Share on:

Share on LinkedIn Share on X Share on Facebook Share with email

Suggested Items

Collins Aerospace Approved to Begin Full Rate Production of MAPS Gen II system

03/13/2025 | Collins Aerospace
Collins Aerospace, an RTX business, has received approval for Full Rate Production of the Mounted Assured Positioning, Navigation and Timing (PNT) Generation II system (MAPS GEN II).

Hon Hai Research Institute Launches Traditional Chinese LLM With Reasoning Capabilities

03/13/2025 | PRNewswire
Hon Hai Research Institute announced today the launch of the first Traditional Chinese Large Language Model (LLM), setting another milestone in the development of Taiwan's AI technology with a more efficient and lower-cost model training method completed in just four weeks.

Speaking the Same Language as Your Fabricator

03/12/2025 | Andy Shaughnessy, Design007 Magazine
We do indeed have a failure to communicate; designers and fabricators often seem to be talking past each other, which can lead to jobs being put on hold. We asked Jen Kolar, VP of engineering for Monsoon Solutions, and columnist Kelly Dack to share their thoughts on ways that we can break down the communication barrier between design and fabrication. As they point out, a design kickoff checklist and a solid review process can be invaluable tools in a designer’s toolbox.

IPC Global Standards Driving Factory of the Future

03/10/2025 | Chris Jorgensen, IPC
Factory of the Future represents a revolutionary shift in electronics manufacturing, aligning the industry's processes with the demands of efficiency, innovation, and sustainability. With challenges such as rapid product lifecycles, stringent quality requirements, and increasing emphasis on environmental responsibility, stakeholders across the supply chain—OEMs, EMS providers, and PCB manufacturers—face mounting pressure to modernize their operations.

Curtiss-Wright Receives $18 Million Follow-On Order from U.S. Marine Corps

03/07/2025 | BUSINESS WIRE
Curtiss-Wright’s Defense Solutions Division today announced it has received a follow-on order from the U.S. Marine Corps, PEO Land Systems, via Defense Logistics Agency - Tailored Logistic Support (DLA-TLS) contract, to provide its Modular Open Systems Approach (MOSA) based tactical communications technology for use in the Application Server Module (ASM), part of the Combat Data Network (CDN) program.
Copyright © 2025 I-Connect007 | IPC Publishing Group Inc. All rights reserved. Log in