-
- News
- Books
Featured Books
- smt007 Magazine
Latest Issues
Current IssueProduction Software Integration
EMS companies need advanced software systems to thrive and compete. But these systems require significant effort to integrate and deploy. What is the reality, and how can we make it easier for everyone?
Spotlight on India
We invite you on a virtual tour of India’s thriving ecosystem, guided by the Global Electronics Association’s India office staff, who share their insights into the region’s growth and opportunities.
Supply Chain Strategies
A successful brand is built on strong customer relationships—anchored by a well-orchestrated supply chain at its core. This month, we look at how managing your supply chain directly influences customer perception.
- Articles
- Columns
- Links
- Media kit
||| MENU - smt007 Magazine
Five Key Components of an NPI Report
May 16, 2019 | Neil Sharp, JJS ManufacturingEstimated reading time: 3 minutes

Taking a new product from initial design through to final production requires care and attention at every step of the process. Thus, it's vital to entrust your new product introduction (NPI) to a contract manufacturer that has the right methodology.
A “new product” is any product or product variant that your electronics manufacturing services (EMS) provider hasn’t built for you before. It may be an item that’s still at the prototype stage, an up-issue to an existing design, or a product that has already been outsourced but that you’ve chosen to transfer to a new assembly partner.
If you’ve opted to hand over this process to an EMS provider, then you must verify their NPI procedures before work begins. Every assembly partner is different and likely to have their own unique approach to how they see through the creation of new products within their own manufacturing environment. However, one of the critical elements for success is the provision of an NPI report, which will accompany the delivery of your first batch of assemblies.
An NPI report is an opportunity for your contract manufacturer to highlight any outstanding issues that will need to be addressed for future builds. And the information that your EMS partner provides can play a pivotal role in ensuring that they continue to deliver your products on time, within budget, and to the highest quality standards.
So, what exactly should an NPI report look like? Here are five key components.
1. Basic Details of the Build
An NPI report should begin by providing a written record of the crucial details of the job. This will include the following:
- The product name and date of manufacture
- An overview of the product accompanied by pictures and a brief description
- A list of all the subassembly part numbers and revisions
- A compilation of the drawings, information, and data used during the build
- The Restriction of Hazardous Substances (RoHS) status of the project
- A description of any applicable build or quality standards
2. How the Product Was Built
This aspect of the NPI report should describe the processes the product went through, including the equipment that was used and a description of any special tooling. While an overview may be all that’s required, your EMS partner may choose to provide more detail, which will be helpful in avoiding or resolving any future problems.
3. Internal Feedback and Observations
This element provides a candid summary of fundamental observations of each stage of the NPI process from procurement of materials to assembly, test, inspection, and packaging. Inviting internal feedback at each stage provides a valuable opportunity for everyone involved in the build to contribute their comments, suggestions, or concerns. It can also be hugely useful as a checklist to refer to if any issues arise later on.
4. Suggestions for Improvement
Wherever possible, an NPI report should describe and justify any recommendations that will improve any element of the product or processes. These might include amendments to the supply of materials or the manufacturing process, changes to documentation, or even tweaks to the product design itself.
5. What Needs to Happen Next
The final stage of the report should provide a brief summary of what action needs to be taken, who’s accountable for which tasks, and the deadline for completion. Making sure that everyone understands their roles and responsibilities will be vital in eliminating errors and ensuring the success of future builds. Any product or product variant that’s being built for the first time needs to be put through a robust NPI process to ensure that future production volumes can be efficiently achieved.
Working with an EMS partner who understands the unique requirements of each key step of the NPI process will ensure a product that launches on time, stays within budget, and meets (or exceeds) your quality and service expectations.
Neil Sharp is the director of marketing for JJS Manufacturing.
Testimonial
"The I-Connect007 team is outstanding—kind, responsive, and a true marketing partner. Their design team created fresh, eye-catching ads, and their editorial support polished our content to let our brand shine. Thank you all! "
Sweeney Ng - CEE PCBSuggested Items
NEDME Returns October 22 — The Northwest’s Premier Design & Manufacturing Expo
10/13/2025 | NEDMEThe Northwest Electronics Design & Manufacturing Expo (NEDME) returns on Wednesday, October 22, 2025, at Wingspan Event & Conference Center, Hillsboro. The event brings together engineers, product designers, manufacturers, educators, and community partners for a full day of industry connection, learning, and networking.
Critical Minerals: The New Power Play in Global Trade
10/13/2025 | Marcy LaRont, I-Connect007Access to critical minerals essential for electronics manufacturing, and China’s monopoly of them, is increasingly under scrutiny, with gallium (Ga) and germanium (Ge)at the forefront of this discourse. However, all critical minerals imported from China share a similar narrative, and understanding the implications of this dependency and the risks to both U.S. commercial and defense sectors has created an urgent need for a comprehensive electronics strategy to secure and diversify access to these vital minerals. In this candid interview, USPAE Executive Director Jim Will discusses the issues and the mitigation steps that must be taken to adequately address them.
Interposers, Substrates, and Advanced Manufacturing
10/13/2025 | Marcy LaRont, I-Connect007I attend a lot of industry trade shows and conferences. Lately, during conversations with technologists, I’ve noticed that there is some confusion about what exactly constitutes an interposer. One question I hear every so often is, “Are all interposers substrates?” The short answer to that question is no. But some interposers are, in fact, full substrates.
New Course Presents a Comprehensive Guide to IPC Standards
10/10/2025 | Marcy LaRont, I-Connect007Francisco Fourcade, electronics technology standards manager for the Global Electronics Association, has spent years helping companies understand and implement the standards that keep the electronics manufacturing industry moving forward. In this interview, he shares updates on ongoing standards development efforts and previews a new course, "IPC Standards: A Guide for the Electronics Industry,” which starts Oct. 14.
SASinno Americas Strengthens Field Service Capabilities with Addition of Oscar Ortiz González in Mexico
10/10/2025 | SASinno AmericasSASinno Americas is proud to announce the addition of Oscar Ortiz González as Senior Field Service Engineer, based in Mexico.