NASA Reaches New Heights in 2015
December 23, 2015 | NASAEstimated reading time: 17 minutes
NASA received in November a full-size test version of the Orion European Service Module provided by ESA (European Space Agency), which is being prepared for testing early next year at the Plum Brook Station test facilities in Sandusky, Ohio.
Progress also continues on SLS -- the world’s most powerful rocket. The booster and engines that will propel SLS and the Orion spacecraft to space passed significant tests this year. The upgraded rocket booster passed a major ground test in March after firing for two minutes, the amount of time it will fire when it lifts SLS off the launch pad. Engineers will conduct a second and final qualification booster firing test in 2016. In August, NASA completed the first series of tests for the upgraded developmental RS-25 engines on the A-1 test stand at NASA’s Stennis Space Center near Bay St. Louis, Mississippi. Preparations will continue in 2016 as the flight engines that will power SLS on missions into deep space will be tested for flight.
For the first time in almost 40 years, a NASA human-rated rocket completed all steps needed to clear a critical design review while the hardware is being built: a structural test article of the rocket’s propulsion system was finished and numerous other flight and qualification hardware were completed and are ready for welding.
Work also began on infrastructure projects supporting SLS and Orion. Construction began in May on a 215-foot-tall structural test stand for SLS at Marshall. In August, NASA completed modifications to the Pegasus barge, previously used to move space shuttle hardware. For its new mission, transporting the core stage of the SLS, a 165-foot center section was added to the barge, bringing its total length from 260 feet to 310 feet.
In addition, Kennedy continued its transformation into a 21st century, multi-user spaceport for both government and commercial customers. Modifications continue on the ground structures that will launch the next generation of rockets and spacecraft. Several new work platforms that will be used to access, test and process SLS and Orion arrived on site, and the giant steel platforms are being installed in the center’s Vehicle Assembly Building.
Testing began at Kennedy on the umbilical system that provides power and ground communications between the mobile launcher tower, rocket and Orion spacecraft. Upgrades and designs in progress were reviewed to ensure they will be ready to support all system and processing requirements for the first launch of SLS and Orion.
Suggested Items
Merlin Circuit Technology Earns NADCAP 2nd Year Merit
05/13/2025 | Merlin Circuit TechnologyMerlin Circuit Technology Ltd, a leading manufacturer of advanced printed circuit boards (PCBs) for mission-critical applications, has announced the successful completion of its latest NADCAP audit, achieving prestigious 2nd Year Merit Status.
Vertical Aerospace, Honeywell Expand Partnership to Bring VX4 eVTOL to Market
05/13/2025 | HoneywellVertical Aerospace and Honeywell announced the signing of a new long-term agreement that expands their existing partnership and reinforces Honeywell’s commitment to the certification and production of Vertical’s electric vertical take-off and landing (eVTOL) aircraft, the VX4.
Barnes Aerospace Appoints George Whittier as CEO
05/12/2025 | BUSINESS WIREBarnes Aerospace, a global provider of component repair services and manufacturer of highly-engineered parts primarily for aeroengines and an operating division of Barnes Group Inc., announced the appointment of George Whittier to the newly created role of CEO, effective May 12, 2025.
'Chill Out' with TopLine’s President Martin Hart to Discuss Cold Electronics at SPWG 2025
05/02/2025 | TopLineBraided Solder Columns can withstand the rigors of deep space cold and cryogenic environments, and represent a robust new solution to challenges facing next generation large packages in electronics assembly.
Kitron: Q1 2025 - Strong Start to the Year
04/25/2025 | KitronKitron reported first-quarter results characterised by continued momentum in the Defence & Aerospace market sector and a growing order backlog.