The Key to First-pass Success in PCB Design
April 10, 2025 | Gerry Partida, Summit InterconnectEstimated reading time: 1 minute

In the dynamic world of PCB manufacturing, achieving first-pass success hinges on more than just cutting-edge equipment and skilled teams. At Summit Interconnect, we have seen countless successful launches of advanced HDI designs that can be traced directly to engagement between designers and fabricators early in the design phase.
Unfortunately, collaboration in the PCB industry often begins only after problems arise—such as field failures, assembly fallout, or low fabrication yields. This reactive approach is the wrong starting point for collaboration.
When issues surface late in the design cycle or during production, the costs of fixing them escalate exponentially. Redesigns, delays, and rework add unnecessary complexity and expense, while product reliability and time-to-market suffer. To avoid these challenges, collaboration needs to occur earlier in the design cycle, where issues can be proactively addressed.
Bridging the Knowledge Gap
PCB designers often focus on functionality, performance, and compliance with end-use requirements. Meanwhile, fabricators look at manufacturability, process efficiency, and cost optimization. Proactive collaboration between the OEM and the manufacturer ensures that requirements and capabilities are aligned from the outset, minimizing potential conflicts between design intent and fabrication results.
To read this entire article, which appeared in the March 2025 issue of Design007 Magazine, click here.
Suggested Items
ZESTRON Announces New Reliability and Solutions Service for Risk Assessment & Mitigation of Electronic Assemblies
05/06/2025 | ZESTRONZESTRON, the leading global provider of high-precision cleaning products, services, and training solutions, is thrilled to introduce its new Reliability and Solutions (R&S) service.
PCB East Continues to Expand
05/06/2025 | Andy Shaughnessy, Design007 MagazineIt was a perfect week for a conference and trade show in metropolitan Boston, with high temperatures in the 70s. PCB East took place at the Boxboro Regency Hotel and Conference Center April 29–May 2, with the expo on April 30. PCB East has been expanding since its relaunch a few years ago, with conference and show attendance rising each year.
Green Circuits Expands Large-Format PCBA Capabilities with Installation of JUKI Primo Screen Printer
05/05/2025 | Green CircuitsGreen Circuits, a full-service Electronics Manufacturing Services (EMS) partner to leading OEMs, proudly announces the installation of the JUKI Primo Large-Format Screen Printer, expanding its capabilities to support printed circuit board assemblies (PCBAs) up to 33.5" x 24".
ASC Sunstone Circuits to Exhibit at PCB Detroit 2025
05/05/2025 | ASC SunstoneASC Sunstone Circuits will be exhibiting at the inaugural session of PCB Detroit to be held on June 2 and 3 on the campus of Wayne State University.
HyRel Technologies Celebrates Future Innovators: Intern Program Empowers the Next Generation of Engineers and Professionals
05/01/2025 | HyRelHyRel Technologies, a global provider of quick turn semiconductor modification solutions, is proud to spotlight its 7th class of interns in partnership with Peoria Unified School District, featuring three outstanding young women who are already making meaningful contributions to the company's innovative engineering and operations efforts.