Raytheon's Development and Testing on Track for DDG 51 Flight III
January 18, 2016 | Raytheon CompanyEstimated reading time: 2 minutes
Raytheon Company announced its AN/SPY-6(V) Air and Missile Defense Radar (AMDR)team has completed the first full radar array, fully populated with component Line Replaceable Units (LRUs), including more than 5,000 Transmit/Receive elements, in 140 days. In less than two years, the radar has been designed, built and transitioned to test; the Engineering and Manufacturing Development (EMD) phase of the program is now more than 66 percent complete. The program remains on track to begin production and deliver on time to the FY16 authorized DDG 51 Flight III destroyer.
"As each milestone is completed, development of the SPY-6 radar progresses on schedule," said U.S. Navy Captain Seiko Okano, major program manager, Above Water Sensors (IWS 2.0). "With this array, now built and operational in the Near Field Range, we're proceeding to plan and commencing full-scale integration and test of AMDR's unprecedented capability."
Subcontractor Major Tool and Machine delivered the array structure to Raytheon's Near Field Range on July 29; and Raytheon installed all passive RF components before September 1. The first Radar Modular Assembly (RMA) was powered up in October and testing began. All RMA chassis were installed by October 16, complete with cooling, power, fiber-optic control and data interfaces. In 79 days the array infrastructure was complete – verification of the simplicity of the AMDR array design. Population of the array with Transmit Receive Integrated Multi-channel Modules and Distributed Receiver/Exciter LRUs completed on December 16.
These recent achievements are among the many successes and milestones realized to date, including:
- Nine of nine major program milestones completed on schedule, including hardware and software Critical Design Reviews and the Development Test Event 2 (DT-2) Readiness Review
- Transition to DT-2 - currently in process, culminating in 2016 with verification of hardware level specifications to requirements and shipment of the array to the Pacific Missile Range Facility in Hawaii for system validation testing (DT-3)
- Completed Build 2 software early, with all planned functionality (30 capabilities), formally qualified in July 2016; Build 3 is more than 75% percent complete
- 95% of EMD hardware production is complete; awaiting final power systems delivery in early 2016
Page 1 of 2
Testimonial
"We’re proud to call I-Connect007 a trusted partner. Their innovative approach and industry insight made our podcast collaboration a success by connecting us with the right audience and delivering real results."
Julia McCaffrey - NCAB GroupSuggested Items
Smart Eye Receives Milestone AIS Order from Fleet Safety Company Optix
09/11/2025 | Smart EyeSmart Eye, a global leader in Human Insight AI and Driver Monitoring Systems (DMS), announced a milestone order for its AIS system from Optix, a global provider of fleet management solutions. Initially, in 2025, 4,000 commercial vehicles will be equipped with Smart Eye’s technology, marking the first wave of deployments globally.
Datest Unveils Viscom iX7059 XL 3D CT AXI System
08/25/2025 | DatestDatest, a trusted leader in advanced testing, engineering, inspection, and failure analysis services, and the go-to destination for when your boards misbehave and your AXI line goes on vacation, is thrilled to announce the arrival of its newest diagnostic weapon: the Viscom iX7059 XL 3D CT AXI Inspection System.
Gardien Services Installs Customized G93 Flying Probe Tester – Largest Test Area in North America/Europe
09/07/2025 | Gardien GroupGardien Group is proud to announce the successful installation of a customized G93 Flying Probe Test Machine at a major manufacturer in North America. This cutting-edge system features the largest test area of any flying probe tester in North America and Europe, setting a new benchmark for PCB testing capabilities.
Meet with The Test Connection Inc. (TTCI) at SMTA Guadalajara 2025
08/18/2025 | The Test Connection Inc.The Test Connection Inc. (TTCI), a trusted provider of electronic test and manufacturing solutions for more than 45 years, is pleased to announce its participation at the upcoming SMTA Guadalajara Expo & Tech Forum, taking place September 17–18, 2025, at Expo Guadalajara, Salón Jalisco Hall D & E.
MoU to Revolutionize Photonic Integrated Circuit (PIC) Device Testing with AI-Driven Solutions
08/07/2025 | PRNewswireLightium AG, MPI Corporation, and Axiomatic_AI Inc. have entered into a Memorandum of Understanding (MoU) to jointly develop the world's first Intelligent, Autonomous, and Integrated Test Solution (IAITS) for photonic devices.