-
- News
- Books
Featured Books
- pcb007 Magazine
Latest Issues
Current IssueIt's Show Time!
In this month’s issue of PCB007 Magazine we reimagine the possibilities featuring stories all about IPC APEX EXPO 2025—covering what to look forward to, and what you don’t want to miss.
Fueling the Workforce Pipeline
We take a hard look at fueling the workforce pipeline, specifically at the early introduction of manufacturing concepts and business to young people in this issue of PCB007 Magazine.
Inner Layer Precision & Yields
In this issue, we examine the critical nature of building precisions into your inner layers and assessing their pass/fail status as early as possible. Whether it’s using automation to cut down on handling issues, identifying defects earlier, or replacing an old line...
- Articles
- Columns
Search Console
- Links
- Media kit
||| MENU - pcb007 Magazine
Statistically Testing Inner Layer Yield Improvement Projects
December 18, 2024 | Dr. Patrick Valentine, UyemuraEstimated reading time: 2 minutes

Can we trust our measurement system to give us reliable data? Is it accurate, repeatable, and reproducible? Measurement is the foundation of quality. We measure for two primary reasons: to make decisions on product quality and to provide data that will inform continuous improvement projects. We can engage in continuous improvement projects if we are confident in our measurement systems.
What is the primary skill for which we are on the payroll? It is our problem-solving skills. Therefore, our function is to solve problems and add value. Dr. Joseph M. Juran stated, "A project is a problem scheduled for solution."1
Projects need to be connected to business strategies. Their importance must be clear to the organization. They must have the support and approval of management and be tied to the organization's financials. They need a reasonable scope, typically doable in under six months for Plan-Do-Check-Act (PDCA) or Define-Measure-Analyze-Improve-Control (DMAIC) projects. Note that sub-projects may be required first. Project goals must be well-defined, and there must be clear quantitative measures of success. Projects need to be looked at from a statistical point of view.
Statistical thinking views all work as a process and acknowledges that variation exists in all processes. Knowledge and management of variation are crucial for sustained success. For any given process, the output (Y) is a function of the inputs (X): Y = f(X1, X2…Xn) + error, where the error is assumed to be random variation.
Statistics and Probability
Statistics is a branch of mathematics that collects, analyzes, interprets, and presents numerical data. It is not merely the science of analyzing data but the art and science of collecting and analyzing data. Statistics are tools to help us; they do not replace the process engineer’s skill and intelligence. Statistics uses hypotheses, experiments, and hypothesis testing.
With hypotheses, a null (H0) and an alternative (H1) are put forth. The null hypothesis states that two population means or variances are equal. The alternative hypothesis is a statement that the two population means or variances are not equal (two-tailed). However, the alternative hypothesis can be either one or two-tailed. The one-tail tests for either inferiority or superiority, while the two-tail tests for parity (not equal). Typically, we test for parity, which tests for both inferiority and superiority.
To read this entire article, which appeared in the December 2024 issue of PCB007 Magazine, click here.
Suggested Items
Lockheed Martin, Nokia, and Verizon Advance Defense Capabilities Through 5G.MIL® Collaboration
03/04/2025 | Lockheed MartinLockheed Martin, Nokia, and Verizon announced the successful integration of Nokia's industry-leading, military-grade 5G solutions into Lockheed Martin's 5G.MIL® Hybrid Base Station (HBS).
Dell Technologies Accelerates Telecom Transformation with Comprehensive Program, Expanded Partnerships
02/27/2025 | BUSINESS WIREDell Technologies announces the Open Telecom Transformation Program and new AI solutions to simplify and accelerate network cloud transformation for communications service providers (CSPs).
iNEMI Hosts Two Sessions at IPC APEX EXPO, Focus on Roadmap for PCB, Assembly, and Laminates
02/26/2025 | iNEMIThe International Electronics Manufacturing Initiative (INEMI) will have two forward-looking sessions at the upcoming IPC APEX EXPO in Anaheim, California (March 18-20). Both sessions are open to conference attendees with a (free) Event Essentials Pass. The two sessions are outlined below.
Airbus to Build Communication Network for the French Air and Naval Force, Stage 3
02/25/2025 | AirbusThe French Defence Procurement Agency (DGA) has awarded the contract for the IP Network of the Naval Force (RIFAN) stage 3 to an industrial consortium led by Airbus Defence and Space and also comprising Naval Group.
NEC Develops Near Real-time RIC for High Performance 5G vRAN
02/21/2025 | JCN NewswireNEC Corporation has developed a Near Real-time RAN Intelligent Controller (Near-RT RIC) platform and RIC applications that enable flexible and intelligent network control that is compliant with the O-RAN Alliance specifications for virtualized Radio Access Networks (vRAN).