-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueAdditive Manufacturing
In this month’s issue, we explore additive manufacturing technology for the PCB fabricator: where it stands today, the true benefits, and where it seems to be headed.
The Growing Industry
In this issue of PCB007 Magazine, we talk with leading economic experts, advocacy specialists in Washington, D.C., and PCB company leadership to get a well-rounded picture of what’s happening in the industry today. Don’t miss it.
The Sustainability Issue
Sustainability is one of the most widely used terms in business today, especially for electronics and manufacturing but what does it mean to you? We explore the environmental, business, and economic impacts.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - pcb007 Magazine
Happy’s Essential Skills: The Need for Total Quality Control (Six Sigma and Statistical Tools): Part 1
January 13, 2016 | Happy HoldenEstimated reading time: 11 minutes
Implementation Principles and Processes
A preliminary step in TQC implementation is to assess the organization's current reality. Relevant preconditions have to do with the organization's history, its current needs, precipitating events leading to TQC, and the existing employee quality of working life. If the current reality does not include important preconditions, TQC implementation should be delayed until the organization is in a state in which TQC is likely to succeed. Fundamental is that TQC has to be "driven from the top" and includes those principles shown in Figure 3. When Dr. Deming would come to a company to lecture, he insisted the front row consisted of the company president and executives, otherwise, he said, "It is not worth my time!"
If an organization has a track record of effective responsiveness to the environment, and if it has been able to change successfully the way it operates when needed, TQC will be easier to implement. If an organization has been historically reactive and has no skill at improving its operating systems, there will be both employee skepticism and a lack of skilled change agents. If this condition prevails, a comprehensive program of management and leadership development may be instituted. A management audit is a good assessment tool to identify current levels of organizational functioning and areas in need of change. An organization should be healthy before beginning TQC. If it has significant problems such as a very unstable funding base, weak administrative systems, lack of managerial skill, or poor employee morale, TQC would not be appropriate[4].
However, a certain level of stress is probably desirable to initiate TQC. People need to feel a need for a change. Kanter (1983) addresses this phenomenon by describing building blocks, which are present in effective organizational change. These forces include departures from tradition, a crisis or galvanizing event, strategic decisions, individual "prime movers," and action vehicles. Departures from tradition are activities, usually at lower levels of the organization, which occur when entrepreneurs move outside the normal ways of operating to solve a problem. A crisis, if it is not too disabling, can also help create a sense of urgency, which can mobilize people to act. In the case of TQC, this may be a funding cut or threat, or demands from consumers or other stakeholders for improved quality of service. After a crisis, a leader may intervene strategically by articulating a new vision of the future to help the organization deal with it. A plan to implement TQC may be such a strategic decision. Such a leader may then become a prime mover, who takes charge in championing the new idea and showing others how it will help them get where they want to go. Finally, action vehicles are needed and mechanisms or structures to enable the change to occur and become institutionalized[5].
TQC Tools
Data collection and analysis tools are required to document and improve the process. Here are a few (as well as Figure 4), but this is not the complete list (other topics will be addressed in future columns):
• Pareto charts
• Cause & effect diagrams (Fishbone)
• Multi-vary charts (histograms, dot diagrams, correlation/scatter plots)
• Design of experiment
• Process optimization
• Control charts
• Process capability indices (Cp, Cpk)
• PPM
Figure 4: TQC data collection and analysis tools: process flow charts, fishbone 'cause and effect' charts, histograms, Pareto charts, correlation and scatter plots, and control charts.
Page 3 of 4
Suggested Items
Robotas Drives Industry 4.0 with IPC CFX Integration for Mascot Product Line
05/22/2024 | Robotas Technologies Ltd.Robotas Technologies Ltd., pioneers and specialists in the world of THT component placement and clinching systems, has recently announced the adoption of the IPC Connected Factory Exchange (CFX) standard for their Mascot product family.
The Knowledge Base: The Transformative Role of AI and ML
05/22/2024 | Mike Konrad -- Column: The Knowledge BaseArtificial intelligence (AI) and machine learning (ML) are at the vanguard of a technological revolution, redefining the parameters of manufacturing and business processes. Perhaps their most notable impact is within the electronics assembly industry, where they drive unprecedented levels of automation, enhancing efficiency and contributing to significant financial outcomes. This exploration delves into the transformative role of AI and ML, shedding light on the mechanisms of automation enhancement and the resultant financial implications.
TPCA Releases Guide to Help PCB Industry Achieve Low-Carbon Transformation
05/21/2024 | TPCAThe introduction of EU carbon tariffs, international brands committing to carbon neutrality, and the upcoming carbon fee in Taiwan means that carbon reduction is no longer just a slogan. Domestic and international pressures have turned carbon reduction into the golden grail of corporate sustainability.
Murata Obtains ISO 26262 Certification for Functional Safety in Automotive Applications
05/21/2024 | MurataMurata Manufacturing Co., Ltd., obtained the ISO 26262 development process certification for Functional Safety* Automotive ISO 26262 from the German third-party certifier SGS-TÜV Saar GmbH on February 13, 2024.
HBM3e Production Surge Expected to Make Up 35% of Advanced Process Wafer Input by End of 2024
05/20/2024 | TrendForceTrendForce reports that the three largest DRAM suppliers are increasing wafer input for advanced processes. Following a rise in memory contract prices, companies have boosted their capital investments, with capacity expansion focusing on the second half of this year.