Share on:

Share on LinkedIn Share on X Share on Facebook Share with email

Testimonial

"Your magazines are a great platform for people to exchange knowledge. Thank you for the work that you do."

Simon Khesin - Schmoll Maschinen

Suggested Items

Sikorsky to Integrate MATRIX™ Autonomy into BETA Technologies’ MV250

07/20/2026 | Lockheed Martin
Sikorsky, a Lockheed Martin company, announced that it will integrate its proven MATRIX™ autonomy suite into BETA Technologies’ ALIA MV250 hybrid-vertical‑take‑off‑and‑landing (hVTOL) aircraft.

Elementary, Mr. Watson: The Design Matrix—Revealing the Hidden Truths of Reality

05/12/2026 | John Watson -- Column: Elementary, Mr. Watson
“It seems you've been living two lives.” In one life, you're the respectable and responsible PCB design professional who follows the rules, works, pays taxes, meets deadlines, runs the checks, and even helps the landlady take out her garbage. In the other life, you’re the PCB designer who senses that something is wrong, searches for the deeper meaning behind their work, and can no longer fully accept the design world exactly as it has been presented. Welcome to the Design Matrix.

Matrix Electronics Expands Operations in Europe

12/22/2025 | Matrix Electronics
Matrix Electronics is pleased to announce they are executing on plans to establish a Distribution Centre in Reiskirchen, Germany. This new facility will have Matrix’s  Engineering Team will begin installing automated equipment with a fully operational date of April 1st, 2026.

Panasonic Appoints Matrix as its Authorized Distributor in Europe

06/03/2025 | Matrix Electronics
Effective July 1st, 2025, Panasonic Industry Co., Ltd. has appointed Matrix Electronics Limited as its Authorized Distributor in the European region. 

Driving Innovation: Traceability in PCB Production

05/29/2025 | Kurt Palmer -- Column: Driving Innovation
Traceability across the entire printed circuit board production process is an increasingly important topic among established manufacturers and companies considering new PCB facilities. The reasons are apparent: Automatic loading of part programs, connection with MES systems and collection of production data, and compliance with Industry 4.0 requirements
Copyright © I-Connect007 | IPC Publishing Group Inc. All rights reserved. Log in