Share on:

Share on LinkedIn Share on X Share on Facebook Share with email

Suggested Items

Airbus Awarded Eutelsat Contract to Build OneWeb Low Orbit Constellation Extension

12/19/2024 | Airbus
Airbus Defence and Space has been awarded a contract by Eutelsat to build the extension of its OneWeb Low Earth Orbit (LEO) constellation.

Dicro Accepted as a Member of the Defence and Aerospace Industry Association PIA

12/18/2024 | Dicro Oy
Dicro is proud to announce that the company has been accepted as a member of the Defence and Aerospace Industry Association PIA, starting from January 1, 2025. This membership reinforces Dicro's commitment to high-quality and innovative solutions in the defence and aerospace sectors.

Seventh Lockheed Martin-Built GPS III Satellite Launches

12/17/2024 | Lockheed Martin
The seventh Lockheed Martin-designed and -built Global Positioning System (GPS) III space vehicle, GPS III SV07, launched from Cape Canaveral Space Force Station, Florida, into orbit 12,550 miles above earth.

Kickstart 2025 With Advanced PCB Design Skills

12/17/2024 | Corey Lynn, IPC
As the new year approaches, it's the perfect time to set your professional goals and enhance your expertise in the dynamic field of electronics. IPC's January and February 2025 lineup offers a variety of courses designed to meet the needs of professionals at every level of their career, from beginners to seasoned experts. Whether you're looking to delve into the intricacies of radio frequency PCB design, tackle the challenges of military and aerospace applications, or start from the basics with our introductory courses, there's something for everyone. Enroll today and take the next step toward mastering your craft in the electronics industry.

PCB Fabricator Cistelaier Receives ESA Qualification

12/16/2024 | Cistelaier
The capability and independence of its space industry are strategic for Europe, and the European Space Community needs a qualified, resilient supply chain with adequate production capacity. Specifically, it requires greater production capacity in PCB manufacturing. On this premise, in early 2020, Cistelaier began the process of obtaining an ESA qualification.
Copyright © 2024 I-Connect007 | IPC Publishing Group Inc. All rights reserved. Log in