-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueVoices of the Industry
We take the pulse of the PCB industry by sharing insights from leading fabricators and suppliers in this month's issue. We've gathered their thoughts on the new U.S. administration, spending, the war in Ukraine, and their most pressing needs. It’s an eye-opening and enlightening look behind the curtain.
The Essential Guide to Surface Finishes
We go back to basics this month with a recount of a little history, and look forward to addressing the many challenges that high density, high frequency, adhesion, SI, and corrosion concerns for harsh environments bring to the fore. We compare and contrast surface finishes by type and application, take a hard look at the many iterations of gold plating, and address palladium as a surface finish.
It's Show Time!
In this month’s issue of PCB007 Magazine we reimagine the possibilities featuring stories all about IPC APEX EXPO 2025—covering what to look forward to, and what you don’t want to miss.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - pcb007 Magazine
GPV Enters Power Purchase Agreement for Danish Solar Park
September 26, 2024 | GPVEstimated reading time: Less than a minute

Recently, GPV entered into a Power Purchase Agreement (PPA) with Reel for its Danish entities. The PPA supports the construction of a 14,00 GWh/year solar park situated at Mesballe on Djursland in Denmark.
With the agreement, GPV purchases approx. 5% of the solar park’s expected production. The electricity will be used at GPV’s two Danish production sites in Tarm and Aars. The agreement covers around 1/3 of GPV’s Danish electricity consumption at the two Danish production sites.
The agreement is valid for five years from when the park is put into operation, expected in December 2024.
“I am very pleased with this agreement which will bring us one step closer to our GHG 2028 target. We have ambitious targets to reduce our scope 1 & 2 carbon emission intensity by 70% towards 2028 (baseline 2020) through various reduction and optimisation initiatives as well as through PPAs and we are actively looking into pursuing additional PPA agreements in other European countries,” says Bo Lybæk, CEO at GPV Group A/S.
Suggested Items
Kitron Signs €7 Million Annual Manufacturing Agreement for Advanced Sensor Technology
05/09/2025 | KitronKitron has entered into a multi-year agreement with a U.S.-based customer to manufacture advanced sensor-based products intended for the European market.
Dixon, Inventec Form JV for PC Manufacturing in India
05/05/2025 | DixonDixon has entered into Joint Venture Agreement (JV Agreement) with Inventec. Pursuant to the said JV Agreement, Dixon IT Devices Private Limited (JV Company) will be 60% owned by Dixon and 40% owned by Inventec.
Spirit AeroSystems Reports First Quarter 2025 Results
05/02/2025 | Spirit AeroSystems, Inc.Spirit's revenue in the first quarter of 2025 decreased from the same period of 2024, primarily due to lower production activity on most Boeing programs, particularly the Boeing 737 program.
Airbus Signs Definitive Agreement with Spirit AeroSystems
04/28/2025 | AirbusAirbus SE has entered into a definitive agreement with Spirit AeroSystems for the acquisition of industrial assets dedicated to its commercial aircraft programmes.
QuantumScape, Murata Announce Framework for Ceramics Collaboration
04/25/2025 | BUSINESS WIREQuantumScape Corporation, a global leader in next-generation solid-state lithium-metal battery technology, and Murata Manufacturing Co. have entered into the first phase of an agreement to explore a collaboration for high-volume manufacturing of ceramic film for QS’s solid-state battery technology.