NASA's Mars 2020 Rover Does Biceps Curls
July 29, 2019 | NASAEstimated reading time: 1 minute
![](https://iconnect007.com/application/files/8116/3131/7855/spacecraft.jpg)
The robotic arm on NASA's Mars 2020 rover does not have deltoids, triceps or biceps, but it can still curl heavy weights with the best. In the clean room of the Spacecraft Assembly Facility at the Jet Propulsion Laboratory in Pasadena, California, the rover's 7-foot-long (2.1-meter-long) arm handily maneuvers 88 pounds' (40 kilograms') worth of sensor-laden turret as it moves from a deployed to a stowed configuration.
The rover's arm includes five electrical motors and five joints (known as the shoulder azimuth joint, shoulder elevation joint, elbow joint, wrist joint and turret joint). The rover's turret includes HD cameras, the Scanning Habitable Environments with Raman & Luminescence for Organics & Chemicals (SHERLOC) science instrument, the Planetary Instrument for X-ray Lithochemistry (PIXL), and a percussive drill and coring mechanism.
On Mars, the arm and turret will work together, allowing the rover to work as a human geologist would: by reaching out to interesting geologic features, abrading, analyzing and even collecting them for further study via Mars 2020's Sample Caching System, which will collect samples of Martian rock and soil that will be returned to Earth by a future mission.
"This was our first opportunity to watch the arm and turret move in concert with each other, making sure that everything worked as advertised — nothing blocking or otherwise hindering smooth operation of the system," said Dave Levine, integration engineer for Mars 2020. "Standing there, watching the arm and turret go through their motions, you can't help but marvel that the rover will be in space in less than a year from now and performing these exact movements on Mars in less than two."
Mars 2020 will launch from Cape Canaveral Air Force Station in Florida in July 2020. It will land at Jezero Crater on Feb. 18, 2021.
Charged with returning astronauts to the Moon by 2024, NASA's Artemis lunar exploration plans will establish a sustained human presence on and around the Moon by 2028. We will use what we learn on the Moon to prepare to send astronauts to Mars.
JPL is building and will manage operations of the Mars 2020 rover for the NASA Science Mission Directorate at the agency's headquarters in Washington.
Suggested Items
TEXMAC/Takaya Appoints Arrowhead as New Rep in Arizona
02/14/2025 | TEXMACTEXMAC, the exclusive authorized distributor of Takaya flying probe test systems in North and South America, announces the appointment of Arrowhead Technical Sales & Marketing, LLC and Brian L. Crisp to represent the company’s flying probe test systems and technology in the state of Arizona. The company is based in Lake Havasu City, AZ, and can be reached at Tel. (909) 273-7111, e-mail brian@arrowheadtechnicalsales.com.
Nordson Electronics Solutions Introduces ASYMTEK Select Coat SL-1040 Ultrasonic Cleaning Station for Maintaining Conformal Coating Equipment
02/13/2025 | Nordson Electronics SolutionsNordson Electronics Solutions, a global leader in reliable electronics manufacturing technologies, announces their latest technology innovation for conformal coating systems, the ASYMTEK Select Coat® SL-1040 Ultrasonic Cleaning Station (patent pending) to keep nozzles and needles clean, and prevent clogging during production
Unveiling the Future: Insights on Next-Gen Megtron Materials
02/13/2025 | Marcy LaRont, I-Connect007In this interview from DesignCon, Jim Kenny, OEM business development manager at Panasonic, touches on next-generation Megtron materials and delves into the industry's growing demand for high-speed, low-loss laminate systems, particularly in light of the anticipated 224 gigabits per second technology. With a focus on material development and production timelines, Jim highlights the challenges and opportunities in meeting customer needs while also maintaining quality and supply chain stability. As Panasonic prepares for the evolving landscape, they remain committed to innovating in this competitive market.
Infineon Reaches Next Milestone on 200 mm SiC Roadmap
02/13/2025 | InfineonInfineon Technologies AG has made significant progress on its 200 mm silicon carbide (SiC) roadmap. The company will already release the first products based on the advanced 200 mm SiC technology to customers in Q1 2025.
ICAPE Group Reports 2024 Full-Year Revenue of €181.6 Million
02/13/2025 | BUSINESS WIREThe ICAPE Group, a global technology distributor of printed circuit boards (PCB) and custom-made electromechanical parts, today announced its revenue for the 2024 financial year, ending December 31.