NASA Makes Fitbit Ready for Work Solution Available
February 11, 2021 | Business WireEstimated reading time: 2 minutes
Fitbit announced that NASA is offering a Fitbit device and its Ready for Work solution as part of a pilot program to help employees make more informed decisions about going to work onsite during the COVID-19 pandemic.
As part of the pilot program, 1,000 NASA employees performing mission-critical work at six locations across the United States will receive Fitbit Charge 4TM devices and access to Fitbit’s Ready for Work Daily Check-In experience. This includes 150 astronauts and NASA employees critical to future space missions who will use the Fitbit solution as part of the NASA Health Stabilization Program, which is aimed at mitigating the risk of occurrence of infectious disease among astronaut flight crews in the immediate preflight period. The in-app Daily Check-In feature allows users to log their symptoms and temperature, track key health metrics, and receive summarized COVID-19 guidance based on CDC guidelines. The goal of the Fitbit pilot program is to help NASA and its employees prevent the spread of COVID-19 while also supporting the overall health and well-being of NASA employees. Employees will also have access to one year of Fitbit PremiumTM and one-on-one Fitbit health coaching services.
There is evidence that resting heart rate data and other key health indicators from wearables have the potential to identify flu-like illness such as COVID-19 before symptoms emerge. This is important because people can transmit the virus before they realize they have symptoms or when they have no symptoms at all. The Fitbit Ready for Work Daily Check-In feature allows users to view key health metrics (resting heart rate, heart rate variability and breathing rate) tracked by their Fitbit device alongside self-reported symptoms, temperature logging and COVID-19 exposure. Based on a user’s daily check-in, the solution will provide NASA employees with daily guidance to help them decide whether to go to work or stay home.
“The pandemic has underscored the critical role that Fitbit can play in providing much-needed support to help people sleep better, eat better, move more and take control of their health and wellness, as well as the potential to identify illness from specific health metrics, which is especially important now during the COVID-19 crisis,” said Amy McDonough, Managing Director and General Manager, Fitbit Health Solutions at Google. “We are proud to work with NASA to support its employees and give them access to Fitbit products and services to help them better understand and manage their health and well-being during the pandemic.”
NASA will evaluate the pilot program and consider expanding to a larger employee population based on the impact the program has on helping to prevent the spread of COVID-19 and in supporting the health and wellness of NASA employees.
Testimonial
"Our marketing partnership with I-Connect007 is already delivering. Just a day after our press release went live, we received a direct inquiry about our updated products!"
Rachael Temple - AlltematedSuggested Items
Alta Resource Technologies Advances to Final Phase of DARPA’s EMBER Program
08/07/2025 | BUSINESS WIREAlta Resource Technologies announced its selection as a primary collaborator in Phase 3 of the Defense Advanced Research Projects Agency (DARPA)’s Environmental Microbes as a BioEngineering Resource (EMBER) program.
Creating Connections in Mexico
07/30/2025 | Michelle Te, Community MagazineA concerted effort by the Global Electronics Association—Mexico team over the past year has created inroads for the Global Electronics Association (formerly IPC) with leading electronics companies, government offices, and academic institutions in Mexico. “Our goal is to bring more awareness to what the Global Electronics Association is and what it offers,” says Lorena Villanueva, senior director. “We also aim to increase our membership. Of 3,200 members of the Global Electronics Association, only 180 are in Mexico.”
Bell to Build X-Plane for Phase 2 of DARPA Speed and Runway Independent Technologies (SPRINT) X-Plane Program
07/09/2025 | Bell Textron Inc.Bell Textron Inc., a Textron Inc. company, has been down-selected for Phase 2 of Defense Advanced Research Projects Agency (DARPA) Speed and Runway Independent Technologies (SPRINT) X-Plane program with the objective to complete design, construction, ground testing and certification of an X-plane demonstrator.
The Knowledge Base: Building the Workforce of Tomorrow With EMAC
06/24/2025 | Mike Konrad -- Column: The Knowledge BaseAs the electronics manufacturing industry races to meet rising global demand and technological complexity, the need for a highly skilled, future-ready workforce has never been greater. At the forefront of addressing this challenge is The Electronics Manufacturing & Assembly Collaborative (EMAC)—a national initiative dedicated to strengthening the talent pipeline through strategic collaboration with SMTA, education, and government stakeholders.
MVTec, Siemens Expand Technological Cooperation
06/12/2025 | MVTecMVTec Software GmbH and Siemens are expanding their technological cooperation in the field of industrial automation. To reinforce their increasingly close collaboration, Siemens joined the MVTec Technology Partner Program in May 2025.