Fast-Track to the Moon: NASA Opens Call for Artemis Lunar Landers
October 1, 2019 | NASAEstimated reading time: 3 minutes
NASA is seeking proposals for human lunar landing systems designed and developed by American companies for the Artemis program, which includes sending the first woman and next man to the surface of the Moon by 2024.
The final call to industry comes after NASA issued two drafts on July 19 and Aug. 30, encouraging companies to send comments to help shape a key component of the agency’s human exploration Artemis partnerships. NASA is expected to make multiple awards to industry to develop and demonstrate a human landing system. The first company to complete its lander will carry astronauts to the surface in 2024, and the second company will land in 2025.
Proposals to build a landing system are due Nov. 1—an ambitious timeline consistent with the sequence of events leading to this point—however, companies have been preparing for, reviewing, and commenting on several drafts of NASA’s broad agency announcement since mid-July and should be ready for this tight timeline.
“In order to best accelerate our return to the Moon and prepare for Mars, we collaborated with industry on ideas to streamline the procurement process,” said Marshall Smith, director of the Human Lunar Exploration Program at NASA Headquarters in Washington. “The private sector was eager to provide us feedback throughout this process, and we received more than 1,150 comments on the draft solicitations issued over the summer.”
Typical spaceflight hardware can take six to eight years to develop. With less than five years to land astronauts on the Moon, every word and requirement counts.
After reviewing the comments, NASA removed requirements that industry perceived as potential barriers to speed while preserving all the agency’s human safety measures. For example, industry stated that delivery of a high number of formal technical reports would require a company to spend considerable resources and incur undue schedule risk. Taking this into consideration, NASA has designed a less formal insight model that will be used for accessing critical contractor data while minimizing administrative overhead. As a result, NASA reduced the number of required contract deliverables from 116 to 37.
“Reports still are valuable and necessary, but to compromise and ease the bulk of the reporting burden on industry, we are asking for access to the companies’ systems to monitor progress throughout development,” said Nantel Suzuki, the Human Landing System program executive at NASA Headquarters in Washington. “To maximize our chances of successfully returning to the Moon by 2024, we also are making NASA’s engineering workforce available to contractors and asking proposers to submit a collaboration plan.”
When called to accelerate its return to the Moon, NASA said it would meet this ambitious goal by “any means necessary.” The agency’s preferred approach to a lunar landing is for the crew in the Orion spacecraft and the uncrewed human landing system to launch separately and meet in lunar orbit at the Gateway, which is critical to long-term exploration of the Moon. NASA wants to explore all options to achieve the 2024 mission and remains open to alternative, innovative approaches.
Another shift centered around how to best achieve sustainability on the Moon by 2028. In addition to greater performance, such as global lunar surface access and higher payload mass capacity, NASA originally required the Human Landing System to be refuelable as a means to ensure a more sustainable exploration architecture. Multiple companies had concerns about this requirement, and NASA agreed to remove it so that industry has greater flexibility to address the more fundamental attribute of sustainability, which is long-term affordability.
“They were absolutely right,” said Lisa Watson-Morgan, the Human Landing System program manager at NASA’s Marshall Spaceflight Center in Huntsville, Alabama. “We are operating on a timeline that requires us to be flexible to encourage innovation and alternate approaches. We still welcome the option to refuel the landing system, but we removed it as a requirement.”
NASA’s Artemis program includes sending a suite of new science instruments and technology demonstrations to study the Moon, landing the first woman and next man on the lunar surface by 2024, and establishing a sustained presence by 2028. The agency will leverage its Artemis experience and technologies to prepare for the next giant leap – sending astronauts to Mars.
Testimonial
"We’re proud to call I-Connect007 a trusted partner. Their innovative approach and industry insight made our podcast collaboration a success by connecting us with the right audience and delivering real results."
Julia McCaffrey - NCAB GroupSuggested Items
SMTA Announces 2026 STAR Forum Technical Program
04/16/2026 | SMTAThe SMTA announced the finalized program for the High Reliability: Strategic Technology Advancement Research Forum which takes place on May 6-7, 2026 in Olathe, Kansas, USA.
From AI to AEP, an Impressive Array of Keynotes at APEX EXPO 2026
04/17/2026 | Marcy LaRont and Nolan Johnson, I-Connect007Each year at APEX EXPO, the Global Electronics Association provides an impressive lineup of keynote speakers to kick off the largest electronics manufacturing event in North America. This year included four keynote speeches, on topics ranging from the promise and peril of AI to the power of electronics, quantum computing, and the importance of heterogeneous integration in advanced electronics packaging.
Breaking the Manual Quoting Bottleneck in Wire Harness
04/15/2026 | Nolan Johnson, SMT007 MagazineArik Vrobel has spent more than 35 years in wire harness manufacturing—starting in EL-Com, his father's shop, building it into a nationally recognized contract manufacturer, and ultimately selling to Aptiv/Winchester in 2021. But retirement didn't last long. Within months, Arik was back, not as a manufacturer this time, but as a technologist. His new company, Cableteque, is building the quoting and data automation platform he always wished existed.
Podcast Hits the Mark in a Materials Market
04/15/2026 | Marcy LaRont, I-Connect007The base material of a printed circuit board is its literal and functional foundation. Isola, founded in 1912 in Düren, Germany, is one of the longest-standing manufacturers of glass-reinforced laminates in the electronics industry. Originally focused on insulation and fiberglass materials, the company played an early role in supplying the foundational substrates that enabled the growth of PCB technology. As electronics advanced, Isola evolved alongside the industry, expanding from basic glass-epoxy laminates into high-performance copper-clad materials and engineered prepregs.
New EIPC President: Building Strength Through Unity in Europe’s Electronics Industry
04/14/2026 | Marcy LaRont, I-Connect007Industry veteran Rico Schluter, newly appointed president of EIPC, discusses his decades-long journey through the European PCB industry and his vision for its future. From building advanced manufacturing operations to leading large-scale facility development in Lithuania, Rico shares insights into automation, workforce evolution, and the challenges of scaling production. He emphasizes the urgent need for stronger collaboration across European industry organizations to effectively influence policy in Brussels, particularly around supply chain resilience, trade regulations, and energy-related incentives.