This month, our contributors discuss the PCB design classes available at IPC APEX EXPO 2024. As they explain, these courses cover everything from the basics of design through avoiding over-constraining high-speed boards, and so much more!
Opportunities and Challenges
In this issue, our expert contributors discuss the many opportunities and challenges in the PCB design community, and what can be done to grow the numbers of PCB designers—and design instructors.
Embedded Design Techniques
Our expert contributors provide the knowledge this month that designers need to be aware of to make intelligent, educated decisions about embedded design. Many design and manufacturing hurdles can trip up designers who are new to this technology.
- Articles
- Columns
Search Console
- Links
- Events
||| MENU - design007 Magazine
Book Excerpt: 'The Printed Circuit Designer's Guide to... Manufacturing Driven Design,' Chapter 2
August 23, 2023 | I-Connect007 Editorial TeamEstimated reading time: 2 minutes
Excerpt from: The Printed Circuit Designer's Guide to... Manufacturing Driven Design, Chapter 2: Why a Change is Needed
Contemporary Complexity
In a recent survey on the increasing complexity of electronics design, it was reported that 68% of companies were facing increasing pressure to miniaturize their electronics form factors. This report mirrors global trends seen within the industry. It represents an increased burden placed upon the printed circuit board designer to put more functionality into a smaller space, and on the manufacturer to produce with a smaller margin of error.
This report highlights the interconnectedness of these complexity trends. The study also showed 68% of respondents are facing increasing pressure to bring the cost of their electronic products down, with 75% acknowledging the increasing challenge these factors brought to the manufacturing process. In line with quality initiatives, 74% identified the pressure on reliability of the products to also be increasing.
One of the questions I ask virtually every designer is, “How often do you get Technical Queries (TQs) from your suppliers related to a design you sent them?” I find the answer is almost always between 50% and 100% of the time. The good news is that most fabrication and contract manufacturing partners likely have a DFM software solution in place to validate designs before they are committed to manufacturing.The downside is your organization is dependent upon them to look out for your interests, and this typically adds a one- to two-week delay from submission before you even begin receiving TQs from them.
Such communication is often iterative and reported to be the single largest bottleneck encounter between design and manufacturing. There are times when the fabricators find it necessary to make radical changes, which requires extensive communication, adding yet another dimension to the TQ recipient. If it is the subject matter expert for the design, then the TQ is frequently mitigated for that design, meaning that same occurrence will likely occur yet again on other designs. Manufacturing experts need to be involved in addressing the occurrence of the TQ to reduce the likelihood of the reoccurrence.
Your supplier is naturally limited in their ability to perform this DFM. They don’t know what a board does and have no context for the design decisions that went into creating that function. Manufacturers naturally lack the design intent driven by your organization and, as such, may not be able to catch every issue within a design. As a general rule, manufacturers build to print. They are responsible for realizing the design given, not ensuring that the design works as intended.
Suggested Items
Connect the Dots: Designing for Reality—The Pre-Manufacturing Process
05/08/2024 | Matt Stevenson -- Column: Connect the DotsI have been working with Nolan Johnson on a podcast series about designing PCBs for the reality of manufacturing. By sharing lessons learned over a long career in the PCB industry, we hope to shorten learning curves and help designers produce better boards with less hassle and rework. Episode 2 deals with the electronic pre-manufacturing process. Moving from CAD (computer-aided design) to CAM (computer-aided manufacturing) is a key step in PCB manufacturing. CAM turns digital designs into instructions that machines can use to actually build the PCB.
All Flex Solutions Hires Mike Madetzke as Manager of R&D
05/08/2024 | All Flex SolutionsAll Flex Solutions is very pleased to announce that Mike Madetzke has joined their team as their new Manager of Research and Development.
Shane Whiteside of Summit Reflects on Today's PCB Landscape
05/08/2024 | I-Connect007 Editorial TeamSummit Interconnect began as a printed circuit board manufacturing company just eight years ago and has seen impressive growth organically and through acquisition. Summit President and CEO Shane Whiteside takes a few moments to share his thoughts on the growing PCB industry in the United States.
America Projected to Triple Semiconductor Manufacturing Capacity by 2032, the Largest Rate of Growth in the World
05/08/2024 | SIAThe Semiconductor Industry Association (SIA), in partnership with the Boston Consulting Group (BCG), released a report on the global chip supply chain that projects the United States will triple its domestic semiconductor manufacturing capacity from 2022—when the CHIPS and Science Act (CHIPS) was enacted—to 2032.
Coherix Partners with EMU on 'Factory of the Future' Technology Program
05/08/2024 | PRNewswireMichigan-based Coherix is working with Eastern Michigan University (EMU) in Ypsilanti to develop "factory-of-the-future" manufacturing and assembly technology.