- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current Issue
Wire Harness Solutions
Explore what’s shaping wire harness manufacturing, and how new solutions are helping companies streamline operations and better support EMS providers. Take a closer look at what’s driving the shift.
Spotlight on Europe
As Europe’s defense priorities grow and supply chains are reassessed, industry and policymakers are pushing to rebuild regional capability. This issue explores how Europe is reshaping its electronics ecosystem for a more resilient future.
APEX EXPO 2026 Preshow
This month, we take you inside the annual trade show of the Global Electronics Association, to preview the conferences, standards, keynotes, and other special events new to the show this year.
- Articles
- Columns
- Links
- Media kit
||| MENU - smt007 Magazine
ICT or Flying Probe: Which Test Is Best for Your Assembly?
July 10, 2019 | Russell Poppe, JJS ManufacturingEstimated reading time: 3 minutes
In-circuit test (ICT) and flying probe are two of the most popular types of automated test equipment (ATE) used in electronic printed circuit board assembly (PCBA). But what sets them apart? And how can you decide on the test strategy that is going to work best for your assemblies? In this article, I highlight the benefits (and the shortcomings) of both ICT and flying probe with a specific focus on three areas: product design, coverage, and cost.
1. Product Design
A good quality test program (also known as good coverage) will rely on the quality of your computer-aided design (CAD) data and schematics. The CAD data is used to generate the basic test programme, which ensures that information is sourced from the original design rather than any manual interpretation of other data. Good quality populated, and unpopulated, sample PCBAs are also vital for fine-tuning the test programmes, debugging, and making any fixtures so that the assemblies physically fit as they were intended.
Thinking about product design for a moment, what are the differences between each test solution which you may want to keep in mind? Flying probe machines, like those offered by Takaya, can probe the ends of component pads and uncovered vias to get access to the electrical networks. ICT will require at least a 50thou wide test pad per net, which has been designed into the PCB upfront and is used as a target for the fixed test probe. Double-sided fixtures can be costly, so these should, ideally, be on one side only of the PCB.
2. Coverage
When I talk about coverage, I’m referring to how much of the circuit you are actually able to test. Both ICT and flying probe carry out what is called a manufacturing defects analysis (MDA), which allows for the majority of the most common process faults that are likely to occur. These can include open circuits (due to insufficient or faulty soldering), short circuits, passive component measurements (resistors and capacitors), diode and transistor orientation, and basic supply voltage measurements.
However, given that these elements are common to both types of the testing platform, what sets them apart?
- Most flying probe systems will offer some form of limited optical inspection, which adds coverage for those components that can’t be accessed electrically; ICT fixtures usually won’t offer the option of optical inspection
- In addition to vectorless test, integrated circuits (ICs) can also include some powered (albeit basic) functional testing to check the soldering of pins to the PCB through a non-contact capacitive probe or plate; in most cases, flying probe is limited to only vectorless test
- ICT can also provide limited analogue and digital measurements, which flying probe isn't capable of due to the limited number of probes
3. Cost
The programming cost will depend on the complexity of the assembly but is broadly the same for either test solution (potentially around $2,500 or so). When it comes to other charges associated with test, however, there are some key differences to bear in mind:
- The fixture costs of flying probe are usually zero; in contrast, an ICT fixture can run to nearly $5,000
- The development lead time for flying probe is typically less than a week; ICT can take up to six weeks for fixture manufacture and programming
- In the event that your product design changes in any way, it will only require a programme change; in the case of ICT, it could well require a new fixture as well if any components or test pads have moved
- The actual machine test time of ICT is usually less than a minute, which means it is ideal for working quickly through larger batches; flying probe, on the other hand, can take several minutes, which means it's often more suited to smaller batches
- The speed of ICT also means that it is relatively inexpensive, often coming in at less than $1.24 per unit; flying probe is a much slower process and can cost $62 or more per assembly)
If you're still unsure about which test option is best for your product, you may find this simple visual checklist useful in comparing the pros and cons:
When it comes to test, each product will have its own unique requirements. But by keeping in mind the primary benefits (and points of difference) of the two platforms, you should feel much better placed to select the best test strategy for your PCBA assembly.
Russell Poppe is the director of technology at JJS Manufacturing.
Testimonial
"Our marketing partnership with I-Connect007 is already delivering. Just a day after our press release went live, we received a direct inquiry about our updated products!"
Rachael Temple - AlltematedSuggested Items
A Designer's Focus on High Density
04/30/2026 | Marcy LaRont, I-Connect007 MagazineVern Solberg is a distinguished member of the Global Electronics Association Raymond E. Pritchard Hall of Fame and has served as chair or vice chair of many committees, developing technical standards and implementation guidelines, including the IPC-7090 series, which focuses on design for manufacturing and reliability for electronic assemblies. He’s a long-time contributor to Design007 Magazine, and he conducted a half-day tutorial at APEX EXPO 2026, where he addressed 2D, 2.5D, and 3D packaging and ultra-high density hybrid bond interconnect. I caught up with Vern at the show and asked about his pivot from addressing more standard design challenges to his focus on high-density circuits.
Zuken Launches GENESYS 2026 to Broaden Access and Improve MBSE Workflows
04/28/2026 | ZukenZuken announced GENESYS 2026, the latest version of its model-based systems engineering platform, with updates designed to improve performance, expand access to model-based information, and enhance the day-to-day modeling experience for engineering teams.
EDADOC: Building the ‘Neural Hub’ for High-Compute Chips Within a Compact Space
04/28/2026 | ECIOEvery chip to the market must pass a stringent checkpoint before shipment known as ATE testing. Serving as the physical “neural hub” that connects test equipment worth millions of dollars with the device under test, the performance of the ATE test board directly determines the accuracy, efficiency, and final yield of chip testing. Amid the rapid rise of high-compute chips, what extreme challenges is this seemingly small circuit board facing? How is EDADOC addressing industry pain points through its one-stop “design + manufacturing” model?
Cadence Reports Q1 2026 Financial Results
04/28/2026 | Cadence Design SystemsCadence had a strong start to 2026, delivering a solid Q1 with accelerating AI demand and record backlog, reflecting strong customer commitment to our AI-driven portfolio,” said Anirudh Devgan, president and chief executive officer.
Tomachie Launches AI-Powered PCB Analysis with Smart Test Point Insertion
04/28/2026 | TomachieTomachie announced its AI-Assisted PCB schematic design analysis platform, enabling engineering teams to evaluate and improve schematic quality before layout begins. Schematic errors caught after layout — or in production — cost 10 to 100 times more to fix than those caught during schematic capture.