Do You Collaborate With Your Component Supplier?
July 15, 2024 | Andy Shaughnessy, Design007 MagazineEstimated reading time: 2 minutes
Mention the word “collaboration” to a group of designers, and a few of them might acknowledge working closely with their fab and assembly partners. But how many designers consider their component providers to be true stakeholders in the process and collaborate with them regularly?
Duane Benson, founder of Positive Edge, has a long history of working on the component side of things. I asked Duane to weigh in with his thoughts on collaborating with component suppliers.
Andy Shaughnessy: We hear a lot of talk about the need for designers to collaborate with their fab and assembly partners, but component providers seem to be left out of the mix. Do you think component providers are also “stakeholders” in this process?
Duane Benson: Component suppliers are absolutely stakeholders in the design process. The supply chain isn't in as bad shape as it was a few years ago, but there is still too much variability to take it for granted. It's not uncommon to have easy availability for prototype quantities but limited availability for production quantities, or one package may be in good supply, but the one you want, not so much. Good supply chain partners can keep you from designing with unavailable parts, and they can help you find subs.
Shaughnessy: What does true collaboration look like between design, fab, assembly, and component provider?
Benson: In true collaboration, early BOMs are cleared with the supply chain, and are re-cleared at intervals throughout the design process—and not just for exotic parts. Sometimes passives and other common parts have issues too. Supply chain may also know about new and upcoming parts that could simplify a design. Fab and assembly should be used from the start for ground rules. Complex footprints or packages must be run past both fab and assembly for layout and manufacturing considerations.
Shaughnessy: After the supply chain snafu a few years back, it seems like a no-brainer to keep your component supplier in the loop. Do you think designers are communicating more now with the component folks?
Benson: Not really. Even during the worst of the troubles, engineers would often pick components without thought to availability. A tweak or redesign based on availability was too often a last resort and probably still is. The draw of a hot new MCU or such always seems to override the fact that more than prototype quantities are a year away.
To read this entire conversation, which appeared in the June 2024 issue of Design007 Magazine, click here.
Suggested Items
All Flex Solutions Invests in Assembly Inspection Automation
10/17/2024 | All Flex SolutionsAll Flex has acquired an Omron VP9000 3D Solder Paste Inspection System and an Omron VT-S1080 3D Automatic Optical Inspection System for their flexible circuit assembly facility in Bloomington, Minnesota. These acquisitions are one part of All Flex Solutions’ four-year SMT Roadmap to expand the scale and capability of their assembly operations.
ERAI: The Counterfeit Watchdog
10/16/2024 | Nolan Johnson, SMT007 MagazineRick Smith is vice president of business development at ERAI, an organization founded in 1995 as a watchdog for the electronic component distribution section, aiming to combat bad business practices and counterfeiting. Rick definitely has some stories to tell about the hows and whys of counterfeiting, and breaks down some compelling numbers when it comes to fake parts being sold into the open market.
Untapped Potential: Automating Warehouse Management Into the Present
10/15/2024 | Josh Casper, Horizon SalesThe push toward automation in electronics manufacturing has led to significant improvements in SMT and through-hole technology (THT) production. Today’s manufacturers are outfitted with precision pick-and-place machines, sophisticated inspection systems, and advanced solder deposition solutions. These investments reflect a broader industry trend toward automating high-value production tasks to boost efficiency, improve quality, and reduce headcount in a shrinking labor market. While the spotlight has rightly focused on automating SMT production, one crucial area remains woefully under-invested: materials storage and handling.
Murata Launches New Silicon Capacitor Production Line
10/11/2024 | SELMurata Manufacturing Ltd, a leading manufacturer of electronic components, modules, and devices, has broadened the scope of its Integrated Passive Solutions offering by opening a new production line at its site in Caen, France.
AIM to Present on Ultra-Miniature Component Assembly at SMT-Info
10/02/2024 | AIMAIM Solder, a leading global manufacturer of solder assembly materials for the electronics industry, is pleased to announce its participation in the upcoming SMT-Info Technical Conference taking place October 15-16 in Brno, Czech Republic.