-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueProduction Software Integration
EMS companies need advanced software systems to thrive and compete. But these systems require significant effort to integrate and deploy. What is the reality, and how can we make it easier for everyone?
Spotlight on India
We invite you on a virtual tour of India’s thriving ecosystem, guided by the Global Electronics Association’s India office staff, who share their insights into the region’s growth and opportunities.
Supply Chain Strategies
A successful brand is built on strong customer relationships—anchored by a well-orchestrated supply chain at its core. This month, we look at how managing your supply chain directly influences customer perception.
- Articles
- Columns
- Links
- Media kit
||| MENU - smt007 Magazine
Supply Chain in Crisis
February 8, 2019 | Nolan Johnson, I-Connect007Estimated reading time: 2 minutes

The ripples start at the very front of the process. The engineering and design teams make choices about the performance characteristics for their project, then select components that fit their performance windows.
Hundreds and even thousands of little choices must be made about which capacitor, resistor, tolerances, materials, and packages; it goes on and on and on. In a traditional design flow, the project team tends to use the parts they already know and have footprints for—maybe a little long in the tooth, but known quantities, after all.
Except these are not traditional times. Component supplies, prices, and lead times are in a great deal of turmoil. The automotive, IoT, and telecommunications sectors are vacuuming components out of the supply chain at a record pace, exerting influences like early obsolescence of older components and more.
With the design completed, the design team passes the bill of materials—including components and the fabricated board, etc.—to the procurement folks. The job is done for the design team, right? Not so fast. Some of those little component decisions—especially the ones to go with a tried-and-true, always-been-there, two-cent passive—may actually be little bombs waiting to go off in that BOM.
Procurement takes over, goes through the BOM line-by-line, and finds all sorts of parts that are no longer able to be sourced through primary suppliers. Those time-honored big-package discretes have gone end of life! Nothing in that size can be found! By the time the buyer finds something that fits the performance specifications, it’s in a 0201 package—but the BOM calls for a 0804.
Now, the procurement team sends two memos: one to the design team to identify the sourcing stalemate, and one to the product manager to tell them the new product introduction schedule is now at risk. Then, procurement makes a flurry of phone calls to try to source parts in non-primary channels, maybe even turning in desperation to grey-market sources.
The problem is even if this crisis gets resolved in procurement, the team still isn’t in the clear. As fast as component availability is changing currently, things aren’t sorted just because the project has moved into manufacturing. Those parts shortages could still arise during manufacturing or between the first and second production runs. No, it isn’t over yet. It seems like it right now, but it’s never over. The repercussions ripple up and down the supply chain at will.
To stay competitive and create long-lived products, design teams need to improve their component selections—and their design skill sets in some cases—to use the parts that will be available long term. They need to pay attention to parts availability in the short term too.
It may begin with the designers—and the designers certainly end up being held accountable to updating the design to keep the product current—but it takes the entire supply chain being in communication to keep everyone informed and in production.
To read the full version of this article, which appeared in the January 2019 issue of SMT007 Magazine, click here.
Testimonial
"Advertising in PCB007 Magazine has been a great way to showcase our bare board testers to the right audience. The I-Connect007 team makes the process smooth and professional. We’re proud to be featured in such a trusted publication."
Klaus Koziol - atgSuggested Items
Analog Devices Launches ADI Power Studio™ and New Web-Based Tools
10/14/2025 | Analog Devices, Inc.Analog Devices, Inc., a global semiconductor leader, announced the launch of ADI Power Studio, a comprehensive family of products that offers advanced modeling, component recommendations and efficiency analysis with simulation. In addition, ADI is introducing early versions of two new web-based tools with a modernized user experience under the Power Studio umbrella:
Cadence Giving Foundation Announces Multi-Year Commitment to Expand the AI Hub at San José State University
10/13/2025 | Cadence Design Systems, Inc.The Cadence Giving Foundation today announced a multi-year commitment to expand the AI Hub at San José State University (SJSU) to equip students with the skills, hands-on training and experience needed to excel in careers in artificial intelligence (AI).
NEDME Returns October 22 — The Northwest’s Premier Design & Manufacturing Expo
10/13/2025 | NEDMEThe Northwest Electronics Design & Manufacturing Expo (NEDME) returns on Wednesday, October 22, 2025, at Wingspan Event & Conference Center, Hillsboro. The event brings together engineers, product designers, manufacturers, educators, and community partners for a full day of industry connection, learning, and networking.
Sumitomo Riko Boosts Automotive Design Efficiency 10x with Ansys AI Simulation Technology
10/13/2025 | SynopsysSumitomo Riko is implementing Ansys, part of Synopsys, Inc. AI technology to accelerate time-to-solution and improve efficiency during the design and manufacturing of automotive components.
Elementary, Mr. Watson: High Power: When Physics Becomes Real
10/15/2025 | John Watson -- Column: Elementary, Mr. WatsonHave you ever noticed how high-speed design and signal integrity classes are always packed to standing room only, but just down the hall, the session on power electronics has plenty of empty chairs? It's not just a coincidence; it's a trend I've observed over the years as both an attendee and instructor.