Understanding MIL-PRF-31032, Part 6
December 8, 2020 | Anaya Vardya, American Standard CircuitsEstimated reading time: 4 minutes
Concluding this six-part discussion on understanding the military PCB performance standard MIL-PRF-31032, I will address the remaining procedure required to address the unique requirements of the military.
PCI and CVI Inspection
The purpose of this document is to define periodic conformance inspection (PCI) and capability verification inspection (CVI) applicable to the qualified specification sheets, to be used for the purposes of quality monitoring and change control evaluation. These are both requirements that are performed by a DLA approved third-party lab. PCI is typically done monthly and CVI every two years.
PCI
PCI testing is performed on the most complex DoD lot built during the month and tested in accordance with the applicable specification sheet (slash sheet). The data and results of the PCI, including failure analysis, need to be available and submitted to the qualification activity monthly. Any PCI failure will require submitting a corrective action to DLA and also shall require notification to the affected customer within three working days (typically) of the discovery of the failure.
Conformance Inspection Vehicle
The PCI vehicle is generally incorporated into the panel as a dedicated test coupon but can also be a PCB, separate test vehicle, or any combination. Documentation and traceability procedures for conformance inspection shall be the same as for normal production and shall include the design, design rules, test procedures, and process rules. These requirements are normally contained in the production traveler package. The complexity shall reflect, as a minimum, the functionality of the process and technology characteristics, and the design of the vehicle shall reflect the worst-case conditions.
Selection and Submission of Samples for PCI
On a monthly basis, the most complex DoD performance specification lot shall be selected to perform PCI and must include each base material qualified and produced during the month. Preparation of the PCI package is generally done the first week of the month following the month being tested. Complexity must be in accordance with the qualified technology, including attributes such as microvias, layer count, line width, hole size and aspect ratio, etc. One way to determine which military lot was the most complex of the month is to review the microsection log. The location of the test coupons on the panel needs to be identified and documented.
Note: If the design has “foil construction,” surface peel strength samples need to be also submitted for testing. The deliverables to the testing lab include:
- Laboratory test request form
- Samples required for testing
- Master drawing
- Copy of purchase order
- Maintain a copy of all documents submitted to an outside laboratory
Required PCI Tests and Inspections
These include the following:
- Tensile strength
- elongation
- Copper purity
- Rework simulation
- Moisture and insulation resistance
- Surface peel strength (foil lamination lots)
Note: Tensile strength and elongation testing are required (monthly) regardless of whether DoD specification production occurred during the month.
Capability Verification Inspection
Thermal shock testing (typically every two years) is required for each base material type qualified. After thermal shock, the printed board test specimens need to meet the following requirements:
- Visual inspection: When inspected, there shall be no evidence of plating cracks, blistering, crazing, or delamination in excess of that allowed.
- The change in resistance between the first high-temperature cycle and the last high-temperature cycle shall not be more than 10%.
- Destructive physical analysis (DPA) by cross-sectioning: The PCB test specimen shall be vertically cross-sectioned and inspected; requirements specified shall be met.
- “Solder reflow thermal stress” and “direct current-induced thermal cycling” may be considered by the TRB team for CVI but is not required.
As with PCI, any failure will require submitting a corrective action to DLA and also shall require notification to the affected customer within three working days (typically) of the discovery of the failure. CVI reporting shall be approved by the TRB team and submitted to the qualifying activity in order to maintain current DoD qualifications.
The CVI report will outline the supporting data that is being used to support that the capabilities listed for each base material qualification have been met. Supporting data includes In-process, LCI, PCI, and thermal shock test reports. Other production supporting documentation may include the master drawings, lay-up sheets, travelers, etc. Reports are typically required to be submitted within 60 days from the end of the reporting period.
Slash Sheets
Specification or slash sheets can be a bit confusing, but they are basically just performance specs that cover the requirements for PCBs based on their technology as outlined here:
- MIL–PRF–31032/1: Printed Wiring Board, Rigid, Multilayered, Thermosetting Resin Base Material, With or Without Blind and Buried Plated Through-Holes, for Soldered Part Mounting.
