NASA Taps Axiom Space for First Artemis Moonwalking Spacesuits
September 9, 2022 | NASAEstimated reading time: 2 minutes

NASA has selected Axiom Space to deliver a moonwalking system for the Artemis III mission, which will land Americans on the surface of the Moon for the first time in over 50 years. This award – the first one under a competitive spacesuits contract – is for a task order to develop a next generation Artemis spacesuit and supporting systems, and to demonstrate their use on the lunar surface during Artemis III.
With this award, NASA has put in place another cornerstone of returning astronauts to the Moon under Artemis to support continued scientific breakthroughs, benefiting humanity back on Earth. As part of its planned human lunar spaceflight missions, NASA will land the first woman and first person of color on the Moon.
After reviewing proposals from its two eligible spacesuit vendors, NASA selected Axiom Space for the task order, which has a base value of $228.5 million. A future task order will be competed for recurring spacesuit services to support subsequent Artemis missions.
“NASA is proud to partner with commercial industry on this historic mission that will kickstart the United States building a lasting presence on the surface of the Moon,” said Lara Kearney, manager of NASA’s Extravehicular Activity and Human Surface Mobility program. “What we learn on Artemis III and future missions on and around the Moon will pave the way for missions to Mars. Spacesuits enable us to literally take that next step.”
Using more than 50 years of spacesuit expertise, NASA defined the technical and safety requirements for the next generation of spacesuits. Axiom Space will be responsible for the design, development, qualification, certification, and production of its spacesuits and support equipment that will meet these key agency requirements for Artemis III.
NASA experts will maintain the authority for astronaut training, mission planning, and approval of the service systems. Axiom Space will be required to test the suits in a spacelike environment before Artemis III.
Under the indefinite delivery and indefinite quantity of the Exploration Extravehicular Activity Services contract, eligible industry partners compete for task orders that will provide a full suite of capabilities for NASA’s spacewalking and moonwalking needs during the period of performance through 2034.
Future task orders under the contract will consist of recurring lunar landings, the development of spacesuits for use in low-Earth orbit outside the International Space Station, and special studies. The agency is currently evaluating task order options for space station spacesuits.
The spacesuits contract, which will advance spacewalking capabilities in low-Earth orbit and on the Moon, is managed by the Extravehicular Activity and Human Surface Mobility Program (EHP) at the agency’s Johnson Space Center in Houston.
Through Artemis, NASA will land the first woman and the first person of color on the Moon, paving the way for a long-term, sustainable lunar presence and serving as a steppingstone for future astronaut missions to Mars.
Testimonial
"In a year when every marketing dollar mattered, I chose to keep I-Connect007 in our 2025 plan. Their commitment to high-quality, insightful content aligns with Koh Young’s values and helps readers navigate a changing industry. "
Brent Fischthal - Koh YoungSuggested Items
Driving Innovation: Depth Routing Processes—Achieving Unparalleled Precision in Complex PCBs
09/08/2025 | Kurt Palmer -- Column: Driving InnovationIn PCB manufacturing, the demand for increasingly complex and miniaturized designs continually pushes the boundaries of traditional fabrication methods, including depth routing. Success in these applications demands not only on robust machinery but also sophisticated control functions. PCB manufacturers rely on advanced machine features and process methodologies to meet their precise depth routing goals. Here, I’ll explore some crucial functions that empower manufacturers to master complex depth routing challenges.
Polar Instruments Announces Additive Transmission Line Support for Si9000e
08/20/2025 | Polar InstrumentsTransmission lines embedded into the PCB surface are a feature of UHDI constructions. The 2025 fall release of Polar's Si9000e PCB impedance & insertion loss transmission line field solver incorporates eight new single ended, differential and coplanar transmission line structures.
Henniker Plasma Launches Stratus Turnkey Plasma Manufacturing Cell
08/13/2025 | Henniker PlasmaHenniker Plasma, a leading manufacturer of plasma treatment systems, proudly announces the launch of its Stratus Plasma Manufacturing Cell range — a fully integrated, turnkey solution that combines advanced atmospheric plasma surface treatment with robotic automation.
Trouble in Your Tank: Metallizing Flexible Circuit Materials—Mitigating Deposit Stress
08/04/2025 | Michael Carano -- Column: Trouble in Your TankMetallizing materials, such as polyimide used for flexible circuitry and high-reliability multilayer printed wiring boards, provide a significant challenge for process engineers. Conventional electroless copper systems often require pre-treatments with hazardous chemicals or have a small process window to achieve uniform coverage without blistering. It all boils down to enhancing the adhesion of the thin film of electroless copper to these smooth surfaces.
Designers Notebook: Basic PCB Planning Criteria—Establishing Design Constraints
07/22/2025 | Vern Solberg -- Column: Designer's NotebookPrinted circuit board development flows more smoothly when all critical issues are predefined and understood from the start. As a basic planning strategy, the designer must first consider the product performance criteria, then determine the specific industry standards or specifications that the product must meet. Planning also includes a review of all significant issues that may affect the product’s manufacture, performance, reliability, overall quality, and safety.