Arabsat Badr-8 Launched With Airbus’ Optical Communications Payload TELEO
May 30, 2023 | AirbusEstimated reading time: 1 minute

The Airbus-built Arabsat Badr-8 telecommunications satellite has been successfully launched from Cape Canaveral, Florida. Based on Airbus’ latest geostationary Eurostar Neo satellite, Badr-8 will provide connectivity for users across Europe, Middle East, Africa, and central Asia.
The spacecraft is also equipped with a world first, Airbus’ innovative space demonstrator TELEO to provide space to ground optical communications at gigabit speeds. The TELEO demonstrator payload is designed to facilitate very high capacity optical feeder link communications, playing a crucial role in Airbus’ development of a new generation of optical communications technology in space.
Jean Marc Nasr, Head of Space Systems said: “Marking our third successful launch of the Eurostar Neo series and our eighth spacecraft built for Arabsat, Badr-8, equipped with the very innovative TELEO payload, is the latest major milestone for our telecoms business. Featuring increased payload capacity and more efficient power and thermal control systems, Badr-8 will replace and increase Arabsat’s capacity.
Following the successful launch and separation, Badr-8 is using its electric propulsion system to reach geostationary orbit at 36,000 km. The satellite will then undergo a comprehensive testing period in geostationary orbit before entering full service. With a launch mass of 4.5 tons and 17.8 kW of power, the satellite is designed to operate in orbit for 15 years. Airbus’ ultra-reliable geostationary telecommunications satellites have achieved more than 1,300 years of service in orbit.
Airbus’ Eurostar Neo platform has been developed in the frame of the European Space Agency's (ESA) Partnership Projects, together with the French space agency CNES, and strongly supported by the UK Space Agency and other agencies across Europe. The TELEO demonstrator payload was developed with support from CNES.
Suggested Items
Department of the Air Force Outlines Fiscal 2026 Budget Priorities to Congressional Panel
05/07/2025 | United States Space ForceThe three most senior civilian and military officials from the Department of the Air Force told a congressional panel May 6 that “the strategic landscape has shifted dramatically” and that the Air Force and Space Force need the resources and creative thinking, along with modern capabilities, to meet emerging threats.
Proposed NASA Budget Redirects Funding Toward Mars, Ends Key Programs
05/06/2025 | I-Connect007 Editorial TeamThe Trump administration has proposed a $6 billion reduction to NASA’s budget for FY 2026, with $1 billion redirected toward Mars-focused programs. According to a discretionary budget document published on NASA’s website, the plan shifts resources toward returning to the Moon ahead of China and initiating a human mission to Mars.
SAIC Awarded New $55 Million Mission Integration Contract From Space Development Agency
05/05/2025 | SAICScience Applications International Corp. has been awarded the Proliferated Warfighter Space Architecture (PWSA) Tranche 3 Program Integration (T3PI) contract from the Space Development Agency (SDA).
Lockheed Martin Completes Orion Development for Artemis II Moon Mission
05/05/2025 | Lockheed MartinLockheed Martin has completed assembly and testing of NASA's Orion Artemis II spacecraft, transferring possession to NASA's Exploration Ground Systems (EGS) team.
'Chill Out' with TopLine’s President Martin Hart to Discuss Cold Electronics at SPWG 2025
05/02/2025 | TopLineBraided Solder Columns can withstand the rigors of deep space cold and cryogenic environments, and represent a robust new solution to challenges facing next generation large packages in electronics assembly.