Energix Renewables, First Solar Enter into Framework Agreement
July 20, 2023 | Business WireEstimated reading time: 3 minutes

First Solar, Inc. announced that Energix Renewables has agreed to procure 51 gigawatts (GWDC) of its responsibly produced, ultra-low carbon thin film solar modules. The modules, which will power Energix projects in Israel, Poland, and the United States, will be delivered between 2026 and 2030. Energix, one of Israel’s largest renewable energy companies with a portfolio of more than 7 GW of projects under development in Israel, Poland and the United States, has also contracted First Solar Recycling Services to manage end-of-life handling of decommissioned modules. Prior to this deal, the company has placed over 3.5 GWDC of orders for First Solar technology since 2017.
“As we grow our pipeline, we want a trusted partner that will not compromise on quality, its commitments, or principles, and that partner is First Solar,” said Asa (Asi) Levinger, chief executive officer, Energix. “This deal, our largest ever, strongly reflects the long-term strategic partnership we share with First Solar. It also constitutes a significant milestone for Energix's long-term growth, as we rapidly expand our global pipeline, with an emphasis on the United States. With shared goals and a united vision for a sustainable energy future, this deal perfectly suits our needs, paving the way for groundbreaking achievements and reinforcing our commitment to our stakeholders.”
“This deal demonstrates once again the substantial place Energix takes as one of our biggest client worldwide, and we feel honorable to take active part in Energix’s significant growth, especially in the United States. We are pleased that Energix will power its asset portfolio with First Solar’s module technology,” said Georges Antoun, chief commercial officer, First Solar. “This is another example of a large, sophisticated player choosing to de-risk its development portfolio by working with us. They recognize that they do not simply get a high-quality, high-performance, responsibly-produced PV module, but a trusted partner and long-term pricing and supply certainty, which are rarities in the solar industry.”
First Solar’s responsibly produced, advanced thin film photovoltaic (PV) modules set industry benchmarks for quality, durability, reliability, design, and environmental performance. The company’s solar modules have the lowest carbon and water footprint of any commercially available PV module today, and it’s the first PV manufacturer to have its product included in the Electronic Product Environmental Assessment Tool (EPEAT) global registry for sustainable electronics. End-of-life modules from Energix projects will be processed by First Solar’s pioneering high value recycling program, which provides closed-loop semiconductor recovery for use in new modules, while also recovering other materials including aluminum, glass, and laminates.
First Solar’s differentiated thin film semiconductor, integrated manufacturing process and tightly controlled supply chain helps eliminate the risk of exposure to solar supply chains identified by the US Department of Labor’s 2022 List of Goods Produced by Child Labor or Forced Labor as being tainted by forced labor. The company is the only one of the world’s ten largest solar manufacturers to be a member of the Responsible Business Alliance (RBA), the world’s largest industry coalition dedicated to supporting the rights and well-being of workers and communities in the global supply chain, and the company has zero tolerance for forced labor in its manufacturing or its supply chains.
First Solar is investing approximately $1.3 billion in expanding its US manufacturing footprint from over 6.5 gigawatts (GWDC) of annual nameplate capacity currently, to approximately 10.9 GWDC by 2026. In addition to the $1.1 billion expected investment in a new 3.5 GWDC facility in Alabama, the company has also embarked on a $185 million expansion of its existing manufacturing footprint in Ohio. First Solar, the largest solar manufacturer in the Western Hemisphere, also announced an investment of up to $370 million for a dedicated research and development (R&D) innovation center in Perrysburg, Ohio, which is expected to be completed in 2024.
Testimonial
"Advertising in PCB007 Magazine has been a great way to showcase our bare board testers to the right audience. The I-Connect007 team makes the process smooth and professional. We’re proud to be featured in such a trusted publication."
Klaus Koziol - atgSuggested Items
Statement from the Global Electronics Association on the July 2025 Tariff on Copper Foil and Electronics-Grade Copper Inputs
07/31/2025 | Global Electronics AssociationWe are disappointed by today’s decision to impose a 50% tariff on imported copper foil and other essential materials critical to electronics manufacturing in the United States.
Direct Metallization: A Sustainable Shift in PCB Fabrication
07/31/2025 | Jim Watkowski, Harry Yang, and Mark Edwards, MacDermid Alpha Electronics SolutionsThe global electronics industry is undergoing a significant transformation, driven by the need for more resilient supply chains and environmentally sustainable manufacturing practices. Printed circuit boards (PCBs), the backbone of interconnection for electronic devices, are at the center of this shift. Traditionally, PCB fabrication has relied heavily on electroless copper, a process that, while effective, is resource-intensive and environmentally hazardous. In response, many manufacturers are turning to direct metallization technologies as a cleaner, more efficient alternative.
SuperX Announces Plan for the Establishment of its AI Supply Center in Japan to Accelerate End-to-End Solution Delivery
07/28/2025 | PRNewswireSuper X AI Technology Limited, a leading provider of AI infrastructure solutions, announced a major strategic expansion of its global supply chain and service capabilities with the planned establishment of its first regional supply center in Japan by its wholly-owned subsidiary in Singapore, SuperX Industries Pte. Ltd.
American Made Advocacy: A Growing Presence in Washington in Turbulent Times
07/29/2025 | Shane Whiteside -- Column: American Made AdvocacyLast month, PCBAA held its fourth annual meeting in Washington, D.C. It was our largest gathering to date and included speakers from the House and Senate, the Department of Commerce, and OEMs Lockheed Martin, RTX, and Northrop Grumman. We also spent a day on Capitol Hill educating lawmakers and their staff about the importance of a secure domestic microelectronics supply chain.
Blackwell to Account for Over 80% of NVIDIA’s High-End GPU Shipments in 2025: Liquid Cooling Adoption Continues to Rise
07/24/2025 | TrendForceTrendForce’s latest investigations find that the overall server market has recently stabilized, with ODMs concentrating efforts on AI server development.