Japan’s OHISAMA Project Aims to Beam Solar Power from Space This Year
July 14, 2025 | I-Connect007 Editorial TeamEstimated reading time: 1 minute
Japan could be on the cusp of making history with its OHISAMA project in its quest to become the first country to transmit solar power from space to Earth, The Volt reported.
Developed by Japan Space Systems, the ambitious initiative seeks to harness the sun’s energy in space and beam it back to Earth, potentially revolutionizing the generation and distribution of clean energy. The project aims to be operational later this year, and if successful, the landmark project could see space-based solar power (SBSP) as an additional source of clean, continuous electricity.
The plan is to launch a 180-kilogram satellite into low Earth orbit (LEO) at an altitude of 400 kilometers. Equipped with a 2-square-meter photovoltaic (PV) panel, the satellite will convert solar energy into electricity, store it in onboard batteries, and then beam it as microwave energy to a receiving station on Earth.
Although the system will transmit only 1 kilowatt—enough to power a small appliance — at the April 2024 International Conference on Energy from Space in London, Japan Space Systems adviser Koichi Ijichi said, “This mission marks a pivotal step towards realizing space-based solar power stations that could provide clean energy irrespective of weather conditions on Earth,” Space.com reported.
A January 2024 NASA report raised concerns about cost and excessive greenhouse gases produced by rockets launching assemblies into orbit, which the report stated could threaten to tip the scales, making SBSP much less climate-friendly than Earth-based technologies.
However, RatedPower reported that advances in launch vehicles, solar panels, and wireless transmission could gradually make SBSP viable, given that orbital systems can generate up to 13 times more energy than ground-based panels, potentially matching the output of nuclear plants.
Japan hopes OHISAMA will pave the way for future gigawatt-scale SBSP systems to deliver around-the-clock, weatherproof renewable power from space.
Testimonial
"Our marketing partnership with I-Connect007 is already delivering. Just a day after our press release went live, we received a direct inquiry about our updated products!"
Rachael Temple - AlltematedSuggested Items
Würth Elektronik Restructures its Spacer Product Range
02/11/2026 | Wurth ElektronikWürth Elektronik restructures its SMT spacers for printed circuit boards to use lead-free alloys.
New Studies for Manufacturing Advanced Materials in Orbit
02/09/2026 | UK Space AgencyThe UK Space Agency has awarded contracts to three UK companies to investigate producing these advanced materials in Low Earth Orbit, where the conditions – including microgravity, natural vacuum, and extreme temperatures – can create products that are difficult, expensive, or impossible to manufacture on Earth.
RTX to Invest $139 Million in Singapore, Signing Multiple MOUs with Economic Development
02/05/2026 | RTXAt the Singapore Air Show, RTX signed multiple memoranda of understanding with the Singapore Economic Development Board (EDB), further strengthening its long-term commitment to the country's aerospace ecosystem.
TTM Technologies Appoints Two New Independent Directors
02/05/2026 | TTM TechnologiesTTM Technologies announced that, after long and distinguished careers with TTM, Thomas Edman, the Company’s former President and Chief Executive Officer and a current Class I member of the Board of Directors, and John Mayer, a current Class III member of the Board, will retire from the Board effective as of May 7, 2026, immediately following the Company’s 2026 annual meeting of stockholders.
Beyond the Board: The Benefits of Early PCB Engagement in Aerospace and Defense Programs
02/03/2026 | Jesse Vaughan -- Column: Beyond the BoardAerospace and defense programs don’t operate on commercial timelines. Once a platform is qualified, it may remain in production, sustainment, or upgrade cycles for decades. Yet many of the most consequential decisions affecting that lifecycle are often made at the PCB design stage, and long before a program reaches production or even formal qualification.