-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueInventing the Future with SEL
Two years after launching its state-of-the-art PCB facility, SEL shares lessons in vision, execution, and innovation, plus insights from industry icons and technology leaders shaping the future of PCB fabrication.
Sales: From Pitch to PO
From the first cold call to finally receiving that first purchase order, the July PCB007 Magazine breaks down some critical parts of the sales stack. To up your sales game, read on!
The Hole Truth: Via Integrity in an HDI World
From the drilled hole to registration across multiple sequential lamination cycles, to the quality of your copper plating, via reliability in an HDI world is becoming an ever-greater challenge. This month we look at “The Hole Truth,” from creating the “perfect” via to how you can assure via quality and reliability, the first time, every time.
- Articles
- Columns
- Links
- Media kit
||| MENU - pcb007 Magazine
NCAB: Restriction Order of Power Supply Affecting PCB Production
October 1, 2021 | NCABEstimated reading time: 1 minute
As we have moved into the second half of this year, growth rates associated with increased post-pandemic demand observed within almost all manufacturing sectors has had a huge impact on power consumption within many provinces across China.
The shortage of energy combined with China’s “double control” policy, which is aimed at a reduction of energy consumption and conservation in line with a carbon neutral target, has seen some local governments implement strict energy consumption levels resulting in power limitations that are causing many manufacturing companies to limit or stop production, as well as leaving factories and homes without electricity amid soaring prices.
The current electricity shortages are affecting manufacturers across virtually all mainland China, with up to 44% of China’s industrial activity affected with many factories introducing mandatory worker vacations to counter the stops in production. This situation affects our factories leading to extended lead times. Our factory management teams are working closely with our factories to secure delivery and production schedules.
NCAB Actions include
- NCAB prioritization – from senior management down to production schedulers.
- Daily review of all open orders from NCAB Group within factory production schedules.
- Constant updates on local electricity limitations / planned production stops.
- Ensuring weekly production lead-time updates take into account potential stops.
What can I as a customer do?
NCAB can exert better control on orders on hand rather than future lead time, meaning it is recommended that you place your orders sooner rather than later. Please be open for a dialogue with your contact person so we can understand and plan for your production needs.
For further information, please contact your local NCAB office.
Testimonial
"The I-Connect007 team is outstanding—kind, responsive, and a true marketing partner. Their design team created fresh, eye-catching ads, and their editorial support polished our content to let our brand shine. Thank you all! "
Sweeney Ng - CEE PCBSuggested Items
I-Connect007 Editor’s Choice: Five Must-Reads for the Week
08/29/2025 | Nolan Johnson, I-Connect007This week, we bring you Global Electronics Association’s Chris Mitchell’s government relations column on—you guessed it—trade deals. TTM is balancing its facilities between East and West. The Global Electronics Association released July numbers for North American PCB shipments, and the news is good. Meanwhile, the corresponding report for EMS might seem like bad news, but that’s misleading. Be sure to look deeper for the rest of the story. Finally, for a bit space-science palate cleansing, I’m sharing news of the latest launch of NASA’s X-37B.
ICZOOM Launches PCB & SMT Services to Strengthen One-Stop Electronics Industry Solution at IIC Shenzhen 2025
08/28/2025 | PRNewswireICZOOM Group Inc., a B2B electronic component products e-commerce platform, successfully exhibited at the 2025 International Integrated Circuit & Component Exhibition and Conference (IIC Shenzhen 2025) held from August 26 to 28 at the Shenzhen Convention & Exhibition Center in Futian District.
AT&S Fuels Future Innovation with 'Young Wilds' Program
08/28/2025 | AT&SToday’s ideas are tomorrow’s innovations: Following a successful debut in the financial year 2024/25, the “Young Wilds” program offers ambitious young professionals at AT&S the opportunity to take on responsibility and accelerate their personal and professional growth.
North American PCB Industry Shipments Up 20.7 Percent in July
08/27/2025 | Global Electronics AssociationThe Global Electronics Association announced today the July 2025 findings from its North American Printed Circuit Board (PCB) Statistical Program. The book-to-bill ratio stands at 1.00. Total North American PCB shipments in July 2025 were up 20.7% compared to the same month last year.
Mastering PCB Floor Planning
08/28/2025 | Stephen V. Chavez, Siemens EDAPlacement of PCB components is far more than just fitting components onto a board. It’s a strategic and critical foundational step, often called “floor planning,” that profoundly impacts the board’s performance, reliability, manufacturability, and cost. Floor planning ties into the solvability perspective, with performance and manufacturability being the other two competing perspectives for addressing and achieving success in PCB design.