Boeing Signs First CH-47F Block II Chinook Production Contract
October 4, 2021 | BoeingEstimated reading time: 1 minute
Boeing and the U.S. Army have signed a $136 million contract for the first CH-47F Block II Chinooks.
The Army exercised options for four contracted CH-47F Block II Chinooks with the aircraft scheduled for delivery beginning 2023. Separately, the Army awarded Boeing a $29 million advanced procurement contract for the second production lot of CH-47F Block II aircraft.
The Block II Chinook features multiple upgrades aimed at providing additional lift capability and increasing commonality between U.S. and allied fleets, thus reducing maintenance costs.
“This is a big step in Chinook modernization, supporting the Army’s future multi-domain vision,” said Andy Builta, vice president of Cargo & Utility Helicopters and H-47 program manager. “The Block II technologies will drive commonality across the fleet and enable our soldiers to return home safely for decades.”
The CH-47 Chinook Block II is powered by cutting-edge technologies to lift more throughout the envelope – especially in high, hot operating conditions – all of which enable soldiers to meet tomorrow’s heavy-lift mission requirements. Not only does Block II improve readiness for the U.S. Army and Special Operations warfighters, it also limits future sustainment costs and ensures that the Chinook fleet will be available to serve for decades to come.
The program also supports an essential industrial base, allowing key suppliers within the aerospace sector to remain productive while safeguarding American jobs. With more than 950 Chinooks in 20 countries, the program continues to deliver unrivaled production, maintenance and sustainment cost efficiencies.
Suggested Items
Boeing Validates Software for Future Manned Unmanned Refueling Missions
05/02/2024 | BoeingBoeing has advanced its manned-unmanned teaming (MUM-T) technology using a digital F/A-18 Super Hornet and MQ-25 Stingray. The testing shows the software is maturing for future U.S. Navy use and a potential to deploy the teaming capability on both F/A-18 Block II and III Super Hornets.
Boeing T-7A Red Hawk Triples Progress
05/01/2024 | BoeingThe Boeing T-7A Red Hawk achieved three recent milestones, propelling the advanced pilot trainer for the U.S. Air Force forward.
Boeing, GKN Aerospace Close Deal for St. Louis Site
04/29/2024 | BoeingBoeing has closed a deal with GKN Aerospace St. Louis and its parent company, Melrose Industries, to continue the manufacturing of critical components that support the U.S. government and its allies.
Boeing Opens Research & Technology Center in Japan
04/23/2024 | BoeingBoeing today opened a Boeing Research & Technology (BR&T) Center in Japan that will focus on innovation to enable the commercial aviation industry meet its goal of net zero carbon emissions by 2050.
Boeing Awarded Contract to Continue Extreme Environmental Testing for Critical Defense Platforms
04/04/2024 | BoeingThe U.S. Air Force has awarded Boeing a contract worth up to $559 million over five years to operate, maintain and perform testing at the Little Mountain Test Facility at Hill Air Force Base, Utah.