- MIL–PRF–31032/2: Printed Wiring Board, Rigid, Single and Double Layer, Thermosetting Resin Base Material, With or Without Plated Through-Holes, for Soldered Part Mounting.
- MIL–PRF–31032/3: Printed Wiring Board, Flexible, Single and Double Layer, With or Without Plated Through-Holes, With or Without Stiffeners, for Soldered Part Mounting.
- MIL–PRF–31032/4: Printed Wiring Board, Rigid-Flex or Flexible, Multilayer, With Plated Holes, With or Without Stiffeners, for Soldered Part Mounting.
- MIL–PRF–31032/5: Printed Wiring Board, Rigid, Multilayered, Thermoplastic or Thermoplastic and Thermosetting Resin Base Material, With Plated Through-Holes, for High-Frequency Applications.
- MIL–PRF–31032/6: Printed Wiring Board, Rigid, Single and Double Sided, Thermoplastic Resin Base Material, With or Without Plated Through-Holes, for High-Frequency Applications.
Conclusion
This concludes this 6-part series on understanding MIL-PRF-31032. I hope the information presented here has been educational and helpful for anyone looking to manufacture for the mil-aero market.
Editor’s note: Read Part 1, Part 2, Part 3, Part 4, and Part 5.
Anaya Vardya is president and CEO of American Standard Circuits; co-author of The Printed Circuit Designer’s Guide to… Fundamentals of RF/Microwave PCBs and Flex and Rigid-Flex Fundamentals; and author of Thermal Management: A Fabricator's Perspective. Visit I-007eBooks.com to download these and other free, educational titles. He also co-authored “Fundamentals of PCB Technology.”
Testimonial
"Advertising in PCB007 Magazine has been a great way to showcase our bare board testers to the right audience. The I-Connect007 team makes the process smooth and professional. We’re proud to be featured in such a trusted publication."
Klaus Koziol - atgSuggested Items
BTU International Earns 2025 Step-by-Step Excellence Award for Its Aqua Scrub™ Flux Management System
10/29/2025 | BTU International, Inc.BTU International, Inc., a leading supplier of advanced thermal processing equipment for the electronics manufacturing market, has been recognized with a 2025 Step-by-Step Excellence Award (SbSEA) for its Aqua Scrub™ Flux Management Technology, featured on the company’s Pyramax™ and Aurora™ reflow ovens.
On the Line With… Ultra HDI Podcast—Episode 7: “Solder Mask: Beyond the Traces,” Now Available
10/31/2025 | I-Connect007I-Connect007 is excited to announce the release of the seventh episode of its 12-part podcast series, On the Line With… American Standard Circuits: Ultra HDI. In this episode, “Solder Mask: Beyond the Traces,” host Nolan Johnson sits down with John Johnson, Director of Quality and Advanced Technology at American Standard Circuits, to explore the essential role that solder mask plays in the Ultra HDI (UHDI) manufacturing process.
Rehm Wins Mexico Technology Award for CondensoXLine with Formic Acid
10/17/2025 | Rehm Thermal SystemsModern electronics manufacturing requires technologies with high reliability. By using formic acid in convection, condensation, and contact soldering, Rehm Thermal Systems’ equipment ensures reliable, void-free solder joints — even when using flux-free solder pastes.
Indium Experts to Deliver Technical Presentations at SMTA International
10/14/2025 | Indium CorporationAs one of the leading materials providers to the power electronics assembly industry, Indium Corporation experts will share their technical insight on a wide range of innovative solder solutions at SMTA International (SMTAI), to be held October 19-23 in Rosemont, Illinois.
Knocking Down the Bone Pile: Revamp Your Components with BGA Reballing
10/14/2025 | Nash Bell -- Column: Knocking Down the Bone PileBall grid array (BGA) components evolved from pin grid array (PGA) devices, carrying over many of the same electrical benefits while introducing a more compact and efficient interconnect format. Instead of discrete leads, BGAs rely on solder balls on the underside of the package to connect to the PCB. In some advanced designs, solder balls are on both the PCB and the BGA package. In stacked configurations, such as package-on-package (PoP), these solder balls also interconnect multiple packages, enabling higher functionality in a smaller footprint.