-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueDo You Have X-ray Vision?
Has X-ray’s time finally come in electronics manufacturing? Join us in this issue of SMT007 Magazine, where we answer this question and others to bring more efficiency to your bottom line.
IPC APEX EXPO 2025: A Preview
It’s that time again. If you’re going to Anaheim for IPC APEX EXPO 2025, we’ll see you there. In the meantime, consider this issue of SMT007 Magazine to be your golden ticket to planning the show.
Technical Resources
Key industry organizations–all with knowledge sharing as a part of their mission–share their technical repositories in this issue of SMT007 Magazine. Where can you find information critical to your work? Odds are, right here.
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - smt007 Magazine
Saline Lectronics Improves High-volume Assembly Management
January 29, 2016 | Saline LectronicsEstimated reading time: 1 minute

Saline Lectronics Inc., a leading electronics contract manufacturer, recently purchased a StorageSolutions Fortress (ISM2000XL) from Juki. The EMS provider will now have two Fortress units in the plant, allowing for improved material management used on high-volume assemblies. Combined, the two towers will work in sync as one large, contained, humidity controlled inventory management system.
Lectronics' two Fortresses will store all of the necessary material to run high-volume assemblies that the company manufactures regularly. Rather than having to locate material within a stock room and manually pick the necessary reels for the job, Lectronics' technicians will now have the capability to automatically dispense all of the material needed to run an assembly at the push of a single button.
Lectronics will gain huge time savings by reducing the time spent trying to locate parts as well as quality improvements, due to the Towers always dispensing the correct reels. With the Towers, there is no longer the risk of any human-error selecting the incorrect part.
Since the two Fortresses communicate directly to the Juki SMT lines, when a reel starts to run low on a line and the low-level alarm goes off, these towers will automatically dispense the replacement reel.
"The implementation of our second Fortress is very consistent with our manufacturing strategy of improving efficiency and having tighter control on our high-volume inventory," said Scott Sober, VP of Operations. "Additionally, this two-tower system enables us to better utilize the technology and data stored within our intelligent machines that are linked factory-wide."
Suggested Items
JAS Presents Bingham Brokken and Representative of the Year Awards to G2
11/06/2015 | Juki Automation Systems (JAS), Inc.Juki Automation Systems awarded G2 Manufacturing the "Representative of the Year – Highest Performance" award for 2015. John Gilby, president and founder of G2 Manufacturing, was also selected for the Bingham Brokken Memorial Award for 'Most Enthusiastic Representative of the Year 2015'.
Juki Expands Operations in Brazil
10/05/2015 | JUKIJuki is expanding its product line offerings, demo facilities, applications engineering team and service team in Brazil, to meet growing goals in this important market.