U.S. Air Force Delays E-3 AWACS Upgrade Program
February 26, 2019 | U.S. Air ForceEstimated reading time: 1 minute
The U.S. Air Force has delayed the upgrade program of E-3G Airborne Warning and Control System aircraft, according to a report by Inside Defense.
The report states that the U.S. Air Force has delayed E-3 AWACS Block 40/45 upgrade program stemming from shortfalls identified during testing and delays in delivering new hardware by prime contractor Boeing.
“In November, the service formally advised lawmakers of a revised acquisition strategy for the AWACS Block 40/45 program to reflect pushing the planned date for full operational capability required assets available from November 2023 to May 2024,” reports Inside Defense.
The E-3 Block 40/45, designated E-3G, modifications include incremental updates to the business-grade commercial mission computing systems in the aircraft, ground support systems, and application software to address diminishing manufacturing resources, correction to deficiencies identified through testing and operational use, and to add enhancements.
According to GlobalSecurity.org, the Block 40/45 modification system upgrade replaces the 1970’s vintage mission computer system with an open system, LAN-based architecture.
The E-3G aircraft carries an upgraded computer platform for their weapons and surveillance scopes, known as the 4045. It advances their old operating system by about 30 years.
The E-3G’s mission computing system provides the capability to automatically fuse all on- and off-board sensor inputs to provide a single track for each air, sea, and land entity using a multi-sensor integration algorithm.
Also, the E-3G upgrade will include a deployable ground support system to enable deployed crews to conduct mission planning and post mission processing with a central data processing center for data storage and retrieval.
Initial System Development and Design began in 2003 and cost $2.7 billion.
Suggested Items
Real Time with… IPC APEX EXPO 2024: Sigma Engineering's Recycling and Regeneration Systems for PCB Etching
05/02/2024 | Real Time with...IPC APEX EXPOEvan Howard of Schmoll America interviews Kristoffer Bjorklund, Sigma Engineering's supply chain manager. We learn about Sigma's recycling and regeneration systems for PCB industry etching and the benefits and challenges of implementing these systems in existing factories.
Boeing T-7A Red Hawk Triples Progress
05/01/2024 | BoeingThe Boeing T-7A Red Hawk achieved three recent milestones, propelling the advanced pilot trainer for the U.S. Air Force forward.
Merlin Flex invests in New Schmoll Direct Imaging System
04/30/2024 | Merlin Flex LtdMerlin Flex has fully installed and commissioned its 2nd Schmoll MDI Direct Imaging system. This new machine includes a twin bed, 4 head system which enhances Merlin Flex’s direct imaging capability for its 1.4M long flexible circuits.
Latest Test and Inspection Solutions from GOEPEL electronic at SMTconnect 2024
04/29/2024 | GOEPEL electronicGOEPEL electronic will be demonstrating automated test and inspection equipment at SMTconnect, taking place in Nuremberg from June 11 to 13, 2024.
TSMC Celebrates 30th North America Technology Symposium
04/29/2024 | TSMCTSMC unveiled its newest semiconductor process, advanced packaging, and 3D IC technologies for powering the next generation of AI innovations with silicon leadership at the Company’s 2024 North America Technology Symposium.