- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueInner Layer Precision & Yields
In this issue, we examine the critical nature of building precisions into your inner layers and assessing their pass/fail status as early as possible. Whether it’s using automation to cut down on handling issues, identifying defects earlier, or replacing an old line...
Engineering Economics
The real cost to manufacture a PCB encompasses everything that goes into making the product: the materials and other value-added supplies, machine and personnel costs, and most importantly, your quality. A hard look at real costs seems wholly appropriate.
Alternate Metallization Processes
Traditional electroless copper and electroless copper immersion gold have been primary PCB plating methods for decades. But alternative plating metals and processes have been introduced over the past few years as miniaturization and advanced packaging continue to develop.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - pcb007 Magazine
Estimated reading time: 1 minute
Cycle Time Reduction with WORK, Part I
Summary
Lean, theory of constraints (ToC), quick response manufacturing (QRM), cross training, and SPC are powerful, tried and true methodologies for process improvement. However, these tools are rooted in high-volume manufacturing environments and don't always play nice in a high-mix, low-volume (HMLV) operation. The new WORK manufacturing strategy was specifically developed to overcome these shortcomings while capitalizing on their strengths.
Limitations of the Current Toolset
Lean
Lean is a collection of tools and methods designed to eliminate waste, reduce delays, improve performance and reduce costs. Lean focuses on eliminating non-value-added activities, as opposed to more traditional improvement efforts, which focus on reducing the time in value-added steps. The problem with lean is that many of the tools work best in a high-volume process that has very little variation in product mix.
ToC
ToC is a methodology that focuses on removing bottlenecks from a process through a series of five steps:
1. Identify the constraint
2. Exploit (improve) the constraint
3. Subordinate (align all activities)
4. Elevate (additional actions)
5. Repeat
The problem with ToC is that, by definition, eliminating one bottleneck creates another, and in a high-mix process the bottlenecks can change with the mix.
Quick Response Manufacturing
Quick response manufacturing (QRM), a cell-based strategy closely related to focus factories that was developed specifically for HMLV, has been gaining popularity over the past few years. The problem with QRM is that it works best when equipment sets from a number of sequential departments can be physically organized into small cells. This becomes problematic in operations that have processes requiring capital intensive environments like plating, clean room imaging, etc., where setting up a single machine in a cell is prohibitive.
Editor's Note: This article originally appeared in the October 2015 issue of SMT Magazine.
More Columns from The Right Approach
The Right Approach: ‘Twas the Night Before Christmas (Harley-style)The Right Approach: I Hear the Train A Comin'
The Right Approach: Culture Change is Key to a QMS
The Right Approach: Leadership 101—Be a Heretic, Not a Sheep
The Right Approach: Leadership 101—The Law of Legacy
The Right Approach: Leadership 101: The Law of Explosive Growth
The Right Approach: Leadership 101—The Law of Timing
The Right Approach: The Law of Sacrifice