What It Takes to Be a Milaero Supplier, Part 3
April 28, 2020 | Anaya Vardya, American Standard CircuitsEstimated reading time: 4 minutes

Introduction
The decision to pursue military and aerospace (milaero) certification impacts every facet of the organization, and not every shop is prepared to make this transformation. This is the third article in a four-part series, breaking down what it takes in sales and customer service, engineering and CAM, purchasing and quality, and manufacturing. Part 3 will explore what it takes to be a milaero supplier in the areas of purchasing and quality.
Purchasing Impact
Purchasing is perhaps the most critical business process as far as the milaero industry is concerned. Normally, the processes examined during AS9100 surveillance audits are rotated so that the entire QMS is covered over the course of the three-year certification period—except purchasing. Purchasing will be audited each and every time, and the auditor will focus on traceability through the entire process from quoting to shipping. The auditor will typically request a number of your aerospace customer POs, which will be comprehensively reviewed for product requirements.
This class of customer will normally have its own specification that can contain anywhere from 10 to 40 pages of quality requirements. This auditor review will entail establishing which quality requirements apply to each order, based on the PO callouts, and then verify that each of them has been addressed (added to the traveler, special customer requirement sheets, test plans, etc.). Many of the quality requirements are “flow down” requirements, meaning that you also need to communicate these requirements to any applicable suppliers. The part-number travelers will be reviewed for process accuracy, proper signoff, and raw material traceability along with any inspection and test reports. The auditor will verify that not only has this been done, but they will look for evidence that the suppliers have met the requirements. The process for MIL-PRF-31032 will be the same stringent review of military customer POs.
Another interesting requirement with aerospace products is the requirement regarding nonconforming material. Typical practice with PCB fabricators is to mark each nonconforming scrap PCB with an “X” in permanent ink, which are referred to as X-outs. Aerospace requires that companies take an extra step, no pun intended, by requiring: “Product dispositioned for scrap shall be conspicuously and permanently marked, or positively controlled, until physically rendered unusable.” This can be accomplished in a number of ways as long as the PCB will no longer be functional.
Quality Impact
Aerospace products require some additional documentation, such as AS9102 first article inspection reports. While companies normally perform first article inspections, this version is considerably more detailed and comprehensive. Many organizations task the quality team to participate in the contract review process and be responsible for the review and implementation of customer quality requirements on each order.
MIL-PRF-31032 orders are where the impact on quality is extremely high in more than one area. Microsectioning is absolutely the most taxing to the quality department and often requires additional personnel to handle the workload. Many commercial shops utilize an AQL sample methodology with regard to microsection frequency. Military orders require a 200% microsection frequency (one each in the X- and Y-axis per panel), plus numerous other sections for solderability and thermal shock testing. Further, most shops perform in-process plating sections for process control on military orders as additional copper thickness is often required.
There are also special Defense Logistics Agency (DLA) reporting that needs to be done for military orders. Special inspection forms need to be completed for each order, and coupons from the most complex military products produced each month must be sent out to an approved third-party lab for analysis. Each traveler must be reviewed for accuracy and reconciliation of build quantities (number started, shipped, scrapped. and reworked). All of the above become part of an annual report that must be submitted to the DLA for review and approval.
The organization must also establish a technical review board (TRB) that meets regularly to review the performance of the company. The responsibilities of the TRB are closely scripted and include the approval of all changes, new suppliers, the review of performance metrics, any new technology added onto military products, the number of military orders produced and inspection results, and the results of the third-party lab inspections.
Conclusion
In these two departments, becoming a milaero manufacturer changes the game significantly, adding new processes and a much higher degree of complexity when dealing with milaero orders. Milaero products demand some of the most technically challenging PCBs in the industry and, in many cases, will require the expansion of your staff. Part 4 will explore what it takes in the area of manufacturing.
Editor’s Note: Read Part 1, Part 2 and Part 4.
Anaya Vardya is president and CEO of American Standard Circuits. Vardya is also co-author of The Printed Circuit Designer’s Guide to… Fundamentals of RF/Microwave PCBs and Flex and Rigid-Flex Fundamentals. Visit I-007eBooks.com to download these and other free, educational titles.
Testimonial
"Advertising in PCB007 Magazine has been a great way to showcase our bare board testers to the right audience. The I-Connect007 team makes the process smooth and professional. We’re proud to be featured in such a trusted publication."
Klaus Koziol - atgSuggested Items
OKI Launches Rigid-Flex PCBs with Embedded Copper Coins Featuring Improved Heat Dissipation for Space Equipment Applications
07/29/2025 | BUSINESS WIREOKI Circuit Technology, the OKI Group’s printed circuit board (PCB) business company, has developed rigid-flex PCBs with embedded copper coins that offer improved heat dissipation for use in rockets and satellite-mounted equipment operating in vacuum environments.
Designers Notebook: Basic PCB Planning Criteria—Establishing Design Constraints
07/22/2025 | Vern Solberg -- Column: Designer's NotebookPrinted circuit board development flows more smoothly when all critical issues are predefined and understood from the start. As a basic planning strategy, the designer must first consider the product performance criteria, then determine the specific industry standards or specifications that the product must meet. Planning also includes a review of all significant issues that may affect the product’s manufacture, performance, reliability, overall quality, and safety.
I-Connect007 Editor’s Choice: Five Must-Reads for the Week
07/18/2025 | Nolan Johnson, I-Connect007It may be the middle of the summer, but the news doesn’t quit, and there’s plenty to talk about this week, whether you’re talking technical or on a global scale. When I have to choose six items instead of my regular five, you know it’s good. I start by highlighting my interview with Martyn Gaudion on his latest book, share some concerning tariff news, follow that up with some promising (and not-so-promising) investments, and feature a paper from last January’s inaugural Pan-European Design Conference.
Elephantech Launches World’s Smallest-Class Copper Nanofiller
07/17/2025 | ElephantechJapanese deep-tech startup Elephantech has launched its cutting-edge 15 nm class copper nanofiller – the smallest class available globally. This breakthrough makes Elephantech one of the first companies in the world to provide such advanced material for commercial use.
Copper Price Surge Raises Alarms for Electronics
07/15/2025 | Global Electronics Association Advocacy and Government Relations TeamThe copper market is experiencing major turbulence in the wake of U.S. President Donald Trump’s announcement of a 50% tariff on imported copper effective Aug. 1. Recent news reports, including from the New York Times, sent U.S. copper futures soaring to record highs, climbing nearly 13% in a single day as manufacturers braced for supply shocks and surging costs.