-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueSales: From Pitch to PO
From the first cold call to finally receiving that first purchase order, the July PCB007 Magazine breaks down some critical parts of the sales stack. To up your sales game, read on!
The Hole Truth: Via Integrity in an HDI World
From the drilled hole to registration across multiple sequential lamination cycles, to the quality of your copper plating, via reliability in an HDI world is becoming an ever-greater challenge. This month we look at “The Hole Truth,” from creating the “perfect” via to how you can assure via quality and reliability, the first time, every time.
In Pursuit of Perfection: Defect Reduction
For bare PCB board fabrication, defect reduction is a critical aspect of a company's bottom line profitability. In this issue, we examine how imaging, etching, and plating processes can provide information and insight into reducing defects and increasing yields.
- Articles
- Columns
- Links
- Media kit
||| MENU - pcb007 Magazine
Boeing, Salt River Project Sign Renewable Energy Agreement for Mesa Site
September 11, 2020 | BoeingEstimated reading time: 1 minute
Boeing and the Salt River Project (SRP) utility have signed a multi-year agreement to power Boeing’s Mesa site with renewable solar energy.
Boeing will be one of several companies to receive power from SRP’s soon-to-be-built 100-megawatt solar photovoltaic plant in Eloy, Arizona. Boeing’s Mesa site will receive about 25% of its electricity needs from this plant over the next 15 years. This supports the company’s overall goal to reduce greenhouse gas emissions 25% by 2025, and ultimately power operations with 100% renewable energy.
“It makes sense to take advantage of renewable solar energy at a location that enjoys 295 days of sunshine a year,” said Beth Schryer, Boeing vice president of Facilities & Asset Management. “This will help offset the same amount of energy equivalent to that used in one year by 670 average U.S. homes.”
SRP’s 700-acre Eloy plant is expected to begin operation in December 2021. Located approximately 50 miles from the plant is Boeing’s Mesa site. The Mesa site produces Apache helicopters and houses various corporate, commercial and defense teams in more than 40 buildings. Boeing employs more than 4,600 people in Arizona, with most based in Mesa.
“Boeing’s longstanding vision of improving the environment and reducing carbon emissions is a natural fit for the SRP Sustainable Energy Offering,” said Jim Pratt, SRP Associate General Manager and Chief Customer Executive. “We appreciate customers like Boeing working with us on this collaborative initiative to invest in renewable energy that not only helps them achieve their aerospace industry sustainability goals, but does so at an affordable cost.”
This agreement expands Boeing’s leadership in the use of renewable energy and energy efficiency. Two Boeing sites – Renton, Washington, and Charleston, South Carolina – use 100% renewable energy today. The company is also ranked 17th on the EPA’s Green Power Partnership Fortune 500® Partners List, and has been named an EPA ENERGY STAR® Partner of the Year for 10 years running.
Suggested Items
TT Electronics Secures Multi-Million-Pound Defense Contract with Ultra PCS
07/18/2025 | TT ElectronicsTT Electronics, a leading provider of global manufacturing solutions and engineered technologies, announced that it has been awarded a significant new contract with long-standing customer Ultra PCS Ltd (Ultra Precision Control Systems).
NEOTech’s Agave 1 Facility Earns AS9100 Certification for Commercial Aerospace Manufacturing Excellence
07/17/2025 | NEOTechNEOTech, a premier provider of electronic manufacturing services (EMS), integrated design engineering, and advanced supply chain solutions for the aerospace and defense, medical device, and high-tech industrial markets, proudly announces that its Agave 1 manufacturing facility in Juarez, Mexico has officially received AS9100 certification.
Federal Electronics Invests in HydroJet Inline Cleaning Technology at Hermosillo Facility
07/15/2025 | Federal ElectronicsFederal Electronics, a leader in providing advanced electronic manufacturing services, has strengthened the advanced cleaning capabilities of its Hermosillo, Mexico facility with the recent installation of a HydroJet Inline Cleaner from Austin American Technology (AAT).
FTG Announces Q2 2025 Financial Results
07/09/2025 | Globe NewswireFiran Technology Group Corporation announced financial results for the second quarter 2025. Revenue: Recorded at $48.7 million, a 25.6% increase over Q2 2024.
Moog Announces Acquisition of COTSWORKS
07/07/2025 | BUSINESS WIREMoog Inc., a worldwide designer, manufacturer and systems integrator of high-performance precision motion and fluid controls and control systems, announced the acquisition of COTSWORKS Inc., an aerospace and defense fiber optics transceiver component manufacturer, for a purchase price of $63 million.