How Mission Control Used Robotics to Successfully Restore Full Power for the Space Station
May 13, 2019 | NASAEstimated reading time: 2 minutes
Robotics ground controllers in NASA’s Mission Control Center at the agency’s Johnson Space Center in Houston successfully replaced a failed Main Bus Switching Unit (MBSU) on the International Space Station with a spare using robotic operations on Thursday, May 2. The operation to replace the failed unit was conducted using the station’s Canadarm2 and Dextre, both part of Canada’s contribution to the International Space Station.
Using complex robotic work to perform critical maintenance allows astronauts to spend more time working on scientific experiments and helps develop better technologies and procedures for future human and robotic exploration beyond low-Earth orbit.
“Developing new robotic systems is extremely important to get our astronauts back to the Moon by 2024,” Robotics Operations Systems Officer Mike Ferullo said. “The techniques and methods that we are developing with Dextre and Canadarm2 are directly applicable to future missions, and the construction and repair of any Moon-based mission will be done with robotics wherever possible. It’s an extremely exciting time to be involved in space robotics.
Dextre is a versatile robot used to perform routine maintenance on the station. Equipped with lights, video equipment, a tool platform, and four tool holders, Dextre’s dual-arm design and precise handling capabilities reduces the need for spacewalks to conduct maintenance outside the orbiting laboratory.
The Canadarm2 serves as the station’s robotic arm. It’s used to move supplies, equipment, Dextre and even astronauts. The robotic arm is also used to capture visiting spacecraft and attach them to the station.
The completion of the robotics work was the second time an MBSU was swapped out without the need for a spacewalk.
“Previous replacements allowed us to review different arm configurations and the force with which we pulled the unit out,” Ferullo said. “Every operation we do gives us a better understanding about how to move forward with future repairs and the support of payloads.”
The failure on April 29 of the station’s MBSU-3, one of four power distributors on the station’s backbone truss structure, reduced the station’s power supply by nearly 25 percent. Following the failure, the station crew installed a series of jumpers in the station’s Unity connecting module (Node 1) to reroute power to experiments and hardware and ensure limited impact to continued station operations.
“Installing the power jumpers allowed the recovery of several critical pieces of equipment,” Power and Thermal Flight Controller Jay Boucher said. “Even though the jumpers helped continue station operations, replacing the failed unit would be required to regain the redundant power supply required for the US robotic arm to capture SpaceX’s Dragon cargo spacecraft that was scheduled to launch.”
Dragon launched successfully on May 4 and was captured and installed on the Earth-facing side of the station two days later to deliver more than 5,500 pounds of research, crew supplies, and hardware to the International Space Station.
Source: Mark Garcia, MORI Associates
Suggested Items
Würth Elektronik Offers its Radio Module for LoRaWAN Communication
11/19/2024 | Wurth ElektronikWürth Elektronik launches Daphnis-I on the market – a slim, ultra-low power consumption and long range radio module for IoT applications.
RTX's Raytheon Awarded U.S. Army Contract for Wireless Power Beaming Technology
11/18/2024 | Raytheon TechnologiesRaytheon, an RTX, has been awarded a contract from the U.S. Army to work on directed energy wireless power beaming capabilities that will distribute power across the battlefield, simplify logistics, and safeguard locations for U.S. troops.
Boeing Delivers Advanced O3b mPOWER Satellites to Operator SES
11/14/2024 | BoeingBoeing teams have successfully delivered the 7th and 8th O3b mPOWER satellites to SES. These satellites, featuring Boeing’s advanced software-defined communications payload, are being transported to Cape Canaveral for a planned launch in December.
Renesas Jointly Developed World-Class '8-in-1' Proof of Concept with Nidec
11/12/2024 | RenesasRenesas Electronics Corporation, a premier supplier of advanced semiconductor solutions, today announced the world's first “8-in-1” proof of concept* (PoC) for E-Axle systems for electric vehicles (EV), which controls eight functions using a single microcontroller (MCU).
Aismalibar to Showcase Advanced Thermal Management Solutions for Electronics at electronica 2024
11/11/2024 | AismalibarAismalibar, a leading innovator in thermal management solutions, will exhibit at electronica 2024, the world’s foremost trade fair and conference for the electronics industry, held in Munich from November 12-15, 2024. Located at Booth B1.543, Aismalibar will highlight its latest advancements in Thermal Interface Materials (TIMs), Insulated Metal Substrates (IMS), and Thermal FR4 solutions tailored to meet the increasing demands for efficient heat dissipation and durability across various high-power applications.