-
-
News
News Highlights
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueVoices of the Industry
We take the pulse of the PCB industry by sharing insights from leading fabricators and suppliers in this month's issue. We've gathered their thoughts on the new U.S. administration, spending, the war in Ukraine, and their most pressing needs. It’s an eye-opening and enlightening look behind the curtain.
The Essential Guide to Surface Finishes
We go back to basics this month with a recount of a little history, and look forward to addressing the many challenges that high density, high frequency, adhesion, SI, and corrosion concerns for harsh environments bring to the fore. We compare and contrast surface finishes by type and application, take a hard look at the many iterations of gold plating, and address palladium as a surface finish.
It's Show Time!
In this month’s issue of PCB007 Magazine we reimagine the possibilities featuring stories all about IPC APEX EXPO 2025—covering what to look forward to, and what you don’t want to miss.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - pcb007 Magazine
Alex Stepinski on Zero-Waste Facilities
June 3, 2021 | Barry Matties, I-Connect007Estimated reading time: 1 minute

Since he began his work at Whelen Engineering a few years ago, Alex Stepinski has redefined the way we think about manufacturing printed circuit boards.
Whelen was a garage startup by George W. Whelen in 1952. The company designs and manufactures warning lights, white illumination lighting, sirens, controllers, and high-powered warning systems for automotive, aviation and mass notification industries worldwide. When Alex joined, his job was to bring printed circuit board fabrication in-house. At the time, Whelen was purchasing its boards from abroad. Alex saw this as a chance to completely reimagine the way boards were produced; his goal became to build an automated factory from the ground up. This was not an easy challenge by any means; in fact the challenge became more complicated when he learned (after he accepted the job) that, due to local regulations, the factory had to be a zero-wastewater facility.
After spending countless hours on airplanes to visit factories and suppliers all around the world, Alex began building the new “zero-waste” captive facility. After only a few years of operation, the factory was a clear success—so much so that the decision was made to upgrade the facility to produce leading-edge boards. This was the birth of GreenSource Engineering. It was decided that the new iteration would be more than a captive facility, it would also be a merchant shop.
Alex and team then set out to build a completely new facility and, within in a few years, they transformed the first facility from primarily producing single- and double-sided boards into a facility producing some of the highest tech boards in the world. This was not a simple task. In fact, along the way one of their key equipment suppliers faced challenges that put their entire business at risk. So, mid-stream, GreenSource acquired the company and took on the challenge of both managing the acquisition of a troubled company and building the new facility.
To read this entire interview, which appeared in the May 2021 issue of PCB007 Magazine, click here.