TTM’s Grand Opening in Malaysia
November 7, 2024 | Marcy LaRont, I-Connect007Estimated reading time: 2 minutes
When I last spoke with Tom Edman, president and CEO of TTM Technologies (TTM), he provided an update about the company’s new high-tech printed circuit board facility under construction in Syracuse, New York, and how the grand opening of a facility in Malaysia is informing TTM’s overall expansion efforts: a cutting-edge facility spread across 27 acres and providing roughly 1,000 jobs. Now, Tom provides more details about the new automated facility, its regional and global impact, and the importance of having both government and industry support.
Marcy LaRont: Tom, tell me about TTM Malaysia.
Tom Edman: TTM Malaysia is a slightly more than 800,000-square-foot building with a single-level production floor, which allows us to incorporate a high degree of automation. For example, we're combining process steps to accommodate automation using inline equipment when and where we can and between process steps as well. We're also using automated guided vehicles (AGVs) to transport panels. Almost everything inside the facility is automated, including the drills and the drill bit sharpening. That might sound mundane, but it is a very important part of the process in terms of keeping the drill points properly calibrated. We have a large facility just above the production floor where we feed chemistry onto the first floor, and we have a sub-basement for taking the waste which delivers the spent water and chemistry to the adjacent waste treatment center for recycling or treatment.
LaRont: Automation is certainly key, so tell me more about the AGVs.
Edman: They move the panels around from the warehouse to the loaders, between the pieces of equipment for each process step, and finally back to the warehouse. You can see these little robots all over the facility.
We incorporated manufacturing execution system (MES) software to dictate their movements. This software runs the shop floor processes and ties into our Oracle® financial system. As we proceed through the ramp-up, this last step toward automation allows us to minimize scrap because we have eliminated manual handling errors.
We have a very long hallway that runs lengthwise throughout the middle of the facility for evacuation purposes. We put in doors with glass panels so visitors can get a good feeling for the entire process. As you move your way through the different process steps, you see drill, plating, test and inspection, and finally return to where you started.
To read this entire conversation, which appeared in the October 2024 issue of PCB007 Magazine, click here.
Suggested Items
Bell Announces New Manufacturing Facility for the U.S. Army’s Future Long Range Assault Aircraft
12/18/2024 | BellBell Textron Inc., a Textron Inc. company, announced a facility site selection today to support production of the U.S. Army’s Future Long Range Assault Aircraft (FLRAA). The new 447,000 sq. ft. factory, located in the Denton County region of Fort Worth, Texas, will be dedicated to FLRAA component manufacturing. Bell plans to begin facility modification and equipment installation and achieve facility readiness for Low-Rate Initial Production (LRIP) by 2028.
Biden-Harris Administration Announces CHIPS Incentives Awards with GlobalWafers to Support Domestic Production of Silicon Wafers
12/18/2024 | U.S. Department of CommerceThe Biden-Harris Administration announced that the U.S. Department of Commerce issued direct funding awards to GlobalWafers America, LLC (GWA) and MEMC LLC (MEMC), subsidiaries of GlobalWafers Co., Ltd. (GlobalWafers), of up to $406 million under the CHIPS Incentives Program’s Funding Opportunity for Commercial Fabrication Facilities.
Ventec Confirms Thailand as Location for New State-of-the-Art PCB Material Manufacturing Facility
12/17/2024 | Ventec International GroupVentec International Group Co., Ltd. announces that Thailand has been selected as the location for its new state-of-the-art PCB materials manufacturing facility.
RTX's Pratt & Whitney and WZL2 Sign Letter of Intent for F100 Sustainment Work in Poland
11/27/2024 | RTXPratt & Whitney, an RTX business, signed a letter of intent with Wojskowe Zaklady Lotnicze Nr. 2 S.A., also known as WZL2, to explore expanded maintenance repair and overhaul capabilities for increased Polish Air Force needs.
CIL Installs Third Volume Auto SMT Line with In-Line 3D AOI at BP2 Facility
11/25/2024 | CILIn early November 2024, CIL completed the installation of its third volume SMT PCBA assembly line at its BP2 Semiconductor Packaging facility