NASA Reaches New Heights in 2015
December 23, 2015 | NASAEstimated reading time: 17 minutes
NASA received in November a full-size test version of the Orion European Service Module provided by ESA (European Space Agency), which is being prepared for testing early next year at the Plum Brook Station test facilities in Sandusky, Ohio.
Progress also continues on SLS -- the world’s most powerful rocket. The booster and engines that will propel SLS and the Orion spacecraft to space passed significant tests this year. The upgraded rocket booster passed a major ground test in March after firing for two minutes, the amount of time it will fire when it lifts SLS off the launch pad. Engineers will conduct a second and final qualification booster firing test in 2016. In August, NASA completed the first series of tests for the upgraded developmental RS-25 engines on the A-1 test stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi. Preparations will continue in 2016 as the flight engines that will power SLS on missions into deep space will be tested for flight.
For the first time in almost 40 years, a NASA human-rated rocket completed all steps needed to clear a critical design review while the hardware is being built: a structural test article of the rocket’s propulsion system was finished and numerous other flight and qualification hardware were completed and are ready for welding.
Work also began on infrastructure projects supporting SLS and Orion. Construction began in May on a 215-foot-tall structural test stand for SLS at Marshall. In August, NASA completed modifications to the Pegasus barge, previously used to move space shuttle hardware. For its new mission, transporting the core stage of the SLS, a 165-foot center section was added to the barge, bringing its total length from 260 feet to 310 feet.
In addition, Kennedy continued its transformation into a 21st century, multi-user spaceport for both government and commercial customers. Modifications continue on the ground structures that will launch the next generation of rockets and spacecraft. Several new work platforms that will be used to access, test and process SLS and Orion arrived on site, and the giant steel platforms are being installed in the center’s Vehicle Assembly Building.
Testing began at Kennedy on the umbilical system that provides power and ground communications between the mobile launcher tower, rocket and Orion spacecraft. Upgrades and designs in progress were reviewed to ensure they will be ready to support all system and processing requirements for the first launch of SLS and Orion.
Testimonial
"In a year when every marketing dollar mattered, I chose to keep I-Connect007 in our 2025 plan. Their commitment to high-quality, insightful content aligns with Koh Young’s values and helps readers navigate a changing industry. "
Brent Fischthal - Koh YoungSuggested Items
Nortech Systems Incorporated Earns AS9100 Certification for Monterrey, Mexico Facility
11/04/2025 | BUSINESS WIRENortech Systems, Incorporated, a leading provider of design and manufacturing solutions for complex electromedical devices and electromechanical systems, announced that its Monterrey, Mexico, facility has achieved AS9100:D certification.
PsiQuantum, Lockheed Martin Form Strategic Collaboration to Accelerate Quantum Computing for Aerospace and Defense
11/04/2025 | BUSINESS WIREPsiQuantum and Lockheed Martin have signed a memorandum of understanding (MoU) to accelerate the development of quantum computing applications in aerospace and defense.
Aircraft Wire and Cable Market to surpass USD 3.2 Billion by 2034
10/30/2025 | Global Market Insights Inc.The global aircraft wire and cable market was valued at USD 1.8 billion in 2024 and is estimated to grow at a CAGR of 5.9% to reach USD 3.2 billion by 2034, according to recent report by Global Market Insights Inc.
Honeywell Announces Updated Business Segment Structure Ahead Of Aerospace Spin-Off
10/28/2025 | HoneywellHoneywell announced its updated business segment structure ahead of the planned separation of its Aerospace Technologies business, expected in the second half of 2026, and its Solstice Advanced Materials business, expected to be completed on October 30, 2025.
Lockheed Martin Signs Strategic Partnership Framework with Korean Air
10/28/2025 | Lockheed MartinLockheed Martin is collaborating with Korean Air to explore opportunities to support the U.S. government’s (USG) Regional Sustainment Framework (RSF) initiative, as well as expand Maintenance, Repair, Overhaul & Upgrade (MROU) cooperation to third-country markets.