Sikorsky Awarded Navy Contract to Build Six More CH-53K Heavy Lift Helicopters
October 30, 2020 | PR NewswireEstimated reading time: 2 minutes
Sikorsky, a Lockheed Martin company will build six additional production CH-53K King Stallion helicopters under a new contract for the U.S. Navy. The aircraft will further support the U.S. Marine Corps in its mission to conduct expeditionary heavy-lift assault transport of armored vehicles, equipment and personnel to support distributed operations deep inland from a sea-based center of operations.
The six helicopters are part of 200 aircraft Program of Record for the U.S. Marine Corps, and their addition makes a total of 24 CH-53K production aircraft now under contract. Under the terms of this most recent contract – known as Low Rate Initial Production (LRIP) Lot 4 – Sikorsky will begin deliveries of the six aircraft in January 2024.
"This contract award is a testament to the government's confidence in the CH-53K platform. This award shows that we are working hard to make the aircraft more affordable," said Major General Greg Masiello, program executive office, air ASW, assault and special mission programs. "The capability and affordability of the CH-53K is important to ensure that we provide a valuable addition to the United States Marine Corps and our friends and allies."
King Stallion Production Marches Ahead
The CH-53K program has five aircraft on the line at Sikorsky facilities in Connecticut and over two dozen in various stages of production. The program will deliver the first low rate initial production aircraft in September 2021.
Sikorsky and its suppliers have made significant investments in facilities, machinery, tooling, and workforce training to ramp up production required for the CH-53K program. For example, for the first time, newly installed 10-ton cranes lifted a 12,000 lb. gearbox into a CH-53K production aircraft.
"The production of this CH-53K helicopter represents a new era in capabilities, technologies, safety and mission flexibility for the U.S. Marine Corps. Sikorsky is committed to supporting the Marine Corps to maximize the benefits of this all new helicopter," said Bill Falk, Sikorsky CH-53K program director.
"Pilots are already training on state-of-the art flight training devices to prepare in a safe, cost-effective manner for operational deployment," Falk said.
CH-53K Proving Capabilities
The CH-53K is also nearing the conclusion of the developmental flight test events in preparation for Initial Operational Test & Evaluation (IOT&E), having flown more than 2,000 flight hours validating the aircraft's performance on a ship and in both hot and cold environments. This year, the aircraft completed:
- Air-to-air refueling with an external load
- Initial sea trials
- Flight tests in extremely hot and dusty conditions at U.S. Army Yuma Proving Ground in Yuma, Arizona
Other accomplishments include:
- Maximum weight single-point cargo hook sling load of 36,000 pounds (16,329 kilograms)
- Forward flight speed of over 150 knots
- 60-degree angle-of-bank turns
- Altitude of 18,500 feet mean sea level (MSL)
- 12-degree slope landings and takeoffs
- External load auto-jettison
- Gunfire testing
Testimonial
"We’re proud to call I-Connect007 a trusted partner. Their innovative approach and industry insight made our podcast collaboration a success by connecting us with the right audience and delivering real results."
Julia McCaffrey - NCAB GroupSuggested Items
ASMPT Enhances WORKS Monitoring to Boost SMT Production Transparency and Accuracy
04/15/2026 | ASMPTASMPT SMT Solutions, the technology and market leader in integrated hardware and software solutions for electronics manufacturing, presents a new version of WORKS Monitoring.
Inside Eastek Malaysia: Scalable Manufacturing Built on Trust, Stability, and Technical Expertise
04/14/2026 | Eastek International CorporationEastek International Corporation continues to strengthen its global manufacturing platform through the sustained performance and expanding capabilities of its Malaysia operation.
New EIPC President: Building Strength Through Unity in Europe’s Electronics Industry
04/14/2026 | Marcy LaRont, I-Connect007Industry veteran Rico Schluter, newly appointed president of EIPC, discusses his decades-long journey through the European PCB industry and his vision for its future. From building advanced manufacturing operations to leading large-scale facility development in Lithuania, Rico shares insights into automation, workforce evolution, and the challenges of scaling production. He emphasizes the urgent need for stronger collaboration across European industry organizations to effectively influence policy in Brussels, particularly around supply chain resilience, trade regulations, and energy-related incentives.
Future-proof Laser Depaneling for PCBs with Photonics
04/10/2026 | Real Time with... APEX EXPOBill Solari of Photonics Systems USA outlines the advantages of laser depaneling for circuit board manufacturing. We learn that this advanced technology addresses rising material costs by increasing panel yield and improving edge quality. This process provides precision, suitability for medical applications, and cost-saving benefits, including the elimination of cleaning steps. There have been significant advancements in laser depaneling, offering a competitive and efficient solution for modern electronics production.
ASC Sunstone Circuits Implements Smart Parts Technology at Mulino Facility to Enhance PCB Manufacturing Efficiency
04/09/2026 | ASC Sunstone CircuitsASC Sunstone Circuits, a division of American Standard Circuits, has implemented Smart PartsTM Classics technology at its Mulino, Oregon, manufacturing facility, advancing its commitment to efficient, high-quality PCB fabrication.