-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueInventing the Future with SEL
Two years after launching its state-of-the-art PCB facility, SEL shares lessons in vision, execution, and innovation, plus insights from industry icons and technology leaders shaping the future of PCB fabrication.
Sales: From Pitch to PO
From the first cold call to finally receiving that first purchase order, the July PCB007 Magazine breaks down some critical parts of the sales stack. To up your sales game, read on!
The Hole Truth: Via Integrity in an HDI World
From the drilled hole to registration across multiple sequential lamination cycles, to the quality of your copper plating, via reliability in an HDI world is becoming an ever-greater challenge. This month we look at “The Hole Truth,” from creating the “perfect” via to how you can assure via quality and reliability, the first time, every time.
- Articles
- Columns
- Links
- Media kit
||| MENU - pcb007 Magazine
ispace Completes Success 8 of Mission 2 Milestones
June 2, 2025 | ispaceEstimated reading time: 1 minute

ispace, inc. (ispace) (TOKYO: 9348), a global lunar exploration company, announced that the RESILIENCE lunar lander has successfully completed all orbital maneuvers while in lunar orbit and is now being prepared for its landing attempt on June 6, 2025.
This marks the completion of Success 8 milestone of Mission 2 “SMBC x HAKUTO-R Venture Moon.”
RESILIENCE conducted a lunar orbital control maneuver at 5:27 p.m. JST (08:27 UTC) on May 28, 2025, to move into a circular orbit around the Moon in accordance with the mission operation plan. The operation required an engine burn of approximately 10 minutes, the longest to date on Mission 2. Since then, the lander has been in a 100 km orbit around the Moon and completes a full orbit every 2 hours. After RESILIENCE completed the orbital control maneuver, ispace engineers in the Mission Control Center in Nihonbashi, Tokyo, Japan worked to confirm the precise orbit in advance of the landing sequence.
The RESILIENCE lander, which reached lunar orbit on May 7, 2025 (JST), orbited the moon in an elliptical orbit with a perilune (closest point to the moon) altitude of approximately 70 km and an apolune (farthest point from the moon) altitude of approximately 5,800 km. After performing three orbital control maneuvers, it reached a circular orbit around the moon at an altitude of approximately 100 km.
A lunar landing is scheduled for no earlier than June 5, 2025 (UTC) (June 6, 2025, JST). The RESILIENCE lander is scheduled to begin descent from its current circular orbit. During the descent phase, the lander will automatically fire its main propulsion system to gradually decelerate and adjust its attitude, with the goal of achieving a soft landing on the lunar surface.
“Having completed eight of 10 mission milestones, RESILIENCE is now ready to attempt a historic landing on the Moon, carrying not only the payloads of our customers but also the hopes of our employees, their families, our partners and all of our supporters,” said Takeshi Hakamada, Founder & CEO of ispace. “We have leveraged the operational experience gained in Mission 1 and during this current voyage to the Moon, and we are confident in our preparations for success of the lunar landing.”
Testimonial
"In a year when every marketing dollar mattered, I chose to keep I-Connect007 in our 2025 plan. Their commitment to high-quality, insightful content aligns with Koh Young’s values and helps readers navigate a changing industry. "
Brent Fischthal - Koh YoungSuggested Items
Eltek Ltd. Reports Strong Second-Quarter 2025 Results
08/14/2025 | PR NewswireEltek Ltd., a global manufacturer and supplier of technologically advanced solutions in the field of printed circuit boards (PCBs), today announced its financial results for the quarter ended June 30, 2025.
20 Years of Center Nanoelectronic Technologies (CNT) – Backbone of German Semiconductor Research Celebrates Anniversary
08/14/2025 | Fraunhofer IPMSThe Center Nanoelectronic Technologies (CNT) of the Fraunhofer Institute for Photonic Microsystems (IPMS) is celebrating its 20th anniversary this year. Since its founding in 2005, it has developed into a pillar of applied semiconductor research in Germany and Europe. With its unique research cleanroom and equipment adhering to the 300-mm wafer industry standard, CNT is unparalleled in Germany and serves as a central innovation driver for the microelectronics industry.
Federal Electronics Elevates Hermosillo Facility with Advanced Mycronic 3D AOI System
08/12/2025 | Federal ElectronicsFederal Electronics, a leader in providing advanced electronic manufacturing services, has enhanced its new production line at its Hermosillo, Mexico facility with the addition of the Mycronic MYPro i50 Automated Optical Inspection (AOI) system.
Flex Delivers Advanced Power Management for Next-Generation NVIDIA AI Infrastructure
08/07/2025 | FlexFlex announced a new power shelf system to fast-track 800 VDC power architectures and support the growing demands of AI infrastructure and AI factories.
Inside the AI Hardware Boom: Servers, Substrates and Advanced Packaging
08/07/2025 | Edy Yu, Printed Circuit Information, China, and Marcy LaRont, I-Connect007AI is rewriting the hardware playbook, marrying complex software and algorithms to run and improve machine and equipment operations. Sorting through, managing, and utilizing massive amounts of data takes tremendous data storage and processing power. Enter the new generation of supercomputers and data servers. The data servers being built today are not your momma’s server, as they say.