Share on:

Share on LinkedIn Share on X Share on Facebook Share with email

Suggested Items

NASA Plans to Assign Missions for Two Future Artemis Cargo Landers

12/02/2024 | NASA
NASA, along with its industry and international partners, is preparing for sustained exploration of the lunar surface with the Artemis campaign to advance science and discovery for the benefit of all. As part of that effort, NASA intends to award Blue Origin and SpaceX additional work under their existing contracts to develop landers that will deliver large pieces of equipment and infrastructure to the lunar surface.

Intel Unlocks New Laptop Efficiency with Speed

09/04/2024 | Intel
The laptop improvement people ask for the most – you can probably guess – is better battery life. Nobody enjoys hunting for power outlets in airports.

Intuitive Machines Strengthens Lunar Service Capabilities with $116.9 million NASA Lunar Contract Award

08/30/2024 | Globe Newswire
NASA has awarded Intuitive Machines, Inc., a leading space exploration, infrastructure, and services company, a $116.9 million contract to deliver six science and technology payloads, including one European Space Agency-led drill suite to the Moon’s South Pole.

Nokia, Axiom Space Partner to Enable High-speed Cellular Network Capabilities in Next-gen Lunar Spacesuits

08/22/2024 | Globe Newswire
Nokia has partnered with Axiom Space to integrate advanced 4G/LTE communication capabilities into the next-generation spacesuits that will be used for the Artemis III lunar mission.

ispace RESILIENCE Lunar Lander Successfully Achieves Testing Milestone in Preparation for Mission 2

06/28/2024 | BUSINESS WIRE
ispace, inc., a global lunar exploration company, announced today that the flight model of its HAKUTO-R Mission 2 RESILIENCE lunar lander has successfully completed thermal vacuum testing and remains on schedule for a Winter 2024 launch.
Copyright © 2024 I-Connect007 | IPC Publishing Group Inc. All rights reserved. Log in