Share on:

Share on LinkedIn Share on X Share on Facebook Share with email

Testimonial

"Advertising in PCB007 Magazine has been a great way to showcase our bare board testers to the right audience. The I-Connect007 team makes the process smooth and professional. We’re proud to be featured in such a trusted publication."

Klaus Koziol - atg

Suggested Items

Boeing Delivers Second ViaSat‑3 Satellite to Viasat

09/30/2025 | BAE Systems
Boeing has delivered ViaSat‑3 F2, the second spacecraft in Viasat’s next‑generation, ultra‑high‑capacity constellation.

Target Condition: Rethinking the PCB Stackup Recipe

10/01/2025 | Kelly Dack -- Column: Target Condition
Marie Antoinette is attributed with saying, “Let them eat cake,” but historians now agree she likely never said it. It was probably revolutionary propaganda to paint her as out of touch with the starving masses. Yet, the phrase still lingers, and oddly enough, it applies to the world of PCB design.

Aismalibar North America Showcases Advanced Thermal Management Solutions at The Battery Show North America 2025

09/18/2025 | Aismalibar
Aismalibar North America, a leader in high-performance thermal management solutions, will present its latest innovations at The Battery Show North America and Electric & Hybrid Vehicle Technology Expo 2025 in Detroit, Michigan, October 6–9, 2025, where attendees can meet the team at Booth #5929 to explore materials engineered for demanding EV and high-power electronics.

Target Condition: Floor Planning Without a Floor

08/27/2025 | Kelly Dack -- Column: Target Condition
By a show of hands, how many PCB designers have been asked to start a layout without a board outline, keep-out zones, or even height constraints? How many have had to work within a specific enclosure before the schematic was finalized? If this sounds familiar, you're not alone. Starting a PCB layout without critical constraints is like hiring an interior designer to buy furniture and carpet for a house you haven’t even purchased yet, or, even worse, trying to fit four bedrooms' worth of furniture in a one-room cabin.

L3Harris Delivers Electric Thrusters for Lunar-Orbiting Gateway

08/12/2025 | L3Harris Technologies
L3Harris Technologies has delivered three Advanced Electric Propulsion System (AEPS) thrusters to NASA for final testing before integrating them into the Power and Propulsion Element of the lunar-orbiting Gateway station.
Copyright © I-Connect007 | IPC Publishing Group Inc. All rights reserved. Log in