Share on:

Share on LinkedIn Share on X Share on Facebook Share with email

Testimonial

"Advertising in PCB007 Magazine has been a great way to showcase our bare board testers to the right audience. The I-Connect007 team makes the process smooth and professional. We’re proud to be featured in such a trusted publication."

Klaus Koziol - atg

Suggested Items

Jeh Aerospace Raises $11M to Boost Aircraft Supply Chain

08/12/2025 | I-Connect007 Editorial Team
Jeh Aerospace, the high-precision aerospace and defense manufacturing startup founded by Vishal Sanghavi and Venkatesh Mudragalla, has raised $11 million in a Series A round led by Elevation Capital, with support from General Catalyst, to scale its commercial aircraft supply chain manufacturing in India, according to OEM.

First Next-Gen GEO-Based Missile Warning Satellite Successfully Completes Environmental Testing, On Track for Delivery to Space Force

08/08/2025 | Lockheed Martin
The first of a new, more capable, more survivable missile warning satellite, designed by Lockheed Martin (NYSE: LMT) for today’s highly contested space domain, has successfully completed environmental testing.

New Frontier Aerospace and Air Force Institute of Technology Sign CRADA to Advance Hypersonic VTOL Aircraft

08/05/2025 | PR Newswire
New Frontier Aerospace (NFA) is excited to announce a Collaborative Research and Development Agreement (CRADA) with the Air Force Institute of Technology (AFIT) aimed at advancing an innovative rocket-powered hypersonic Vertical Takeoff and Landing (VTOL) aircraft.

Honeywell Advances Technology That Lets Fighter Pilots Breathe Easier for Peak Performance

08/04/2025 | Honeywell
Honeywell has developed and launched a new technology that allows military pilots of high-performance fighter jets to breathe easier under extreme conditions.

Boeing-Built X-37B Spaceplane Set for Eighth Mission

08/04/2025 | Boeing
The Boeing-built X-37B Orbital Test Vehicle (OTV) is preparing to launch its eighth mission (OTV-8) from Florida's Space Coast, with liftoff scheduled no earlier than August 21. This milestone comes less than six months after the successful completion of OTV-7.
Copyright © I-Connect007 | IPC Publishing Group Inc. All rights reserved. Log in