NASA to Provide Coverage of Boeing Orbital Flight Test for Commercial Crew
December 17, 2019 | NASAEstimated reading time: 2 minutes

The launch of Boeing’s Orbital Flight Test (OFT) to the International Space Station, as part of NASA’s Commercial Crew Program, is targeted for 6:36 a.m. EST Friday, Dec. 20. The uncrewed flight test will be the Boeing CST-100 Starliner’s maiden mission to the space station.
Live coverage will begin on NASA Television and the agency’s website Tuesday, Dec. 17, with prelaunch events.
Starliner will launch on a United Launch Alliance Atlas V rocket from Space Launch Complex 41 at Cape Canaveral Air Force Station in Florida. About 31 minutes after launch, Starliner will reach its preliminary orbit. It is scheduled to dock to the space station at 8:08 a.m. Saturday, Dec. 21. Starliner will carry about 600 pounds of crew supplies and equipment to the space station and return some critical research samples to Earth with a parachute-assisted landing at White Sands Missile Range, New Mexico at 5:47 a.m. Saturday, Dec. 28.
The flight test will provide valuable data on the end-to-end performance of the Atlas V rocket, Starliner spacecraft, and ground systems, as well as in-orbit, docking and landing operations. The data will be used as part of NASA’s process of certifying Boeing’s crew transportation system for carrying astronauts to and from the space station. NASA’s Commercial Crew Program is working with the American aerospace industry through a public-private partnership to launch astronauts on American rockets and spacecraft from American soil for the first time since 2011.
NASA TV mission coverage is as follows (all times are Eastern). Media unable to attend the prelaunch and postlaunch briefings in person may ask questions via a phone bridge. Please contact the Kennedy Press Site at 321-867-2468 on the day of the briefing for the bridge information.
Tuesday, Dec. 17
2 p.m. (no earlier than) – Prelaunch briefing from NASA’s Kennedy Space Center. Participants include:
- Kathy Lueders, manager, NASA Commercial Crew Program
- Joel Montalbano, deputy manager, International Space Station Program
- John Mulholland, vice president and program manager, Boeing Commercial Crew Program
- John Elbon, chief operating officer, United Launch Alliance
- Pat Forrester, astronaut office chief, Johnson Space Center
- Will Ulrich, launch weather officer, 45th Weather Squadron
Thursday, Dec. 19
9:30 a.m. – NASA Administrator Jim Bridenstine near the Countdown Clock with:
- Robert Cabana, director, Kennedy Space Center
- Mike Fincke, NASA Astronaut, Starliner Crew Flight Test
- Nicole Mann, NASA Astronaut, Starliner Crew Flight Test
- Chris Ferguson, Boeing Astronaut, Starliner Crew Flight Test
- Suni Williams, NASA Astronaut, Starliner first operational mission crew
- Josh Cassada, NASA Astronaut, Starliner first operational mission crew
Friday, Dec. 20
5:30 a.m. – NASA TV launch coverage begins for the 6:36 a.m. launch.
9 a.m. – Administrator postlaunch news conference. Participants include:
- NASA Administrator Jim Bridenstine
- Jim Chilton, Boeing senior vice president, Space and Launch Division
- Astronauts Chris Ferguson, Mike Fincke, and Nicole Mann
9:30 a.m. – Launch team postlaunch news conference
- Steve Stich, deputy manager, NASA Commercial Crew Program
- Boeing representative (to be determined)
- ULA representative (to be determined)
- Kirk Shireman, manager, International Space Station Program
Saturday, Dec. 21
5 a.m. – Coverage of rendezvous, docking and hatch opening
Friday, Dec. 27
8:15 a.m. – Coverage of hatch closing
11:45 p.m. – Coverage of undocking
Saturday, Dec. 28
4:30 a.m. – Coverage of deorbit and landing begins
The goal of NASA’s Commercial Crew Program is safe, reliable and cost-effective human space transportation to and from the International Space Station and low-Earth orbit, which could allow for additional research time and increase the opportunity for discovery aboard humanity’s testbed for exploration. Commercial partnerships are an important part of NASA’s Artemis program, which will send the first woman and next man to the Moon by 2024.
Suggested Items
Moog Announces Acquisition of COTSWORKS
07/07/2025 | BUSINESS WIREMoog Inc., a worldwide designer, manufacturer and systems integrator of high-performance precision motion and fluid controls and control systems, announced the acquisition of COTSWORKS Inc., an aerospace and defense fiber optics transceiver component manufacturer, for a purchase price of $63 million.
S&K Aerospace Awarded Major Contract Under DLA Maritime Acquisition Advancement Program
07/02/2025 | BUSINESS WIRES&K Aerospace, LLC has been awarded a significant contract under the Defense Logistics Agency’s (DLA) Maritime Acquisition Advancement Program, managed by the U.S. Naval Supply Command - Weapon Systems Support (NAVSUP WSS) in Mechanicsburg, PA.
Green Circuits to Exhibit Full-Service Electronics Manufacturing Solutions at 2025 SMD Symposium
07/02/2025 | Green CircuitsGreen Circuits, a full-service Electronics Manufacturing Services (EMS) partner to leading OEMs, is pleased to announce its participation in the 2025 SMD Symposium, taking place August 5-7 at the Von Braun Center in Huntsville, Alabama.
I-Connect007 Editor’s Choice: Five Must-Reads for the Week
06/27/2025 | Nolan Johnson, I-Connect007While news outside our industry keeps our attention occupied, the big news inside the industry is the rechristening of IPC as the Global Electronics Association. My must-reads begins with Marcy LaRont’s exclusive and informative interview with Dr. John Mitchell, president and CEO of the Global Electronics Association. For designers, have we finally reached the point in time where autorouters will fulfill their potential?
Knocking Down the Bone Pile: Tin Whisker Mitigation in Aerospace Applications, Part 3
06/25/2025 | Nash Bell -- Column: Knocking Down the Bone PileTin whiskers are slender, hair-like metallic growths that can develop on the surface of tin-plated electronic components. Typically measuring a few micrometers in diameter and growing several millimeters in length, they form through an electrochemical process influenced by environmental factors such as temperature variations, mechanical or compressive stress, and the aging of solder alloys.