U.S. Navy Awards General Dynamics $322M for Nuclear-Submarine Support Work
September 17, 2015 | General DynamicsEstimated reading time: 1 minute

The U.S. Navy has awarded a $321.7 million contract option to General Dynamics Electric Boat to provide planning yard work, engineering and technical support for nuclear submarines. Electric Boat is a wholly owned subsidiary of General Dynamics.
Under this option, Electric Boat will provide design, engineering, material and logistics support, and research and development activities for active U.S. submarines and submersibles. Electric Boat also will provide information services, planning, scheduling and technical support for submarine maintenance and modernization activities, training and facility support, and affordability/cost reduction support.
The contract will be worth approximately $1.5 billion over five years if all options are exercised and funded.
This work will engage Electric Boat's engineering and design organization, which comprises more than 4,400 employees. Possessing proven technical capabilities, these employees work on all facets of the submarine life cycle from concept formulation and design through construction, maintenance and modernization, and eventually to inactivation and disposal.
Electric Boat has established standards of excellence in the design, construction and life-cycle support of U.S. Navy submarines. In its position as an industry leader, Electric Boat remains committed to advancing its technical strengths, while providing the business expertise to effectively manage the challenges of nuclear-submarine production. The company's primary locations are in Groton, Conn., New London, Conn., and Quonset Point, R.I. Its current workforce is approximately 14,000 employees.
Testimonial
"In a year when every marketing dollar mattered, I chose to keep I-Connect007 in our 2025 plan. Their commitment to high-quality, insightful content aligns with Koh Young’s values and helps readers navigate a changing industry. "
Brent Fischthal - Koh YoungSuggested Items
Analog Devices Launches ADI Power Studio™ and New Web-Based Tools
10/14/2025 | Analog Devices, Inc.Analog Devices, Inc., a global semiconductor leader, announced the launch of ADI Power Studio, a comprehensive family of products that offers advanced modeling, component recommendations and efficiency analysis with simulation. In addition, ADI is introducing early versions of two new web-based tools with a modernized user experience under the Power Studio umbrella:
Cadence Giving Foundation Announces Multi-Year Commitment to Expand the AI Hub at San José State University
10/13/2025 | Cadence Design Systems, Inc.The Cadence Giving Foundation today announced a multi-year commitment to expand the AI Hub at San José State University (SJSU) to equip students with the skills, hands-on training and experience needed to excel in careers in artificial intelligence (AI).
NEDME Returns October 22 — The Northwest’s Premier Design & Manufacturing Expo
10/13/2025 | NEDMEThe Northwest Electronics Design & Manufacturing Expo (NEDME) returns on Wednesday, October 22, 2025, at Wingspan Event & Conference Center, Hillsboro. The event brings together engineers, product designers, manufacturers, educators, and community partners for a full day of industry connection, learning, and networking.
Sumitomo Riko Boosts Automotive Design Efficiency 10x with Ansys AI Simulation Technology
10/13/2025 | SynopsysSumitomo Riko is implementing Ansys, part of Synopsys, Inc. AI technology to accelerate time-to-solution and improve efficiency during the design and manufacturing of automotive components.
Beyond the Board: Early Engagement Means Faster Prototyping for Defense Programs
10/14/2025 | Jesse Vaughan -- Column: Beyond the BoardIn the defense electronics sector, speed-to-market has shifted from being a commercial differentiator to a national security imperative. The ability to move from design concept to deployable system in months rather than years can provide the U.S. with important strategic advantages. Prototyping, once regarded as a costly and optional stage, has become the linchpin for accelerating program schedules while safeguarding performance, compliance, and mission reliability.