-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueSpotlight on India
We invite you on a virtual tour of India’s thriving ecosystem, guided by the Global Electronics Association’s India office staff, who share their insights into the region’s growth and opportunities.
Supply Chain Strategies
A successful brand is built on strong customer relationships—anchored by a well-orchestrated supply chain at its core. This month, we look at how managing your supply chain directly influences customer perception.
What's Your Sweet Spot?
Are you in a niche that’s growing or shrinking? Is it time to reassess and refocus? We spotlight companies thriving by redefining or reinforcing their niche. What are their insights?
- Articles
- Columns
- Links
- Media kit
||| MENU - smt007 Magazine
Collaboration between OEM and EMS to Combat Head-on-Pillowing Defects (Part 2)
August 28, 2015 | I-Connect007Estimated reading time: 2 minutes

By Alex Chan, Paul Brown and Richard Coyle, Alcatel-Lucent; Lars Bruno, Anne-Kathrine Knoph, Ericsson; Thilo Sack, Celestica Inc.; David Geiger, David Mendez and Ron Kulterman, Flextronics International; Mulugeta Abtew, Iulia Muntele, Sanmina Corp; Kirk VanDreel, Plexus Corp.
There have been many publications, industry workshops, and symposia that describe process mitigation techniques for minimizing the occurrence of head-on-pillow (HoP) defects during surface mount assembly. These include inspection effectiveness as covered in Part 1 of this two-paper set. This second paper addresses the root cause of the HoP defect—specifically the link between HoP defects and component warpage. Multiple case studies contributed by the participating companies are presented to support the proposal that the current industry warpage standard needs to be revised and to demonstrate that further work is needed by the industry to understand the root cause of this defect better. Based on the data from the case studies, the authors propose revised acceptance criteria that set the maximum warpage at 0.090 mm (3.5 mil) for BGA of 0.8 mm pitch and above.
Introduction
Head-on-pillow (HoP), head-in-pillow (HiP), head-and-pillow (HnP); regardless of what you call it, it is a defect that is growing in prevalence. HoP is particularly problematic because the intimate contact between ball and paste can easily escape current x-ray inspection processes and, in many instances, adequate electrical continuity exists to pass initial electrical testing. Eventual separation of what was never a proper metallurgical bond can lead to late stage manufacturing defects and even early stage field return issues.
Significant effort has been invested in the study of HoP. As a result, the defect mechanism and its contributing factors have been substantially described in the literature. There is wide recognition that package warpage is a primary factor in the formation of HoP. In fact, progress to help characterize factors influencing package warpage behavior in an attempt to define mitigation measures. These include the iNEMI Package Warpage Qualification Criteria and the HDPUG FCBGA Package Warpage projects.
As discussed in Part 1 of this paper, the authors worked on a number of mitigation practices to minimize HoP defects on product. However, it also sparked interest from the different participating OEM and EMS companies to discuss the need to address the root cause of HoP in the industry. It is the belief of the authors that there are a number of factors that lead to the formation of the HoP defect, but package warpage during reflow is viewed as the most significant contributor.
In this paper, a number of real product examples collected by different participating members will be presented. Current industry specifications governing package warpage will be reviewed and recommendations for revised process warpage criteria for BGA packages with a pitch of 0.8 mm and above will be made.
Editor's Note: This article originally appeared in the August 2015 issue of SMT Magazine.
Testimonial
"The I-Connect007 team is outstanding—kind, responsive, and a true marketing partner. Their design team created fresh, eye-catching ads, and their editorial support polished our content to let our brand shine. Thank you all! "
Sweeney Ng - CEE PCBSuggested Items
Altus Group Introduces the ASSCON VP 2200 for High-Performance PCB Assembly
09/10/2025 | Altus GroupAltus Group, a leading distributor of capital equipment in the UK and Ireland, is now offering the ASSCON VP 2200 vapour phase reflow system, the first dual-lane inline VP unit available in the region.
Pick and Place Machine Innovator - NECTEC Launches Next-Gen SMT Line Solution With LED and X-ray Technology
08/26/2025 | Globe NewswireNECTEC PTE. LTD., a leading provider of SMT electronics manufacturing equipment, announced the official launch of its next-generation SMT solutions, featuring newly upgraded pick and place machine, specialized LED pick and place machines, enhanced Reflow Oven technology, advanced X-ray Inspection, high-speed X-ray Counter, and premium Solder Paste
BTU International to Feature Aurora Reflow Technology at SMTA Michigan and Ohio Expos
08/15/2025 | BTU International, Inc.BTU International, Inc., a leading supplier of advanced thermal processing equipment for the electronics manufacturing market, will exhibit at the upcoming SMTA Michigan Expo & Tech Forum on Tuesday, August 19 in Livonia, MI, and the SMTA Ohio Expo & Tech Forum on Thursday, August 21 in Independence, OH.
FlashPCB Enhances SMT Production Line with Heller 1809 Reflow Oven and KIC ProBot
07/31/2025 | FlashPCBFlashPCB, a leading provider of quick-turn PCB assembly, has expanded its surface mount production capabilities with the installation of a Heller 1809 MKII reflow oven paired with the KIC ProBot automatic profiling system. This addition supports FlashPCB’s goal of achieving faster throughput, higher quality assurance, and consistent process control across a wide range of PCB builds.
Silicon Mountain Contract Services Enhances SMT Capabilities with New HELLER Reflow Oven
07/17/2025 | Silicon Mountain Contract ServicesSilicon Mountain Contract Services, a leading provider of custom electronics manufacturing solutions, is proud to announce a significant upgrade to its SMT production capability with the addition of a HELLER 2043 MK5 10‑zone reflow oven to its Nampa facility.