-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueSpotlight on India
We invite you on a virtual tour of India’s thriving ecosystem, guided by the Global Electronics Association’s India office staff, who share their insights into the region’s growth and opportunities.
Supply Chain Strategies
A successful brand is built on strong customer relationships—anchored by a well-orchestrated supply chain at its core. This month, we look at how managing your supply chain directly influences customer perception.
What's Your Sweet Spot?
Are you in a niche that’s growing or shrinking? Is it time to reassess and refocus? We spotlight companies thriving by redefining or reinforcing their niche. What are their insights?
- Articles
- Columns
- Links
- Media kit
||| MENU - smt007 Magazine
Cycle Time Reduction with WORK, Part I
October 27, 2015 | Steve Williams, The Right Approach Consulting LLCEstimated reading time: 1 minute

Summary
Lean, theory of constraints (ToC), quick response manufacturing (QRM), cross training, and SPC are powerful, tried and true methodologies for process improvement. However, these tools are rooted in high-volume manufacturing environments and don't always play nice in a high-mix, low-volume (HMLV) operation. The new WORK manufacturing strategy was specifically developed to overcome these shortcomings while capitalizing on their strengths.
Limitations of the Current Toolset
Lean
Lean is a collection of tools and methods designed to eliminate waste, reduce delays, improve performance and reduce costs. Lean focuses on eliminating non-value-added activities, as opposed to more traditional improvement efforts, which focus on reducing the time in value-added steps. The problem with lean is that many of the tools work best in a high-volume process that has very little variation in product mix.
TOC
ToC is a methodology that focuses on removing bottlenecks from a process through a series of five steps:
1. Identify the constraint
2. Exploit (improve) the constraint
3. Subordinate (align all activities)
4. Elevate (additional actions)
5. Repeat
The problem with ToC is that, by definition, eliminating one bottleneck creates another, and in a high-mix process the bottlenecks can change with the mix.
Quick Response Manufacturing
Quick response manufacturing (QRM), a cell-based strategy closely related to focus factories that was developed specifically for HMLV, has been gaining popularity over the past few years. The problem with QRM is that it works best when equipment sets from a number of sequential departments can be physically organized into small cells. This becomes problematic in operations that have processes requiring capital intensive environments like plating, clean room imaging, etc., where setting up a single machine in a cell is prohibitive.
Editor's Note: This article originally appeared in the October 2015 issue of SMT Magazine.
Testimonial
"We’re proud to call I-Connect007 a trusted partner. Their innovative approach and industry insight made our podcast collaboration a success by connecting us with the right audience and delivering real results."
Julia McCaffrey - NCAB GroupSuggested Items
Supply Chain in the 21st Century
07/28/2015 | Steve Williams, The Right Approach Consulting LLCThe shift away from vertical integration has pushed the topic of supply chain management to the forefront of strategic planning for many manufacturers. This wide-ranging article talks about supply chain management, a brief history of supply chain innovation, managing supply chain risk, as well as presents the "7 Rights" of supply chain management.