-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueThe Legislative Outlook: Helping or Hurting?
This month, we examine the rules and laws shaping the current global business landscape and how these factors may open some doors but may also complicate business operations, making profitability more challenging.
Advancing the Advanced Materials Discussion
Moore’s Law is no more, and the advanced material solutions to grapple with this reality are surprising, stunning, and perhaps a bit daunting. Buckle up for a dive into advanced materials and a glimpse into the next chapters of electronics manufacturing.
Inventing the Future With SEL
Two years after launching its state-of-the-art PCB facility, SEL shares lessons in vision, execution, and innovation, plus insights from industry icons and technology leaders shaping the future of PCB fabrication.
- Articles
- Columns
- Links
- Media kit
||| MENU - pcb007 Magazine
U.S. Circuit Acquires AS9100 Certification
November 3, 2023 | U.S. CircuitEstimated reading time: Less than a minute

U.S. Circuit, a premier supplier of commercial and mil/aero PCBs, has recently obtained their AS9100 certification.
AS9100 certification expands on the ISO9001 quality standards and adds additional regulatory requirements and notations pertaining specifically to aerospace quality needs. AS9100 is backed by the International Aerospace Quality Group (IAQG).
This certification will allow U.S. Circuit to further expand their military and aerospace offerings to further serve sectors requiring stricter regulation including the Department of Defense (DoD), National Aeronautics and Space Administration (NASA), and the Federal Aviation Administration (FAA).
Harry Patel, CEO of U.S. Circuit, stated, “We are proud to have received this important certification. I applaud the team’s dedication to improving our process across the board, enhancing the service of our military and aerospace customers. This certification will give them added confidence in our ability to deliver the highest quality printed circuit boards possible.”
Testimonial
"Our marketing partnership with I-Connect007 is already delivering. Just a day after our press release went live, we received a direct inquiry about our updated products!"
Rachael Temple - AlltematedSuggested Items
Rogers Announces Transition of Board Chair and Plans to Add New Independent Director
10/17/2025 | Rogers CorporationRogers Corporation announced that Peter Wallace, Chair of the Board of Directors, has informed the Board of his decision not to stand for re-election at the Company’s 2026 Annual Meeting of Shareholders.
HT Global Circuits Adds Two atg Luther & Maelzer Flying Probe Test Systems
10/15/2025 | atg Luther & Maelzer GmbHAtg Luther & Maelzer GmbH, a leading supplier of electrical testing solutions for the PCB industry, and IEC USA, a distributor of consumables, equipment, and services in the North American PCB market, confirm the order for high-speed bare board testing technology.
Cicor Posts Strong Order Intake in a Continued Challenging Environment
10/15/2025 | CicorThe Cicor Group continued its growth path during the third quarter of 2025. Quarterly sales increased by 33% to CHF 160.1 million (YTD: CHF 440.8 million, an increase of 25.4%).
Episode 6 of Ultra HDI Podcast Series Explores Copper-filled Microvias in Advanced PCB Design and Fabrication
10/15/2025 | I-Connect007I-Connect007 has released Episode 6 of its acclaimed On the Line with... American Standard Circuits: Ultra High Density Interconnect (UHDI) podcast series. In this episode, “Copper Filling of Vias,” host Nolan Johnson once again welcomes John Johnson, Director of Quality and Advanced Technology at American Standard Circuits, for a deep dive into the pros and cons of copper plating microvias—from both the fabricator’s and designer’s perspectives.
Ibiden Opens Ono Plant to Expand AI Server IC Substrate Production Capacity
10/14/2025 | IBIDENIBIDEN Co., Ltd. announces that it held the opening ceremony for its Ono Plant on October 10, 2025 in Ono Town, Ibi District, Gifu Prefecture. Construction work and preparations for mass production at the plant had been underway.