NASA Pursues Astronaut Lunar Landers for Future Artemis Moon Missions
September 21, 2022 | NASAEstimated reading time: 2 minutes
NASA is seeking proposals for sustainable lunar lander development and demonstration as the agency works toward a regular cadence of Moon landings. Through Artemis missions, NASA is preparing to return humans to the Moon, including the first woman and first person of color, for long-term scientific discovery and exploration.
Under the solicitation, Human Landing System Sustaining Lunar Development, NASA has provided requirements for companies interested in developing and demonstrating astronaut Moon landers. These efforts will pave the way for multiple companies to provide recurring Moon landing services beyond the Artemis III mission, which is planned for no earlier than 2025.
Companies selected under this contract will be required to perform one uncrewed and one crewed lunar landing demonstration. NASA will certify any lander system to meet its requirements prior to the crewed demonstration mission(s).
“Work done under this solicitation, in addition to current lander development and studies taking place, will help build the foundation for long-term deep space exploration,” said Lisa Watson-Morgan, program manager for the Human Landing System Program at NASA’s Marshall Space Flight Center in Huntsville, Alabama. “Partnering with American companies to do that work now allows us to leverage NASA’s knowledge and expertise to encourage technological innovations for a sustained presence at the Moon.”
The final call for proposals comes after NASA incorporated industry feedback on the draft solicitation, released March 31, encouraging companies to send comments to help shape a key component of the agency’s human exploration Artemis architecture. NASA also hosted a virtual industry day in April to present an overview of the solicitation and to provide companies an opportunity to ask clarifying questions and provide comments.
NASA’s existing contract with SpaceX includes both an uncrewed and a crewed lunar landing demonstration that is part of the Artemis III mission, marking humanity’s first return to the Moon in more than 50 years. The agency plans to exercise an option under this contract, known as Option B, asking the company to evolve its current Artemis III Starship Human Landing System design to meet an extended set of requirements for sustaining missions at the Moon and conduct another crewed demonstration landing.
These concurrent sustaining lander development efforts will meet NASA’s needs for recurring, long-term access to the lunar surface, such as the ability to dock with Gateway for crew transfer, accommodate an increased crew size, and deliver more mass to the surface.
NASA’s Artemis efforts include sending a suite of new science instruments and technology demonstrations to study the Moon, landing the first woman and first person of color on the Moon, and more. The agency will leverage its Artemis experiences and technologies to prepare for the next giant leap – sending astronauts to Mars.
Suggested Items
Lockheed Martin Australia, The Department Of Defence Sign Strategic Partnership Head Contract
04/26/2024 | Lockheed MartinLockheed Martin Australia signed a landmark AUD$500 million contract with the Department of Defence to build Australia’s future Joint Air Battle Management System under project - AIR6500 Phase 1 (AIR6500-1).
Cadence, TSMC Collaborate on Wide-Ranging Innovations to Transform System and Semiconductor Design
04/25/2024 | Cadence Design SystemsCadence Design Systems, Inc. and TSMC have extended their longstanding collaboration by announcing a broad range of innovative technology advancements to accelerate design, including developments ranging from 3D-IC and advanced process nodes to design IP and photonics.
Siemens’ Breakthrough Veloce CS Transforms Emulation and Prototyping with Three Novel Products
04/24/2024 | Siemens Digital Industries SoftwareSiemens Digital Industries Software launched the Veloce™ CS hardware-assisted verification and validation system. In a first for the EDA (Electronic Design Automation) industry, Veloce CS incorporates hardware emulation, enterprise prototyping and software prototyping and is built on two highly advanced integrated circuits (ICs) – Siemens’ new, purpose-built Crystal accelerator chip for emulation and the AMD Versal™ Premium VP1902 FPGA adaptive SoC (System-on-a-chip) for enterprise and software prototyping.
Taiyo Circuit Automation Installs New DP3500 into Fuba Printed Circuits, Tunisia
04/25/2024 | Taiyo Circuit AutomationTaiyo Circuit Automation is proud to be partnered with Fuba Printed Circuits, Tunisia part of the OneTech Group of companies, a leading printed circuit board manufacturer based out of Bizerte, Tunisia, on their first installation of Taiyo Circuit Automation DP3500 coater.
Vicor Power Orders Hentec Industries/RPS Automation Pulsar Solderability Testing System
04/24/2024 | Hentec Industries/RPS AutomationHentec Industries/RPS Automation, a leading manufacturer of selective soldering, lead tinning and solderability test equipment, is pleased to announce that Vicor Power has finalized the purchase of a Pulsar solderability testing system.