- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueWhat's Your Sweet Spot?
Are you in a niche that’s growing or shrinking? Is it time to reassess and refocus? We spotlight companies thriving by redefining or reinforcing their niche. What are their insights?
Moving Forward With Confidence
In this issue, we focus on sales and quoting, workforce training, new IPC leadership in the U.S. and Canada, the effects of tariffs, CFX standards, and much more—all designed to provide perspective as you move through the cloud bank of today's shifting economic market.
Intelligent Test and Inspection
Are you ready to explore the cutting-edge advancements shaping the electronics manufacturing industry? The May 2025 issue of SMT007 Magazine is packed with insights, innovations, and expert perspectives that you won’t want to miss.
- Articles
- Columns
- Links
- Media kit
||| MENU - smt007 Magazine
Five Key Components of an NPI Report
May 16, 2019 | Neil Sharp, JJS ManufacturingEstimated reading time: 3 minutes

Taking a new product from initial design through to final production requires care and attention at every step of the process. Thus, it's vital to entrust your new product introduction (NPI) to a contract manufacturer that has the right methodology.
A “new product” is any product or product variant that your electronics manufacturing services (EMS) provider hasn’t built for you before. It may be an item that’s still at the prototype stage, an up-issue to an existing design, or a product that has already been outsourced but that you’ve chosen to transfer to a new assembly partner.
If you’ve opted to hand over this process to an EMS provider, then you must verify their NPI procedures before work begins. Every assembly partner is different and likely to have their own unique approach to how they see through the creation of new products within their own manufacturing environment. However, one of the critical elements for success is the provision of an NPI report, which will accompany the delivery of your first batch of assemblies.
An NPI report is an opportunity for your contract manufacturer to highlight any outstanding issues that will need to be addressed for future builds. And the information that your EMS partner provides can play a pivotal role in ensuring that they continue to deliver your products on time, within budget, and to the highest quality standards.
So, what exactly should an NPI report look like? Here are five key components.
1. Basic Details of the Build
An NPI report should begin by providing a written record of the crucial details of the job. This will include the following:
- The product name and date of manufacture
- An overview of the product accompanied by pictures and a brief description
- A list of all the subassembly part numbers and revisions
- A compilation of the drawings, information, and data used during the build
- The Restriction of Hazardous Substances (RoHS) status of the project
- A description of any applicable build or quality standards
2. How the Product Was Built
This aspect of the NPI report should describe the processes the product went through, including the equipment that was used and a description of any special tooling. While an overview may be all that’s required, your EMS partner may choose to provide more detail, which will be helpful in avoiding or resolving any future problems.
3. Internal Feedback and Observations
This element provides a candid summary of fundamental observations of each stage of the NPI process from procurement of materials to assembly, test, inspection, and packaging. Inviting internal feedback at each stage provides a valuable opportunity for everyone involved in the build to contribute their comments, suggestions, or concerns. It can also be hugely useful as a checklist to refer to if any issues arise later on.
4. Suggestions for Improvement
Wherever possible, an NPI report should describe and justify any recommendations that will improve any element of the product or processes. These might include amendments to the supply of materials or the manufacturing process, changes to documentation, or even tweaks to the product design itself.
5. What Needs to Happen Next
The final stage of the report should provide a brief summary of what action needs to be taken, who’s accountable for which tasks, and the deadline for completion. Making sure that everyone understands their roles and responsibilities will be vital in eliminating errors and ensuring the success of future builds. Any product or product variant that’s being built for the first time needs to be put through a robust NPI process to ensure that future production volumes can be efficiently achieved.
Working with an EMS partner who understands the unique requirements of each key step of the NPI process will ensure a product that launches on time, stays within budget, and meets (or exceeds) your quality and service expectations.
Neil Sharp is the director of marketing for JJS Manufacturing.
Suggested Items
Hon Hai Education Foundation Continues to Promote Quantum Education
07/04/2025 | FoxconnHon Hai Education Foundation has long been committed to promoting forward-looking technology education in Taiwan's high schools, and held the "High School Quantum Teacher Training Camp" in Tainan City on July 1.
Incap UK Achieves JOSCAR Zero Accreditation
07/04/2025 | IncapIncap Electronics UK has been accredited under JOSCAR Zero, a new sustainability-focused extension of the defence and aerospace sector’s supplier assurance system.
Kitron Secures Contract for Components Supporting Unmanned Aerial Systems
07/04/2025 | KitronKitron has received a contract with an estimated value between EUR 4 and 8 million for the production and supply of advanced electronic components used in unmanned aerial systems (UAS).
NOTE Receives Order Worth 132 MSEK and Expands Collaboration with Customer within Security & Defense
07/04/2025 | NOTENOTE has received an order worth SEK 132 million from one of its existing customers operating within Security & Defense. NOTE thereby strengthens its long-term collaboration with the industry-leading customer.
Delta SEA Partner Event 2025 Unites Regional Partners to Embrace a “Future Ready” Vision
07/03/2025 | Delta ElectronicsDelta Electronics (Thailand) Public Company Limited, successfully hosted its Delta SEA Partner Event 2025: Future Ready at Delta Chungli Plant 5, Taiwan on June 10 – 11 , 2025.