NASA Seeks US Partners to Develop Reusable Systems to Land Astronauts on Moon
March 14, 2019 | NASAEstimated reading time: 2 minutes
As the next major step to return astronauts to the Moon under Space Policy Directive-1, NASA announced plans on December 13 to work with American companies to design and develop new reusable systems for astronauts to land on the lunar surface. The agency is planning to test new human-class landers on the Moon beginning in 2024, with the goal of sending crew to the surface in 2028.
Through multi-phased lunar exploration partnerships, NASA is asking American companies to study the best approach to landing astronauts on the Moon and start the development as quickly as possible with current and future anticipated technologies.
“Building on our model in low-Earth orbit, we’ll expand our partnerships with industry and other nations to explore the Moon and advance our missions to farther destinations such as Mars, with America leading the way,” said NASA Administrator Jim Bridenstine. “When we send astronauts to the surface of the Moon in the next decade, it will be in a sustainable fashion.”
The agency’s leading approach to sending humans to the Moon is using a system of three separate elements that will provide transfer, landing, and safe return. A key aspect of this proposed approach is to use the Gateway for roundtrip journeys to and from the surface of the Moon.
Using the Gateway to land astronauts on the Moon allows the first building blocks for fully reusable lunar landers. Initially NASA expects two of the lander elements to be reusable and refueled by cargo ships carrying fuel from Earth to the Gateway. The agency is also working on technologies to make rocket propellants using water ice and regolith from the Moon. Once the ability to harness resources from the Moon for propellant becomes viable, NASA plans to refuel these elements with the Moon’s own resources. This process, known as in-situ resource utilization or ISRU, will make the third element also refuelable and reusable.
NASA published a formal request for proposals to an appendix of the second Next Space Technologies for Exploration Partnerships (NextSTEP-2) Broad Agency Announcement (BAA) on Feb. 7, and responses are due March 25.
According to the solicitation, NASA will fund industry-led development and flight demonstrations of lunar landers built for astronauts by supporting critical studies and risk reduction activities to advance technology requirements, tailor applicable standards, develop technology, and perform initial demonstrations by landing on the Moon.
When NASA again sends humans to the Moon, the surface will be buzzing with new research and robotic activity, and there will be more opportunities for discovery than ever before. Private sector innovation is key to these NASA missions, and the NextSTEP public-private partnership model is advancing capabilities for human spaceflight while stimulating commercial activities in space.
The President’s direction from Space Policy Directive-1 galvanizes NASA’s return to the Moon and builds on progress on the Space Launch System rocket and Orion spacecraft, efforts with commercial and international partners, and knowledge gained from current robotic presence at the Moon and Mars.
Suggested Items
Raytheon-Kongsberg System is Proving Itself – In Demos and In Combat
05/16/2024 | Raytheon TechnologiesOn a rocky island off the coast of Norway, Michael Sadlowski watched as a surface-to-air missile launcher pointed up into a dark nighttime sky.
ispace EUROPE, CDS Sign Payload Service Agreement to Transport Precise Location Measurement Technology to the Moon
05/14/2024 | BUSINESS WIREispace EUROPE S.A., the Luxembourg-based subsidiary of ispace, inc., and Control Data Systems SRL (CDS) have signed a payload services agreement to transport precise location measurement equipment to the Moon, the two companies announced.
RTX Introduces the Collins Airport Surface Awareness System
05/10/2024 | RTXCollins Aerospace, an RTX business, introduces Collins’ Airport Surface Awareness System for real-time tracking, monitoring, and recording of both aircraft and ground support equipment at airports.
MKS’ Atotech to Participate in ECTC
05/10/2024 | MKS’ AtotechAt this year’s 74th IEEE Electronic Components and Technology Conference (ECTC), MKS’ Atotech will present and demonstrate its latest product and service innovations.
Real Time with… IPC APEX EXPO 2024: Exploring the Future of Surface Finishes
04/25/2024 | Real Time with...IPC APEX EXPOJoe McGurran, product marketing director for MKS Atotech, looks into the future of surface finishes, discussing less nickel, reduced thickness, technologies influencing HDI and UHDI, and the benefits of nickel-free surface finishes. He also touches on popular finishes like ENIG and palladium immersion gold and discusses the value proposition of making a change.