-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueSales: From Pitch to PO
From the first cold call to finally receiving that first purchase order, the July PCB007 Magazine breaks down some critical parts of the sales stack. To up your sales game, read on!
The Hole Truth: Via Integrity in an HDI World
From the drilled hole to registration across multiple sequential lamination cycles, to the quality of your copper plating, via reliability in an HDI world is becoming an ever-greater challenge. This month we look at “The Hole Truth,” from creating the “perfect” via to how you can assure via quality and reliability, the first time, every time.
In Pursuit of Perfection: Defect Reduction
For bare PCB board fabrication, defect reduction is a critical aspect of a company's bottom line profitability. In this issue, we examine how imaging, etching, and plating processes can provide information and insight into reducing defects and increasing yields.
- Articles
- Columns
- Links
- Media kit
||| MENU - pcb007 Magazine
Hunter Technology on Design Operations and Business Strategies
March 23, 2015 | Kelly Dack, I-Connect007Estimated reading time: 9 minutes
Dack: Part of the curricula in the CID program includes using standards and specifications that have been developed to allow parts and designs to be manufactured anywhere, by anybody; it's really neat to see two designers who are embedded in an EMS company, who can design. They have the answers and can design for manufacturability and are right down the hall.
Grover: That is well said. In fact, that's exactly what they said when they came back. They are very experienced designers, without question, but what they learned and came back with is knowledge of fab and assembly and industry terms and maybe even specs. In fact, they are sitting with a customer right now. When the customer found out they had passed the CID course, he said, "Now you're going to be able to tell what you can and can't do, right?" So with more knowledge comes more experience to say what we can and can't do.
Dack: Since you do design and assembly here, the missing link on site is fabrication.
Grover: It's the worst part of the whole manufacturing process. That's why we're not involved (laughs).
Dack: Tell us how it works. How do you qualify a bare board vendor?
Grover: I'm going to tell you from my perspective, because from a design service bureau mentality, we engage with customers, like I alluded to earlier. We engage with them in their current supply chain where we're going to do design help for that organization, outsource and then it goes right back into to that organization. They pick their own fab path. That's already set in stone. In other cases, we engage with the customer with an initial product and if they have no option or have no experience, we drive that selection. That's what you're referring to.
Dack: Yes.
Grover: In that case, we typically want to use a local Bay Area shop. The reason that's important is turn time. If they can drive the fab over here when it's done, the three-day turn really is three days because it can get here that third-day afternoon. So that's key.
Those organizations typically tend to be Streamline, Viasystems, TTM—those kinds of fab shops. We pick them based on the complexity of the board, the technology, and their price.
Dack: That's a good concept. It's a good topic from the standpoint of acknowledging that everything's got a tolerance. Everything has a range that we're trying to fit into. Everything has a risk. When things do screw up, how is it resolved? How does your customer or your supplier resolve it?
Chris Alessio: If there's a fab issue, we'll first try to understand what that fab issue is and then get the quality department involved and their supplier corrective action request. Then there's also mitigation, which is financial. Depending on at what point in that process we found the problem and what the root cause of that problem is, whether it's a design-related aspect or a fab-related aspect, we have arrangements with key suppliers to cover bare board costs, consequential loss type of components, and labor content. It's across-the-board.
Grover: From my perspective, though, Kelly, if somebody screws up I'm just going to use the next guy, because I have kind of free range in that environment of the front-end engineering prototype world. To Chris’s point, that's more on the production side. To be honest, really, that's the production model of Hunter. I'm kind of a rogue entity where I can pick and choose what’s best for the initial protos to get built, tested and delivered on time and free of defects.
Dack: We side-barred into what happens when things go wrong. I think we got a good answer. You audit, you check and you go through a process that doesn't lop their head off right away.
Grover: They're still in the queue, still in the AVL, but we just start using another guy. Dack: Importantly, you keep a queue or a stable of sources/fab shops, and that is very wise.
Page 2 of 3
Testimonial
"The I-Connect007 team is outstanding—kind, responsive, and a true marketing partner. Their design team created fresh, eye-catching ads, and their editorial support polished our content to let our brand shine. Thank you all! "
Sweeney Ng - CEE PCBSuggested Items
Curtiss-Wright Signs Strategic Partnership With Rolls-Royce SMR for Its Small Modular Reactor Technology
08/04/2025 | BUSINESS WIRECurtiss-Wright Corporation announced that its UK-based Curtiss-Wright Nuclear business (formerly Ultra Energy) signed a multi-million dollar strategic partnership with Rolls-Royce SMR to deliver critical safety systems for its Small Modular Reactor (SMR) technology. Under the contract, Curtiss-Wright will provide design, qualification, testing and supply of the non-programmable diverse Reactor Protection Systems for a global fleet of Rolls-Royce SMRs.
Brent Laufenberg Appointed CIO of the Global Electronics Association, Advancing Technology and Member Services
07/31/2025 | Global Electronics AssociationThe Global Electronics Association (formerly IPC International Inc.) announces the appointment of Brent Laufenberg as its new Chief Information Officer (CIO).
Microchip Enters into Partnership Agreement with Delta Electronics on Silicon Carbide Solutions
07/18/2025 | Globe NewswireThe growth of artificial intelligence (AI) and the electrification of everything are driving an ever-increasing demand for higher levels of power efficiency and reliability.
ViTrox’s HITS 5.0 Empowers Global Partners with Innovative Solutions and Stronger Bonds
07/16/2025 | ViTroxViTrox, strives to be the World’s Most Trusted Technology Company, proudly announces the successful conclusion of its fifth edition of High Impact Training for Sales (HITS 5.0), held from 23rd to 27th June 2025 at ViTrox Campus 2.0 and 3.0, located in Batu Kawan Industrial Park, Penang, Malaysia.
Global Citizenship: The Global Push for Digital Inclusion
07/16/2025 | Tom Yang -- Column: Global CitizenshipIt can be too easy to take the technology at our fingertips for granted: high-speed internet, cloud-based collaboration, and instant video calls across continents. Yet, for billions of people, access to these digital tools is a distant dream. As a global community, we must ensure that technology is available to all. Here is how technology is bridging physical, economic, and educational gaps in underserved regions and profoundly reshaping lives.