researchers pinpointed what utilities and their regulators refer to as “major events,” or events generally related to severe weather, as the principal driver for this trend. “This finding suggests that increasingly severe weather events are linked to a 5-10% increase in the total number of minutes customers are without power each year,” said Berkeley Lab Research Scientist and Stanford PhD candidate, Peter Larsen, the lead author.
The researchers analyzed reports for a large cross-section of utilities representing nearly 70 percent of U.S. electricity customers spanning 13 years from 2000 to 2012. Their report, “Assessing Changes in the Reliability of the U.S. Electric Power System,” is available here.
Although a 2013 White House report noted that major power outages and severe weather events are increasing, this study is the first of its kind to use econometric analysis techniques to statistically correlate these events with electricity reliability. Most studies of reliability have relied on information that reflects only the largest power outages. Yet, over the course of any given year, the largest events typically account for no more than 10 percent of all power outages. This study, by relying on information for all power outages, both large and small, conclusively identifies a trend that is linked directly to these larger events.
One surprise was that the study did not find a consistent link between reliability and utility transmission and distribution (T&D) expenditures. “We expected to find that increased spending on T&D would lead to improved reliability, but it is possible that a combination of proactive versus reactive utility maintenance policies may be off-setting this effect on reliability,” Larsen said. He anticipates that future research will be able sort this out through more detailed analysis of utility spending practices.
Co-author and Berkeley Lab Staff Scientist Joseph Eto said: “We hope the findings from the study will provide a more solid basis upon which to ground future private and public decisions on the long-term reliability of the U.S. electric power system.”
This work was funded by the Office of Electricity Delivery and Energy Reliability, National Electricity Delivery Division of the U.S. Department of Energy. Other co-authors were Kristina H. LaCommare of Berkeley Lab and James L. Sweeney of Stanford.
About Lawrence Berkeley National Laboratory
Lawrence Berkeley National Laboratory addresses the world’s most urgent scientific challenges by advancing sustainable energy, protecting human health, creating new materials, and revealing the origin and fate of the universe. Founded in 1931, Berkeley Lab’s scientific expertise has been recognized with 13 Nobel prizes. The University of California manages Berkeley Lab for the U.S. Department of Energy’s Office of Science.
Suggested Items
US Department of Defense Selects Intel Foundry for Phase Three of RAMP-C
04/23/2024 | IntelThe U.S. Department of Defense (DoD) has awarded Intel Foundry Phase Three of its Rapid Assured Microelectronics Prototypes - Commercial (RAMP-C) program.
ZESTRON Welcomes Whitlock Associates as New Addition to their Existing Rep Team in Florida
04/19/2024 | ZESTRONZESTRON, the leading global provider of high-precision cleaning products, services, and training solutions in the electronics manufacturing and semiconductor industries, is thrilled to announce the addition of Whitlock Associates to its esteemed network of sales representatives.
Real Time with... IPC APEX EXPO 2024: AI Implementation at Omron
04/18/2024 | Real Time with...IPC APEX EXPOEditor Nolan Johnson and Omron Product Manager Nick Fieldhouse discuss the company's focus on AI implementation to enhance customer experience and results. They address programming challenges and how AI can help customers achieve better outcomes with less experience. Omron's AI is compatible with existing systems, facilitating easy upgrades.
Cadence Unveils Palladium Z3 and Protium X3 Systems
04/18/2024 | Cadence Design SystemsThe Palladium Z3 and Protium X3 systems offer increased capacity, and scale from job sizes of 16 million gates up to 48 billion gates, so the largest SoCs can be tested as a whole rather than just partial models, ensuring proper functionality and performance.
Ark Electronics Expands Global Manufacturing Factory Network in North America and Europe
04/17/2024 | PRNewswireElectronic Manufacturing Company Ark Electronics recently announced the expansion of its Global Factory Network with the addition of Electronics Manufacturing Service (EMS) capabilities in Mexico and Europe.