Design for Test: A New Book from The Test Connection, Inc.
April 23, 2026 | Real Time with... APEX EXPOEstimated reading time: 1 minute
Bert Horner, president of The Test Connection Inc., shares insights on designing for testability (DFT) challenges with Kelly Dack. Horner discusses the critical need for incorporating testability early in the design process and the importance of quantifiable metrics for measuring test coverage. He highlights The Test Connection's role in transferring decades of 'tribal knowledge' to emerging engineers through training and education. Look for "The Printed Circuit Assembler's Guide to... Design for Test, A Practical Guide to Test and Inspection" in the I-007eBooks library.
APEX EXPO 2026 has concluded successfully. If you couldn’t make it to the show, don’t worry, the I-Connect007 team has coverage of the entire week’s events. Watch your inbox on Fridays over the next several weeks for our complete coverage, delivered directly to your inbox, or visit Real Time with… APEX EXPO 2026 now for video interviews with the movers and shakers of the electronics industry.
Testimonial
"Advertising in PCB007 Magazine has been a great way to showcase our bare board testers to the right audience. The I-Connect007 team makes the process smooth and professional. We’re proud to be featured in such a trusted publication."
Klaus Koziol - atgSuggested Items
Separating Fact from Fear on the FCC ‘China Lab Ban’
05/14/2026 | Jan Pedersen, NCAB GroupRecent news headlines have suggested that the U.S. Federal Communications Commission (FCC) has “banned all testing laboratories in China and Hong Kong.” Understandably, this has created concerns around PCB testing, material approvals, UL listings, and the continued use of established test laboratories in Asia. The good news is that for most PCB, PCB material, and PCBA testing, nothing has changed. Let’s separate fact from fear.
yieldWerx, WATS Partner to Bridge PCB Test with Chip-Level Manufacturing Data
05/11/2026 | PRNewswireBoard-level and semiconductor test data are often analyzed separately, limiting correlation across the product lifecycle. Linking PCB assembly (PCBA) test results, including in-circuit and functional test, with upstream wafer, sort, and final test data remains difficult, particularly in photonics, advanced packaging, and high-density integration environments.
SPEA Expands Global Footprint with New Hub in Santa Clara, Silicon Valley
05/08/2026 | SPEASPEA has officially landed in the heart of Silicon Valley, with the grand opening of its newest facility in Santa Clara, California.
More Than Electrical Test: TTCI to Spotlight X-ray and CT Capabilities at SMTA Capital Expo
05/07/2026 | TTCIThe Training Connection LLC (TTC-LLC) will exhibit at the SMTA Capital Expo on Thursday, May 14 at the DoubleTree by Hilton Baltimore - BWI Airport.
The Test Connection, Inc. Adds Experienced Test Engineer to Expand Flying Probe and ICT Capabilities
05/06/2026 | The Training Connection LLCThe Training Connection LLC (TTC-LLC) has hired Hermes Gonzalez as a Test Development Engineer, adding deep experience in flying probe and in-circuit test (ICT) to its engineering team.