Sierra Space’s Dream Chaser Spaceplane Successfully Passes NASA Testing Milestone in Preparation for Launch
January 31, 2025 | BUSINESS WIREEstimated reading time: 2 minutes

Sierra Space, a leading commercial space company and defense tech prime that is Building a Platform in Space to Benefit Life on Earth®, announced today it has successfully completed and passed its Joint Test 10B milestone in collaboration with NASA on the Dream Chaser® spaceplane.
The test demonstrated several capabilities of Dream Chaser, including its ability to power-on, air-cool, and exchange data with multiple powered payloads inside its pressurized cabin. This is an important progression toward Dream Chaser’s planned mission to resupply the International Space Station (ISS).
“Tests like these are critical demonstrations of the capabilities of the Dream Chaser spaceplane and confirms our ability to handle specialized payloads such as vital scientific research that will be integral to our mission to the ISS,” said Pablo Gonzalez, Vice President of Crew & Cargo Transportation Systems at Sierra Space. "This milestone highlights Dream Chaser’s flexibility, reliability, and capability to meet the diverse needs of our payload customers – including NASA and commercial partners – and it brings us another step closer to launch."
The successful completion of this milestone confirms that Dream Chaser will accommodate various payloads. The Joint Test 10B demonstrated that Sierra Space can provide power within a specific voltage range and maintain the necessary environmental requirements for payloads. It also ensured all vehicle and payload data are seen in both Sierra Space’s mission control room in Louisville, Colorado, and in the payload support control rooms at NASA’s Marshall Spaceflight Center (MSFC) in Huntsville, Alabama.
During the Joint Test 10B, the test team successfully evaluated three key payloads, all of which are candidates for flight on DCC-1, the first official mission of Dream Chaser.
These payloads included:
Polar: A cryogenic preservation system developed by the University of Alabama at Birmingham and managed by NASA's Cold Stowage Lab and the University of Alabama at Birmingham. Polar is designed to preserve scientific samples aboard the ISS and other visiting spacecraft at temperatures ranging from -95°C to +10°C.
Powered Ascent Utility Locker (PAUL): A facility developed by Space Tango that holds two CubeLab experiments requiring power during ascent. These experiments often focus on biological research, such as cell and tissue cultures.
NASA’s Single Stowage Locker: A standard stowage system designed to carry experiments and other payloads in the Dream Chaser spaceplane.
"Space Tango's recent integration testing with the Sierra Space Dream Chaser went well and all teams were very happy with the results," said Anne Currin, Director of Mission Management at Space Tango. "We appreciate the steps the Sierra Space team has taken to get both the vehicle and Space Tango ready for a successful flight. It's been exciting to see this come together as we count down to a maiden flight that is scheduled to increase access for payload delivery to the International Space Station."
The tests took place at NASA’s Kennedy Space Center in Florida last month, with oversight from Sierra Space and NASA.
Suggested Items
NASA Aims to Fly First Quantum Sensor for Gravity Measurements
04/18/2025 | NASAA lumpy, colorful 3D model of the Earth against a black background, illustrating variations in gravity. North and South America are visible. Red areas show higher gravity, blue areas show lower gravity.
L3Harris Expands Indiana Facility to Support America’s Golden Dome
04/18/2025 | L3Harris TechnologiesL3Harris Technologies has completed a $125 million expansion at its space manufacturing facility in Fort Wayne to support the Department of Defense’s urgent need for on-orbit technology to defend the homeland by building a “Golden Dome” around the United States.
AdvancedPCB Appoints Gary Stoffer as Chief Commercial Officer
04/18/2025 | PRNewswireAdvancedPCB is proud to announce the appointment of Gary Stoffer as its new Chief Commercial Officer (CCO). In this role, Stoffer will lead all sales, marketing, and commercial strategy initiatives as the company continues its mission to deliver cutting-edge PCB solutions to industries worldwide.
Safran Inaugurates Advanced Manufacturing and Engineering Hub in Colorado to Propel Innovation in Satellite Propulsion
04/17/2025 | PRNewswireJoe Bogosian, CEO of Safran Defense & Space, Inc. (Safran DSI), and Pier Roviera, President of Space Solutions at Safran DSI, inaugurated the company's new manufacturing facility in Parker, Colorado, on April 11.
Real Time with... IPC APEX EXPO 2025: GreenSource's Growth and Future Developments
04/15/2025 | Real Time with...IPC APEX EXPOThings are looking bright for GreenSource. Michael Gleason shares an update on GreenSource's recent growth and upcoming changes. A recipient of a Defense Production Act Investment Program award, GreenSource is planning for new substrate capabilities. Current investments continue to enhance equipment and sustainability initiatives such as water quality. And their unique collaboration with the University of New Hampshire continues to aid their workforce development, despite recruitment challenges.